Get complete information related to latest Beater Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Beater Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Beater Scrap Tenders.
Tender For supply of foolscap book 200 pages , notebook for essay 50 pages , notebook for english essay 50 pages , compass box , color box , a4 size paper , stapler small size , stapler pin small size box , stapler pin big size box , red tag judy , lily tag judy , white board marker pen , ghoda file , scissors large , scissors medium , glue , kothar register , u pin box , trial certificate book , character certificate book , voucher book , daily attendance book , l.c verification book , drawing paper sheet , cello tape 2 inches , cello tape 1 x 5 inches , cello tape 1 inch , highlighter , answer book 16 pages , answer book 12 pages , supplement 04 pages , flap tag , graphbook std 10 , nakshapothi std 10 , prayogpothi std 10 , drawing book std 9 , graphbook std 9 , nakshapothi std 9 , prayogpothi std 9 , red pen , black pen , spring file , stamp pad blue , stamp pad red , stamp pad ink blue , color chalk box , collection for science stream , footer 1 foot steel , a4 size colored paper sheet , daily education notebook , observation book , parikshan book , bundle slip , minia dori packet , whitener , sutri kg , attendance sheet annual , attendance sheet for hostel , blade cutter large , fevicol 100 ml bottle , sketch pen set , cello tape cutter , punch large , tankani box , reading desk , assessment work book , exam attendance sheet , folder page a4 size transparent , folder file button , khaki cover small , khaki cover large , sketch pen packet , double side tape roll , letterpad , lc book , pencil , rubber , drawing paper large , paper for toran packet , chart paper large , rangoli colors kg , set of books for standard 12 gket neet
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit; supply installation commissioning and succesfull trial of mill drive with 450kw ac vfd motor planetary gear box and rope less coupling with all acces..
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For service of vacuum filter and supply of its spares and cluster nozzle - vacuum filter spares & service, s.s. screen having 625 holes/sq. inches. (salem make) (minimum weight 1.2 kg. each screen), brass zigzag strips (2 long), rubber hose pipe (2 " x 24"), mud scrapper 5"x10 mm x 6 ply (dunlop make) for 8 x 16 vaccum filter, araldite 1.8 kg. pack, m-seal 1 kg. packing (pidilite make), a) brass end strip, b) s.s. end strip, copper revit round head 5mm x 12mm, copper revit rounf head 5mm x 15mm, copper revit rounf head 5mm x 18mm, soft lead 8 mm wire, brass tube plate for 8x16 vaccum filter, ss electrode (no 12) 2.5 mm thick, roller for mud conveyor belt, ss clamp for binding rubber hose pipe 2 1/4"x24", s s bolt 1/4"x3/4", s.s. channel 16 long, monarch brass nozzles, m s shocket for monarch brass nozzles, junction box (s.s. sheet) from 3mm thick plate heavy duty, s.s. nipple for decking plate (as per sample), s.s. decking plate for 8x16 (as per our site vacuum filter), s. s. binding strip 3/4" x 2-1/4, s. s. pipe 1.5mm thick, size= 1/2 x 46 , s. s. pipe 1.5mm thick, size= 1/2" x 65 , s. s. pipe 1.5mm thick, size= 1/2" x 16.5 , s. s. pipe 1.5mm thick, size= 1/2 x 28 , s. s. pipe 1.5mm thick, size= 3/4 x 7, s. s. pipe 1.5mm thick, size= 3/4 x 6.5, s. s. pipe 1.5mm thick, size= 3/4 x 10, round head s.s. screw " x 3/4", s.s. electrodes (no. 10) thikness 3.15 mm, vacuum filter vacuum disc plate (brass/gun matel) complete set (left & right), s.s. gate valve (screw type) 2 size, s.s. electrodes (no. 8) 4mm size, servicing of vacuum filter, after dismantling of s.s. screens of vacuum filter no. 1, 2 & 3, cleaning of decking plates, conducting hydraulic testing of five way fitting connections and giving satisfactory leak proof trials of same and thereafter refitting of all the dismantled s.s. screens complete in all respect, fitting of new damaged five way fittings (complete with welding etc.) of vacuum filter no. 1, 2 & 3 and thereafter conducting satisfactory leak proof trials. (5 way fitting), replacement of damaged decking plate nipples of vacuum filter no. 1, 2 & 3 and welding with five ways fitting, thereafter conducting satisfactory leak proof trials., replacement of damaged end strips of vacuum filter with new strips complete in all respect and thereafter conducting satisfactory leak proof trials. half filter, replacement of damaged end strips of vacuum filter no. 3 with new strips complete in all respect and thereafter conducting satisfactory leak proof trials. full filter, replacement of damaged brass/s.s. channels (16 ft. lengthl) of vacuum filter with new s.s/ brass channels complete in all respect, replacement of damaged decking plate of vacuum filter with new decking plate complete in all respect., dismantling & fitting both end s.s. tube of filter with vacuum distribution plate in filter and satisfactory trial., grinding of tunion valve plate with bear plate of vacuum filter and sucessful trial at minimum of 450mm of vacuum at junction with rotation of drum., vacuum genration up to 400mm at vacuum disc (including testing of pipe line to be made), keeping in the condition of genration of vacuum at vacuum pump was more then 625mm., repair of 8 point lubricator of vacuum filters (including cost of all un-serviceable parts), 3/8" bsp, non return valve, angle type, working pressure 21 kg./sq.cm. (as per sample), m.s. plug 3/8", m.s. plug 1/2", m.s. tee 3/8", m.s. elbow 3/8", supply of five way clusterwith nozzlefor mill mist colling system (complete in all respect) as per existingscope of workits including five way fitting branch line and nozzle.1- material- thermoplastic equivalent2- guarantee- one full crushing season, spray nozzle for mist cooling system
Tender For corrigendum : supply of 2000 kva e 1500 rpm, 415v, 0.80 pf lag , prime power dg set with radiator on common base frame. , fuel day tank of 990 litres capacity with accessories , 24v dc, 360 ah, minimum, lead acid automotive type battery , 24 v dc float cum boost battery charger , necessary fuel piping from day tank to engine , silencer , exhaust piping , with insulation and aluminium cladding upto 30 meters height with supports , galvanised pre-fabricated support structure for exhaust piping -common for two dg , acoustic enclosure for one dg with ventilation fans, exhaust fans, if applicable and lighting fixtures. , lt power, control and instrument cable including all accessories like lugs, glands, ties etc . , b- check kit filters to be supplied at the time of commissioning , first fill of lube oil, coolant and coolant conditioner to be supplied at the time of commissioning , tools and tackles for offered dg set. , alternator phase side and neutral side terminal box with ct , mandatory spares for dg sets and amf panel , amf panel for dg set , supervision of erection of dg set and accessories , supervision of testing, commissioning and load trial of dg set and accessories. , total freight charges for all supplies including spares
Tender For supply, fabrication, painting, transportation, erection, trial and commissioning of vertical lift sliding gate, embedded parts, steel hoist bridge, single stem nut type screw gear box all complete as per specification at batanalla near village birakr
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f
Tender For repair, reconditioning and maintenance of 12 x 8 m 5 nos radial gate, rg hoist 42 ton cap5 nos. by replacing old wornout both side and bottom replacing old wornout dial indicatorassembly ne, carring out work at dimbhe project. - repair, reconditioning and maintenance of 12 x 8 m - 5 nos radialgate, rg hoist 42 ton cap. - 5 nos. by replacing old wornout bothside and bottom rubber seal, replacing old wornout dial indicatorassembly new one, carring out welding work at downsteamside of skin plate, replacing of hyd. brake assembly with newem brake assembly, removing and grinding of spatter andwelding spot and cleaning to wall plate, sill plate to minimisefriction with rubber seal, servicing to guide roller, removingcover from trunion girder box, cleaning and painting insidetrunion girder box, replacing broken flange coupling, repairand reconditioning of 42 ton cap. hoist gear train by replacingwornout bearings, removing dry and old grease from gear andpinion by applying new, repair and strengthening of ladders from deck bridge top to hoist bridge and extended platform ofby welding replacing wornout chequrred plate from hoist bridgeand poeg cabin and platform, repair and maintenance of poeggate size 2.50 x 4.68 mtr. - 1 no. and its hoist 45 ton cap byreplacing wornout bearings, rubberseal and replacing em brakecomplete work with sand blasting, surface preparation applyingred oxide paint and coal tar paint and flat oil paint as perstandard practice with test and trial at dimbhe dam project.