Get complete information related to latest Belt Conveyor Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Belt Conveyor Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Belt Conveyor Spares Tenders.
Tender For ktps-vii stage chp mm removal or lifting of spilled coal from all transfer points and at all respective counter weight areas and below all the conveyor galleries etc and transporting to stock pile yards by tractor as and when required during the year 2025-26
Tender For btps - chp - removal of spilled over coal, fine dust and wet coal at head end area of bcn-1ab at tp-1 including fg floor, gallery area , mh-2, module-1 to 10 and tail end area at mh-1 including hgtu by head loads on to running conveyor from 01.04.2025 or from actual date of commencement of work to 31.07.2025.
Tender For tggenco ktpp chp oprn collection and transportation of spilled coal heaps by engaging the hired tractor or truck of 3.00 cum capacity from crusher house all transfer points of chp and achp under the conveyor galleries and transportation of consumables and materials from stores etc. for the period from 01.04.2025 or from actual date of utilization to 31.03.2026
Tender For loading and transportation of big coal lumps piled up below conveyor 5c near tt3 of ldcc system at chp:ext, htps, k.w. and unloading the same to coal yard of chp:int, htps, k.w.
Tender For supply of check list log sheets and books - operation check list for current readings as per format mu r c1 23 1 of 2 , operation check list for current readings as per format mu r c1 23 2 of 2 , operation check list for crusher a and b as per format mu r c1 09 1 of 2 , operation check list for crusher a and b as per format mu r c1 09 2 of 2 , operation check list for beltconveyor 5a 5b as per format mu r c1 12 1 of 2 , operation check list for beltconveyor 5a 5b as per format mu r c1 12 2 of 2 , operating hours of equipments as per format mu r c1 42 1 of 2 , operating hours of equipments as per format mu r c1 42 2 of 2 , operation check list for beltconveyor 1a 1b as per format mu r c1 08 1 of 2 , operation check list for beltconveyor 1a 1b as per format mu r c1 08 2 of 2 , operation check list list for beltconveyor 3a 3b as per format mu r c1 11 , safety work permit for external coal handling plant as per format 1 of 2 , safety work permit for external coal handling plant as per format 2 of 2 , line coupling check list as per format mu r ce 09 1 of 2 , line coupling check list as per format mu r ce 09 2 of 2 , details of work as per format mu c1 , contract work plan as per format mu c2 , work measurement as per format mu c3a , work measurement as per format mu c3b , cl record as per format mu c4 , my daily check list as per format mu c5
Tender For work of repairing of damaged conveyorbelt and replacement of connected parts and replacement/refitting of rollers/roller stands, lifting and releasing of conveyor take up etc. at coal handling plant of unit -1 to 7, wtps & gtps.
Tender For auction sale of u/s mixed iron and steel scrap(ms),u/s air heater element (basket) scrap,u/s cast steel scrap,u/s cast iron scrap,u/s stainless steel scrap (mixed),u/s bearing scrap,u/s gi sheet, tin cut pieces, rusted steel drum, wires etc,u/s rail material scrap (loco and wagan),u/s ms erw pipe scrap,u/s grinding roller of coal mill,u/s u/s 63 mva 220/132/33 kv auto transformer scrap without oil,u/s choke scrap,u/s electrical scrap (switch,scoket,regulator,light fittings,led lights etc),u/s lt motor scrap,u/s nylon conveyorbelt scrap,u/s used resin scrap,u/s waste (burnt) oil with drum,u/s transformer oil without drum,u/s u/s e-waste scrap
Tender For corrigendum : supply of sump pumps for conveyor-10a/b for pumping outrain/seepage water from sump pump pit at conveyor -10a/b drainswhich is connected mcc-1 area drains of mechanical maintenance-isub-division in coal handling plant
Tender For btps - chp - removal of spilled over coal, fine dust and wet coal at tail end, head end, along the bcn-4ab, 5ab, bcn-10, tp-3, tp-4 and erh area by head loads on to running conveyor for the period from 01.04.2025 or from actual date of commencement of work to 31.07.2025