Get complete information related to latest Belt Feeder Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Belt Feeder Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Belt Feeder Tenders.
Tender For btps-chp-regular and preventive periodical maintenance for beltfeeder-1,2,3 and 4 and flap gates as and when required in mm-ii sub division of mm/chp/btps for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
Tender For work contract for complete erection & installation of raw coal feeder outlet lower transition chute (model eg-3651) at 2x500 mw, abvtps, cspgcl, janjgir-champa.
Tender For corrigendum : emptying and cleaning of coal bunkers by water jet of fire hose pipe, for visual inspection of coal bunkers for repair / maintenance including removal of coal slurry from feeder floors during the coh of unit no. 01 and during aoh of unit no. 04 - emptying & cleaning of coal bunkers by water jet of fire hose pipe, for visual inspection of coal bunkers for repair / maintenance including removal of coal slurry from feeder floors due to keep neat & clean feeder floor during the coh of unit no. 01 and during aoh of unit no. 04. transportation of freshly removal coal from "0" meter level (ground floor) to chp yard by contractors own vehicle tractor trolley & labour as and when required.
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - coal mines; diversion/shifting of the existing 33kv oh line of simra/dhawater feeder near taljhari village at rajmahal ocp of rajmahal are; service provider
Tender For btps - chp - removal of spilled over coal, fine dust and wet coal at head end area of bcn-1a/b tunnel along the conveyor, tp-1 including fg-3 and 4 floor, mh-2, module-1 to 10 and tail end area at mh-1 including hgtu by head loads on to running conveyor, apron feeder floor and bcn-2ab tunnel including fg-1 and 2 floor by head loads on to running conveyor required in mm-i sub division of mm/chp/btps from 01.04.2026 or actual date of commencement of work to 31.07.2026.