Tender For btps-chp-regular maintenance and minor repair works of all mechanical equipment of stacker cum reclaimers-1 and 2 and preventive and breakdown maintenance of belt conveyors and conveyor equipment for bcn-8, bcn-9, boom conveyors intermediate conveyors and tipper conveyors as and when required in mm-iv sub division of mm/chp/btps for the period from 01.04.2026 or actual date of utilization of work to 31.03.2027
Tender For btps-chp-preventive and breakdown maintenance of gear box/ couplings/scoop couplings, belt conveyors and conveyor equipment for scrs and the conveyors bcn-8, bcn-9 as and when required mm-iv subdivision of mm/chp/btps for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Tender For corrigendum : tender for supply of ilms spares and modified roller of conveyor bw 1400 mm for chp rtps c c -geared coupling rg - 02 to be used in ilms. (make gbm) , tyre coupling rf - 03a to be used in ilms. (make gbm) , modified flat roller (roller tube dia 152.4 x 1600lg x 6.3thk erw is9295 spindle dia 65 at centre en8 bs970) with fitted bearing(no.21311ek) & plummer block (no. sn 611) at both end for 1400mm conveyor belt. , roller o/d 160mm x 1550mm facewidth with plummer block and bearing to be used in ilms. (reference drawing no.- 4-0810-90-dq-19 of electro zavod (india) pvt. ltd.) , s.s angle cleat( ss-304) for ilms belt , length-650mm , width-40mm , thickness-5mm , number of hole-04 nos. , endless ss cleated belt 1400mm bw , fr grade , 400/4ply , n/n , for ilms 1&2 (sl. no. of equipment-427 of electro zavod (india) pvt. ltd.) , endless ss cleated belt 1400mm bw , fr grade , 400/4ply , n/n , for ilms 3&4 (sl. no. of equipment-427 of electro zavod (india) pvt. ltd.)
Tender For providing of goods and transport service for over dimensional cargo (odc) - ground support equipment - conveyor belt loader,qty-01; any category of truck or trailer suitable to transport ground support equipment - conveyor belt loader ,qty- 01 as per dimensions m..
Tender For btps - chp - maintenance of conveyor equipment viz pulleys, bearings/sleeves of pulleys, realignment and geared coupling, periodical and breakdown works as and when required for the conveyors-bcn-1a/1b, 2a/2b, 3a/3b, reclaim belt conveyors-1 and 2, ilms and flap gates required in mm-i subdivision of mm/chp/btps for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.