Tender For supply of air walker / stroller double gym equipments, type: double, maximum user weight(kg): 120 kg, size/dimensions: 1500 milimeter, width: 500 milimeter, height: 1400 milimeter, main frame: 125 mm nominal bore g.i pipe, leg movement frame: 50 mm nominal bore g.i pipe, handle frame: 32 mm nominal borre g.i pipe (detailed description/specification as gem product # 1 of gem id no. 5116877-3264983223), make/brand: fitness world or similar, warranty: 24 months from the date of delivery. [ warranty period: 24 months after the date of delivery ]
Tender For short term re tender -supplying & erecting of gym equipments to the ladies hostel at mangalore university under aicte cafes project - treadmill, stationery air bike, elliptical cross trainer, rowing machine, cross walker, air walker, spinner, cycle, seated chest press, sit up station, leg press, pull up chair, waist twister, shoulder wheel, seated row, rider
Tender For corrigendum : supply of repair and rewinding e e - opening of transformer cover draining oil de-tanking core- coil assembly assessment and estimation for repair and replacement of parts providing locking arrangement of all valves and plugs , loading and unloading of transformer at side cph and firms work premises hiring , hv leg coil with insulation varnish and baking of coil assembling vacuum , lv leg coil with insulation varnish and baking of coil assembling vacuum impregnation new ec grade copper with insulation , set of gaskets rubberized cork neoprene material and size is needed for hv and lv , breather dehydrator silica gel type with fresh silica gel 01 kg , fresh transformer oil of standard quality as per the isi mark for main tank and oltc , double float buchholz relay including all accessories , air release valve including all accessories if required , magnetic oil gauge including all accessories if required , radiator valve including all accessories if required , reassembling of 3 15 mva transformer dyn 11 star delta connected with proper size of copper strip , replacement change of complete gaskets rubberized cork neoprene material , the oltc was completely repaired with the replacement , painting charges of transformer tank having hot oil resistant paint inside and synthetic enamel paint on transformer after cleaning of tank and complete painting outside etc as reqd. , less the cost of old and burned transformer oil plus old transformer oil of oltc , less the cost of old and dismantling insulated copper