Get complete information related to latest Biomass Disposal Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Biomass Disposal Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Biomass Disposal Tenders.
Tender For providing of custom bid for services - cleaning, sweeping and accumulating the swept waste in dumping area and removal of carcass of animals of total area of mysore railway colonies excluding area of residence and service building,custom bid for services - sweeping, cleaning and accumulating the swept waste in dumping area of total area of railway sports ground,custom bid for services - cleaning and desilting of open drainages of mysore railway colonies,custom bid for services - deweeding of unwanted bushes shrubs parthanium etc of total area of mysore railway colonies,custom bid for services - anti malarial fogging work at entire railway colonies and all offices,custom bid for services - anti malarial spraying work at entire area of railway colonies and all offices including all other anti-mosquito control including ant-larval , anti-adult and source reduction,custom bid for services - cleaning, sweeping and accumulating the swept waste in dumping area of total area of roads in entire railway colonies
Tender For custom bid for services - providing non-critical jobs at nashik lpg plant-manpower outsourcing services - man-days based; manpower outsourcing services - fixed remuneration; manpower outsourcing services - minimum wage: 1. segregation of dpt, and omc cylinders and without o-ring cylinders stacking the same: segregating of dpt, hr, cr, eis, ts, rejected, omc and without o-ring cylinders from conveyor during plant operation and stacking these cylinders at designated position as per officer in-charge. count of dpt, hr, eis, ts, rejected and omc cylinders to be provided box-lorry wise to unloading tallyman to record same on erv and unloading register. new o-ring need to place in without o-ring cylinders. removal, stacking and unlocking/locking of cylinders over chain conveyor & floor as and when required during plant operation as directed by officer in-charge. bpcl may ask the manpower to perform any other work/job during the shift as directed by officer in-charge. positioning of manpower would be decided by bpcl officer in-charge. typically, this service would require deployment of estimated two man-powers in each shift, i.e., total of estimated four man-powers in a day. 2. purging of new, dpt and hr cylinders and segregation of hr /cr /eis /ts /rejected/ and sloc wise stacking of dpt /hr /cr /eis /ts /rejected/omc cylinders: ensuring purging of all types of new , pressure tested and hot repaired cylinders in shift and handover to shed officer and keep record with signature of shed officers storage location wise stacking of segregated cylinders having all hr, cr, eis, ts, rejected and omc cylinders with them. stacking of these cylinders at designated position to be done as advised by officer in-charge. dented/rejected cylinders further need to be checked for depth of dent and need to be recorded before rejecting the cylinder. removal of cylinders from chain conveyor and feeding cylinders to carousal from empty cylinders floor stock, as and when required during plant operation as directed by officer in-charge. bpcl may ask the manpower to perform any other work/job during the shift as directed by officer in-charge. positioning of manpower would be decided by bpcl officer in-charge. typically, this service would require deployment of estimated two man-powers in each shift i.e., total of estimated four man-powers in a day. 3. replacement of o ring- replacement of all lpg cylinder o-ring which are rejected by o-ring leak detecting machine or cvt and circulating of test cylinder in the loop. removal, stacking and unlocking/locking of cylinders over chain conveyor & floor as and when required during plant operation as directed by officer in-charge. bpcl may ask the manpower to perform any other work/job during the shift as directed by officer in-charge. positioning of manpower would be decided by bpcl officer in-charge. typically, this service would require deployment of estimated two man-powers in each shift, i.e., total of estimated four man-powers in a day. 4. lpg cyl handl prod line sealing (seal placement) seal placement after the cylinder has been checked at test bath and before it reaches the hot air sealing machine. it has to ensure both 14.2 kg and 19 kg cylinder on the line has to have seal placed on it before it could be sealed by hot air sealing machine. it has to ensure that there should be no line jam due to cylinders stuck at the passage of sealing machine if found need to rectify immediately as per instruction of officer in charge. there should be no waste of seals and the seal box should be placed in proper manner and to maintain the good housekeeping. typically, this service would require deployment of estimated two man-powers in each shift, i.e., total of estimated four man-powers in a day. 5. shifting of defective cylinders..
Tender For tender for supply of carefully removing the veneering wall etc. , after proper documentation bringing them down at a height of 2.50 mtr , stocking for reuse , erecting and removing of supports at down properly etc. , complete. , carefully removal of core filling in between stone masonry veneer wall and stacking the useful materials and conveyance of debris to a far away from the monument premises , etc.complete , excavation/scientific clearance of earth deposit to retrieve fallen architectural stone elements and to expose the buried plinth and original floor & drainage system , including stacking useful stones and disposing of the excavated earth after proper screening outside the temple complex , etc.complete. , carefully resetting the old available veneer stone and new stone in original position in lime mortar 1in2 including necessary pointing the stone joints in same mortar with suitable colour oxides , curing , as per the standard specifications and as directed etc. complete. , construction of brick work for corefilling and in the edges with country bricks specially made as per requirement in lime mortar 1in2 , curing etc. , complete. , providing apron and pathwaty using new stone flooring slabs of size 1.20m to 0.90m in length 0.60m to 0.45m in breadth and 3inch to 4inch thick properly dressing as per the old available clues setting in lime mortar 1in1.5 above the foundation concerete and pointing the stone joints with lime mortar 1in2 curing etc.complete. , supplying and making of new veneer stone with good quality of new stones properly dressing all sides and architectural designs as per the available clues in the place of damaged and missing members etc.complete. , disposal of waste and unserviceable materials outside temple premises , stacking the stone members and leveling the undulated area , etc.complete. 1.disposal of building rubbish or malba or similar unserviceable , dismantled or waste materials 100 cum 2. removal and stacking of store members 75 cum 3. for leveling the area-creation of parking space approximately size of 80m x 6m x 0.50m 240 cum