Get complete information related to latest Blasting Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Blasting Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Blasting Tenders.
Tender For supply of one set of spares consisting of 02 items suitable for airless centrifugal shot blasting machine. as per technical specification and material test certificates as attached at annexure-a. model: - asbmf-1828, make: - surface international or equivalent [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : engagement of agency for carrying out blasting and painting works on hand rail pipe and toe guard on sub contract basis in connection with crude oil import terminal project for nrl at paradip
Tender For reinforced conveyor rubber belt 10 inch width x 60 feet long x 13 to 15 mm thick for shot blasting machine cmc & pmc -1 bucket elevator. is-1981, 6 plies. note: warranty: 12months from the date of fitment or 18 months from the date of supply, which ever is earlier. [ warranty period: 18 months after the date of delivery ]
Tender For comprehensive, cleaning and up-keeping of service building like time office ,field canteen ,rest shelter ,conference hall, wash room, dg room, workshop complex, safety office, blasting office control room, project office and operation of mines cante
Tender For 1)inspection of stator coil for identification of exact no. of the faulty coil and setting up the arrangements for rotor pole coils removing and rotation as per scope of works along with supply of materials and other consumables as per scope of works2)de-brazing the rotor pole terminations and removing the rotor poles (as required). dismantling of rotor poles using suitable and compatible tools, fixtures, and lifting arrangements. ensure safe handling and proper marking for reassemble. rotate and position the rotor appropriately to access the damaged stator coil area.3)remove insulation from both ends of the affected winding section.4)de-brazing of defective coils. 5)driving out the slot wedges carefully remove wedges from stator winding slots without damaging adjacent coils or core.(entire stator winding shall be inspected in case of loose wedges, worn out wedges and missing wedges shall be replaced) along with supply of materials and other consumables.6)insulation removal- remove insulation from both ends of the affected winding sections.7)cutting the coil bindings in both sides. cut the identified damaged winding portion using appropriate tools. carefully pull out the damaged coil from the stator slots without affecting surrounding windings.8)damaged winding cutting- cut the identified damaged winding portion using appropriate tools.9)winding extraction- carefully pull out the damaged coil from the stator slots without affecting surrounding windings. while removing the faulty coils from stator, utmost care should be taken to prevent any damage to stator core.10)removal of faulty coils from the slot.11)slot cleaning and preparation-clean stator inner tooth slots thoroughly. use emery paper to smoothen and maintain uniform slot condition.12)cleaning of carbon deposits/heavy oil content from complete stator coils through co2 cleaning process /dry ice blasting.13)new coil installation-insert new stator coil with proper alignment. fix securely using new wedges of appropriate grade and size.14)brazing of the coil ends.15)re-fixing the rotor poles and connecting them.16)insulation application-apply insulation as per specified class (e.g. class f/ classh). ensure proper curing and finishing.17)complete co2 / dry ice cleaning of stator and rotor.re insertion of removed rotor poles. 18)final checks & testing- insulation resistance (ir) test, high voltage (hvdc) test, continuity check, visual inspection and any other tests which are required (will be carried out by kpcl).19)assembling of removed damper doors and stator covers.20)maintain quality standards throughout the process & use calibrated tools and approved materials.21)presence of the agency during excitation and synchronization of the unit by kpcl.22)safety & quality-follow all safety procedures and ppe requirements