Get complete information related to latest Boiler Spare Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Boiler Spare Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Boiler Spare Tenders.
Tender For tender for remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier errect 8x65 10x50 mm flat iron bars in their place clean the welded areas using a grinder , cut and remove the worn out bottom plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect new 6 8 10 mm , cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect 6 8 10 mm plates satisfactory trial run , cut out and remove the damaged and weak sections of the main bagasse carrier fabricate and errect a new assembly including the gear shaft system using the supplied plate , cut out and remove the weak and corroded sections of the bagasse feeding chutes errected boilers fabricate and replacements using the provided plates and repair the associated shafts and gears , the casings of the boiler id and fd fans have become severely weakened and damaged the task involves cutting away and removing the weakened sections fabricating , cut and remove the deteriorated side bottom and top plates surrounding the air heater of boiler no. 3 fabricate and errect new plates using the specified 6 8 mm plate in their original positions , fully strengthen the air heater plates and conduct a satisfactory trial. , dismantling the old air heater tubes of boiler no. 01 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , dismantling the old air heater tubes of boiler no. 02 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , dismantling the old air heater tubes of boiler no. 03 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , a. dismantling old columns beam channels etc. b. manufacturing and installing new columns beam channels , installing 16 inch 18 inch manholes with blinds , constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to twenty hp , dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial. , removing the old corroded platform and replacing it with a new one
Tender For boilerrefactory - boiler refractory, boiler material/boilerspare store a/c}castable refractory white heat k(bo0044)total weight 800 kg , each bag 25 kg, {boiler material/boilerspare store a/c}ceramic fiber blanket cera temp1260 c , dencity 64 kg/cm2, size 7300*610*25 mm(bo0100) (488)
Tender For supply of turbine cooling tower fan drive shaft > - turbine cooling tower fan drive shaft, boiler material/boilerspare store a/c}cooling tower coupling sds01012-drive shaft assy.4d with both end couplings dynamically balanced ( class 3) ( ss 304 ) spares / part of cooling tower(bo0101)drive shaft with coupling both end & coupling bush pin also
Tender For boiler ash handling > - boiler ash handling make- macgale pneumatics pvt.ltd, boiler material/boilerspare store a/c} o ring for spigot piece ash handling system(bo0109), {boiler material/boilerspare store a/c}300 nb assembly (w/c top plate & dome) ash handling system(bo0097)dome size 300nb, {boiler material/boilerspare store a/c}ash handling brass bush 300nb(bo0001), boiler material/boilerspare store a/c}conveying nrv 20 nb ash handling system(bo0091), boiler material/boilerspare store a/c}conveying nrv 25 nb ash handling system(bo0094), {boiler material/boilerspare store a/c}conveying nrv 50 nb for ash handling system(bo0110), {boiler material/boilerspare store a/c}dome dowell pin inner 300nb for ash handling(bo0004), {boiler material/boilerspare store a/c}dome dowell pin outer 300nb for ash handling(bo0005), boiler material/boilerspare store a/c}dome seal silicone 300nb for ash handling(bo0009)dome seal red one , boiler material/boilerspare store a/c}dome shaft seal 300nb for ash handling(bo0002), {boiler material/boilerspare store a/c}gasket set 300nb for ash handling(bo0010), boiler material/boilerspare store a/c}insert ring 300nb for ash handling(bo0007), boiler material/boilerspare store a/c}o ring set 300nb for ash handling(bo0006), {boiler material/boilerspare store a/c}repair kit for conveying nrv 20 nb ash handling system(bo0093), boiler material/boilerspare store a/c}repair kit for conveying nrv 25 nb ash handling system(bo0096), {boiler material/boilerspare store a/c}repair kit for conveying nrv 50 nb for ash handling system(bo0112), boiler material/boilerspare store a/c}seal kit for conveying nrv 20 nb ash handling system(bo0092), boiler material/boilerspare store a/c}seal kit for conveying nrv 50 nb for ash handling system(bo0111), boiler material/boilerspare store a/c}shaft seal spacer 300nb for ash handling(bo0003), boiler material/boilerspare store a/c}shaft ash handling system(bo0114)dome size 300nb, boiler material/boilerspare store a/c}spigot piece ash handling system(bo0089)
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - thermal power plant; the work of complete servicing and overhauling of regenerative air pre heater in boilers of unit 3, 4 and 5 at gtps during aoh coh of unit; service ..
Tender For providing of repair and overhauling service - providing expert support services for facilitating jobs of regular and capital maintenance of boilers, hrsgs and other capital equipment's at tps, br.