Web Analytics Made Easy - StatCounter

Boiler Heating Surface Repair Tenders

Get complete information related to latest Boiler Heating Surface Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Boiler Heating Surface Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Boiler Heating Surface Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45555987 Due date: 08 Jul, 202608 Jul, 2026 NA
Tender For high pressure jet cleaning machine working pressure: 200-250 bar water flow rate: 900-1100 liters/hour steam temperature (if applicable): 140-155 degree celsius hot water output temperature: 85-90 degree celsius suction height (from water source): minimum 0.5 m pump specifications critical for durability and pressure stability. pump type: triplex plunger pump pump speed: around 1450 rpm number of pistons: 3 piston material: ceramic minimum feed pressure: 6-8 bar motor & electrical specificationsdefines power and efficiency. power supply: electrical phase: single phase / three phase motor rating: around 7-7.5 kw protection class: ipx5 or higher automatic pressure cut-off: yes heating system (for hot water models) optional but essential for grease removal. burner type: diesel / electric burner power: 60-90 kwfuel tank capacity: around 20 liters detergent tank capacity: around 20 liters hose, gun & lance user interaction components. high-pressure hose length: 8-10 meters electrical cable length: 5 meters spray lance length: approx. 700 mm spray gun: standard high-pressure trigger gun quick-connect couplings: preferred construction & materials ensures robustness and long service life. chassis material: mild steel (industrial grade) body material: mild steel or corrosion-resistant metal wheels: solid rubber wheels frame design: compact, vibration-resistant safety & protection features mandatory for industrial equipment. thermal motor protection pressure relief valve overload protection weather-proof switches low-water cut-off (recommended) dimensions & weight affects portability and storage. weight (without accessories): 140?150 kg mobility: trolley-mounted with heavy-duty wheels accessories (standard supply) high-pressure hose spray gunspray lance nozzle set detergent suction hose operating conditions operating temperature range: 0 degree celsius to 40 degree celsius environment: dusty, humid, industrial conditions [ warranty period: 30 months after the date of delivery ] ]

corporations/Associations/Others

CTN :44348671 Due date: 02 Jul, 202602 Jul, 2026 NA
Tender For corrigendum : tangedco nctps i 3x210mw installation of semi dry flue gas desulphurization system - tangedco – nctps-i–(3x210mw) – installation of semi dry flue gas desulphurization system complete design, engineering, manufacture / supply, inspection and testing at supplier’s works, packing, forwarding to site, transportation, unloading, storage, preservation, insurance, handling at site, pre-assembly, assembly, erection / supervision of erection, final painting, start-up, pre-commissioning, testing & trial run, commissioning, performance guarantee testing and warranty of fgd system up to completion of warranty period, training of purchaser’s personnel for complete fgd equipment / system covering all mechanical, electrical, c&i, associated steel structure, civil & architectural works for semi dry flue gas desulphurization system in all units of3 x 210 mw steam generators with complete associated auxiliaries, accessories and other related items of respective work for the complete fgd plant and equipment on turnkey engineering, procurement and construction basis, necessary for putting into operation, a highly reliable, safe, efficient and environmentally compliant fgd plant in order to reduce the sox emission to comply the new environmental norms in 3x210mw units of nctps i, athipattu, tiruvallur dist., tamil naduunder single epc basis.

Central Government/Public Sector

CTN :45345771 Due date: 18 Jun, 202618 Jun, 2026 NA
Tender For corrigendum : procurement of spares for ms sepl make analysers for ntpc vstps - plc+hmi (combo),sepl,dgrplc+hmi, 3-wayballv/v,grb-sa-vlv,steam equipments, degas chamber,mqp875sepl+,sepl, heater control relay,se-hetr-ssr,sepl, dualchtsmtr,sepl,conductivity tran, sample heater system,sepl, sensor,degas conductivity analyz,sepl, samp iso vv,mkt-swaslt,sepl, temp sensor,conductivity analyz,sepl, flow sensor,degas cat conductivity,sepl, rotameter,gls tube indctr,0-29lph,st-5, vv: samp isol vlv-ht,ss316,280bar,3/8in, vv: sample iso lt,ss316,7bar,1/4in, sampl isoln valve,sepl,analyzer, cation column degas system,sepl,se-cc-14

Central Government/Public Sector

CTN :45420794 Due date: 19 Jun, 202619 Jun, 2026 NA
Tender For corrigendum : supply of steam water analysis system main spares and e and c c c - ph sensor , ph transmitter 4 to 20ma hart , specific conductivity sensor , specific conductivity transmitter 4 to 20ma hart , cat ion conductivity sensor with 1 cat ion exchange column , cat ion conductivity transmitter 4 to 20ma hart , do2 sensor , do2 transmitter 4 to 20ma hart , silica analyzer transmitter 4 to 20ma multi channel , sodium analyzer transmitter 4 to 20ma multi channel , conductivity analyzer -online retractable type , sample handling system for main steam superheated , sample handling system for main steam saturated , sample handling system for drum water , sample handling system for hp feed water economizer inlet , sample handling system for deae ol fw , sample handling system for condensate cep outlet inlet cooling wtr , sample handling system for dm water , redundant chiller units 1 working 1 standby , shelf life items required at the time of commissioning , shelf life items required after commissioning in 1st lot , shelf life items required after commissioning in 2nd lot , training as per cl 14 of 6 mandays at manufacture works and 6 mandays at site , mandatory spares as per tech specs , supervision of e and c services charges at site , supervision of e and c visit charges

corporations/Associations/Others

CTN :45264973 Due date: 20 Jun, 202620 Jun, 2026 NA
Tender For corrigendum : providing of repair and overhauling service - maintenance works of steam and water analysis system, silica analysers of dm plant and conveyor belt weighing system of lhs in tps-ii; thermal power plant; no; buyer premises

State Government

CTN :45277339 Due date: 24 Jun, 202624 Jun, 2026 NA
Tender For corrigendum : pressure switches for furnace,pa header,seal air,hfo,lfo,atomizing steam and air and mill lube oil system and temperature switches for reducer lube oil system of mills.

Central Government/Public Sector

CTN :45197683 Due date: 20 Jun, 202620 Jun, 2026 NA
Tender For corrigendum : supply of steam water analysis system main spares and e and c - ph sensor , ph transmitter 4 to 20ma hart , specific conductivity sensor , specific conductivity transmitter 4 to 20ma hart , cat ion conductivity sensor with 1 cat ion exchange column , cat ion conductivity transmitter 4 to 20ma hart , do2 sensor , do2 transmitter 4 to 20ma hart material code , silica analyzer transmitter 4 to 20ma multi channel , sodium analyzer transmitter 4 to 20ma multi channel , hc analyzer 4 to 20ma , sample handling system for main steam superheated , sample handling system for drum water , sample handling system for hp feed water economizer inlet , sample handling system for deae ol fw , sample handling system for dm water , sample handling system for condensate blow down line , sample coolers , redundant chiller units 1 working 1 standby , shelf life items required at the time of commissioning , shelf life items required after commissioning in 1st lot , shelf life items required after commissioning in 2nd lot , training as per cl 14 of 2 mandays for 6 nos at site , supervision of e and c services charges at site , supervision of e and c visit charges , mandatory spares as per tech specs

Central Government/Public Sector

CTN :45236878 Due date: 16 Jun, 202616 Jun, 2026 NA
Tender For corrigendum : supply installation commissioning and testing of hydrogen manifoldheader of hydrogen cooling system of steam turbine generator

CTN :44483152 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For bid to ras supply of galley equipments for newly inducted 1370 dsc platoon at nsry svp : : - automated tuberosum exfoliation apparatus , motorized titable aqueous pulverization apparatus , electro mechanical dought amalgamation apparatus , high torque commercial pulverization mixer , automated vegetative segmentation apparatus , gaseous combustion based flatbread thermal processing apparatus , gas driven high capacity live steam idli fabrication apparatus , industrial heavy duty continuous conveyor , industrial heavy duty triple burner gas fueled culinary range , industrial heavy duty single burner gas culinary range , thermo regulated cryogenic preservation system , transparent facade thermo regulated preservation module , gastronomic heat management station , culinary fume extraction system , industrial grade culinary storage apparatus , industrial grade foodstuff shelving apparatus

CTN :45516505 Due date: 26 Jun, 202626 Jun, 2026 1.00 Lacs
Tender For tender for repairing and calibration of temperature indicators installed on boiler , work of repairing, calibration and rewiring of superheated wash water temperature control system , laying of comprehensive cable, installation of thermocouple and commissioning of indicators at the boiler station , work of repairing, rewiring, overhauling and commissioning of d- superheating system of exhaust line , repairing and commissioning work of temperature indicators of sulfur furnace , laying of compressive cables of sulfur furnace, installation of sensors and commissioning of temperature indicators , to carry out installation and commissioning work for raw-sulfated juice, clear juice, exhaust steam and injection water inlet temperature , over hauling, rewiring and recommissioning of auto drum water level control system of boilers , rewiring and recommissioning of high or low alarm system on boilers for water level , overhauling, rewiring and recommissioning of boiler steam generation system , overhauling, rewiring and recommissioning of boiler feed water measurement system
 Loading, Please wait...

Connect us via What's Up