Get complete information related to latest Boiler House Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Boiler House Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Boiler House Tenders.
Tender For procurement of boiler ss sacrificial shields, boiler fins and allied spares for u#3 coh at cstps, chandrapur. - locking clit for staright shield, ss shileding 90 deg for supply tube dia, ss shilding for sh screen tube dia 44.5, ss shielding 76.1 x 3.5 x 1000 l with 2, blr ww 0 0 clit for 90 deg ss shield, blr tbatta 0 0 51 mm for shield, 44.5 mm dia x 3 mm thick s- bend, blr tbatta 0 0 ltsh coil, motor pinion t-30, blr ww 0 0 flat for fin 6x12 m.s, blr sbww 0 0 stud with two nuts, flat ms rectangular 80 x 6 mm, ww trapezoidal bar 30x10x20 in 200 mm l, wear bar moc sa 210 gra1 12x12 mm, tube slotted fin 200 x 20 x 6 mm
Tender For supply of fins, scallop bar, ms/ss flats, boiler attachments, soot blower sleeve, chicken wire mesh, corrugated sheets and allied spares for boiler during aoh at unit 8 , cstps chandrapur. - , boiler tube fin size 12.5 x 6 th, ms ww tube fin 10 x 10 th, heating element / sector system ms flats, flat ss 304 rectangular 50 x 6 mm, ss round rod locking of cassette baffle, ms ww clit for ww "z" panels, ww trapezoidal bar 30x10x20 in 200 mm l, ww scallop bar for furnace seal trough, blr sbww 0 0 slev for wall dislager, burner tilt lever round pin, bar brass round dia 90 mm bar brass round dia 125 mm, hardwr mesh wire ss 1m wide, cladding metal gi corugated sheet 18 swg
Tender For providing of facility management services - lumpsum based - fabrication eraction work related to economizer tubes ( fins type) of texmeko make boiler for season 2026-27; as per tender documents; consumables to be provided by buyer
Tender For corrigendum : supply and drained bed material/clinker handling in boilers. - loading of seived bed material in boiler from operating floor, spreading and leveling as per the direction of eic. the contractor has to arrange man power, if required during odd hours & sundays/ holidays, if required on emergency. frequency: as and when required., transportation of seived bed material , available in polythene bags, from ground floor to operating floor and coal scale area of boilerhouse and stacking it as per the direction of eic. frequency: as & when required., transportation of drained bed material, when boiler is in operation and drained clinker from boiler area to designated sieving area as per direction of eic. frequency: as and when required., collecting the bed material in polythene bags from areas wherever necessary for inspection of bed coils, wall tubes or for any other maintenance purpose and keeping the bed material either inside or outside of boiler bed, as per the direction of the eic. frequency: as and when required., removal of clinker from boiler 1 bed, using suitable methods without causing any damage to the bed coils/side wall tubes and transporting the removed clinker from the boiler to a specified area within 30 meters from ground floor of boilerhouse. after removal of clinkers, entire bed material and cleaning of nozzle distribution plates , all fluidization nozzles needs to be flushed out with compressed air and all nozzles needs to be pinned. frequency: as & when required., removal of clinker and bed material inside furnace (cross section 6.5m*6m) by engaging suitable manpower. location of clinker and bed material is between bed coils and fluidization nozzles. manpower engaged has to lie down between fluidization nozzles and bed coils and manually pass on clinker pieces to manholes available to be taken out. bed material can be drained through bed drains. since job to be executed is in constrained area, manpower engaged has to be physically fit. after removal of clinkers, entire bed material and cleaning of nozzle distribution plates, all fluidization nozzles of 4 compartments/ wind box needs to be flushed out with compressed air and all nozzles need to be pinned (pb# 2). frequency : as and when required.
Tender For corrigendum : demolition of rcc elevated water tank near bldg. no. 435 and demolition of old boiler chimney at boilerhouse near l3 section inside factory at afk.