Get complete information related to latest Boiler Pump Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Boiler Pump Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Boiler Pump Tenders.
Tender For construction of permanent shed over boilerpump motors and other electrical appliances installed in 200 tpd formalin project at boitamari bongaigaon
Tender For supply, installation, testing & commissioning of 700 kw, 989 rpm, 6.6 kv ht 3-phase induction motor compatible to existing base frame of wilo make hscf pump installation with suitable coupling & other required accessories including insurance, transportation, loading, unloading, inspection charges etc. complete for nc-6, khirai pumping station, tal-maliya, dist-morbi
Tender For supply, installation, testing & commissioning of hscf pump-sets along with all electro-mechanical accessories including construction of positive suction pumphouse at ravapar shw site, taluka : lakhpat for lakhpat rwss in kutch district
Tender For supply of spare parts of kirloskar make hscf pump, model dsm-100/36. one set consisting of (i) impeller driving end (cast iron)-01 no. (ii)impeller non driving end (cast iron)-01 no. (iii) shaft (c 40) stainless steel with 02 nos. suitable size of shaft key -01 no. (iv) wear ring (cast iron)-02 nos. (v) inter stage ring (cast iron)-01 no. (vi) bearing cartridge driving end (cast iron)-01 no. (vii) bearing cartridge non driving end (cast iron)-01 no. (viii) bearing cover driving end (cast iron)-01 no. (ix) bearing cover non driving end (cast iron)-01 no. (x) sleeve (cast iron)-02 nos. (xi) sleeve check nut (lt bronze)-04 nos. (xii) bearing check nut (cast iron)-01 no. make- kirloskar & model dsm-100/36. [ warranty period: 30 months after the date of delivery ]]
Tender For supply. installation, testing and commissioning of 75 hp hscf pump motor set having capacity of 50000 gph/ 227 rn3/hr with 50 mtrs. head as per attached annexure -a, with control panel consist of suitable so ft starter including spares and accessories following all the clauses as mentioned in pcee/ser's specification no.- cee/s/185/hscf pump/ 9/98/revised july 2022 (copy attached) cost includes all the allied ancillary civil and electrical works for foundation and successful completion of electrical installation, commissioning & testing. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of pump shaft of material carbon steel (part no-180) for 100000 gph hscf pump(kirloskar) , model no-dsm 150/46 [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of squirrel cage induction motor,power rating: 30 hp (22 kw), poles: 4 pole, speed: -1440?1500 rpm at 50 hz, voltage: 415 v ?10%, frequency: 50 hz, phase: 3 phase, duty: continuous (s1 duty), efficiency class: minimum ie3 or above as per 60034-30-1:2014, & is-12615:2018, enclosure: tefc (totally enclosed fan cooled), mounting: foot mounted (b3) / as required, insulation class/thermal calss: f/b, protection: ip65 or better, frame: km180l, product code:km2.22t0.bmc.b03.tss with tyre coupling pulley set & base frame for pump horizontal split case bare pump model- 5wlr12a of capacity 60,000 gph (227,000 lph),delivery head: 22 mtr, suction size is 150mm i.e. 6 inch & delivery size is 125 mm i.e. 5 inch, eff-83%, bkw- 16.55 kw of make kirloskar or equivalent as per cege spec : cee/s/185/hscf pump/9/98/rev july 2022. [ warranty period: 30 months after the date of delivery ]
Tender For supply, installation, testing & commissioning of hscf pump-sets along with all electro-mechanicalaccessories including construction of positive suction pump house at ravapar shw site, taluka :lakhpat for lakhpat rwss in kutch district
Tender For supply, erection, testing and commissioning of 227 m3/ hr. 50000 gph (uk) capacity hscf pump set, total head 50 mtr, with 75hp motor 4p/tefc/ie3 horizontal foot mounted type with rating 415v, 50hz, 3 phase along with soft starter panel (with copper bus bar), pump set specifications shall conform to pcee/grc's latest specification and as per annexure a (item 1 to 8). the cost is inclusive of dismantling, making concrete foundation work, supply of suitable size foundation bolts and all requisite materials. spares &accessories of pump set to be supplied with each set as per clause no. 3 & 4 of pcee/grc%u2019s specification no. cee/s/185/hscf pump/9/98/revised july 2022. [ warranty period: 30 months after the date of delivery ] ]