Get complete information related to latest Boulder Pitching Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Boulder Pitching Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Boulder Pitching Tenders.
Tender For capital repair repair and overhauling of various finishing area equipment in mmsm-, repair works/replacement of protective doors., repair work of chain beam., repair works/replacement of cross feed conveyor beam, overhauling jobs/re-visioning foundation repair of fixed rollers., turning device bracket replacement., dismantling of tanks,man hole covers, pipe and flanges required manual cleaning of all sludge from the tank, filters changing gasket and seals changing for 5/2 hydraulics, piling table cylinders and racks re-visioning, retractable stopper complete re-visioning., scale pump house suction strainer cleaning, pipe clamps tightening of all the hydraulic systems and replacement wherever necessary upto 22 mm-1000nos,25 mm to 50 mm-1000 nos, above 50 mm-500 nos., complete hose changing for the mobile saw including repair/replacement of power chain, replacement of o rings on finishing hydraulic station size 200-300., clamping unit support rail alignment and strengthening (all mobile saws), all top clamping beam brackets revisioning and pins changing., re-welding of the pipe line joints in piling area approx.500 nos.of various sizes., all saws lift/lower cylinder., re-visioning, brackets repair replacement., revisioning/replacement of traveling wheels of mobile saws., removal of all the fixed rollers of lhs.saw area foundation repair, tools replacement, rollers replacement, fixing and alignment., overhauling of feeder mechanism., vertical conveyor buffer pads changing in piling/bundling section, vertical conveyor idle sprocket bearing replacement., repair of piling collecting grids., revisioning/overhauling of brakes in finishing area., clamping of all the coolers and tank cleaning of tying machines & hydraulic systems, foundation rectification of ccd., fixing of valves in hydraulic racks,, revisioning of fixed stopper., overhauling of hydraulic racks, ccd-1 & 3 shaft changing., piling platform rectification., saw area traversible stopper overhauling., fixing of hearing block stoppers on ccd beam., revisioning of limiting lever assembly., replacement of turning device magnet, rotory unit shaft changing, ccd-5 fulcrum near rotory unit replacement,
Tender For custom bid for services -nesting, packeting, bundling and unitization of merchant mill products in merchant mill of bhilai steel plant-1 2008120152 steel straps - 0.79 thickness, specification for bundling, bundle unitization & wagon unitization as per scope of work, 2 4000014138 steel straps -1.27 thickness, specification for bundling, bundle unitization & wagon unitization as per scope of work, 3 2008120151 seal to lock tensioned 0.79 thickness straps during bundling, bundle unitization & wagon unitization as per scope of work, 4 4000014137 seal to lock tensioned 1.27 thickness straps during bundling, bundle unitization & wagon unitization as per scope of work, 5 4000014131 aluminium tag as per drw:mm-opr-4442, 6 4000014132 bundling to be done of merchant products as per scope of work confirming to indian railway guidelines, 7 4000014136 wagon unitization to be done as per scope of work conforming to indian railway guidelines (1 ea = one wagon), 8 4004020736 merchant products after being finished are being loaded by merchant mill as per the loading program movement plan given by marketing, cmo, shipping. this loading has to be done in minimum time to avoid any sort of demurrage/delays due to vehicles being held up. indian railways and rto s have stringent loading requirements vis- -vis the load balance on the transport vehicle(wagons, truck, trailor etc) which are to be complied with., 9 4004020764 cutting of merchant products in required length, blade changing, crop end bucket removal and first bay metal(arising less than 5.5mtr.) removal from both side of cold shear along with house keeping at both cold shear area of merchant mill., 10 5001070002 gas cutting of cobbles arising during production at both side of cooling bed, rope transfer, shear & craddels along with housekeeping in finishing area of merchant mill., 11 4001361133 payment on account of escalation of rates, as per the terms and conditions of the purchase order /tender..
Tender For supply of enamel, synthetic, exterior (a) under coating (b) finishing paint (v3) confirming to is 2932 (q3) , gum spirit of turpentine oil as per is 533 (q3)