Get complete information related to latest Box Assembly Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Box Assembly Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Box Assembly Tenders.
Tender For supply of axle boxassembly complete with bearing (plain end cover) to nei's drawing no.- x 171 or m/s fag's drawing no.- 901-20-101/a2 or latest for wag-7 locos. [ warranty period: 30 months a fter the date of delivery ]
Tender For power supply junction boxassembly (psjb) to kbil part no.787090 for ccb-ii version system of hhp diesel locomotives. [ warranty period: 30 months after the date of delivery ]
Tender For supply of rana flp coal drill machine spares - drill chuck 8gh , circlip for gear box 7gh , oil seal for gear box 6gh , gear case 1hg gear box body 1gh , internal gear with shaft 50 teeth 2gh , plug socket assy flp 56c , disc insulator 56c2aa , circlip for dc connector circlip 44mm 56c7 , circlip 54mm dia 56c8 , plug and socket 56c2 , housing for plug and socket insulator 56c1 , set of screw for plug and socket 56c6 , rotor pinion 10t 10gh 10gh , rotor shaft 10 teeth 20mh , end cover for rana drill 26mh , bearing cover 29m , circlip for bearing cover 30mh , fan 22mh , key for fan 24mh , nut for shaft fan side 23m , fan cover 48mh , handle left side 36mh 36mh , fibre packing handle upper 45ma , fiber packing handle lower 45mb , handle for pilot switch 39mh , pilot switch assy 47mp , operating lever 40mh , bolt for fan cover 28m , ln screw for pilot handle 37m , screw for left handle 43m , ln screw for operation lever 41m , hinge screw for adjusting lever 42m , diode with bush 47mp1 , head body drill 32 mh 32mh , rotor with shaft 21mh , stator 31mh , gear boxassembly 12gh
Tender For job basis work shop work tender-, 01. removing old engine/gear from vehicles and installing rc engine/gear., , 02. replacing clutch plate, pressure plate and spring (both front and rear)., , 03. rotate tyres timely, remove punctures and maintain air pressure., , 04. to carry out 40,000 km of docking work., , 05. replacing fuel injector pump and injector., , 06. engine tune up to improve diesel average., , 07. replace crown-cage assembly/water pump/radiator assembly., , 08. remove power steering pump including boxassembly., , 09. engine repairing work such as replacing head-gasket, tappet-lever, ring, piston and liner., , 10. replace engine main oil seal and steering oil seal.
Tender For custom bid for services - 30 mw & 14 mw tg miscellaneous works at nspcl-bhilai power plant-2- 10.10 tmstu61bd000 steam tur(bearing pedestal)attend defect: 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. clean front pedestal housing., 5. take measurement as per instruction of eic. (involves checking of pinion shaft/gear, assembly, main oil pump gear wheel, gov. assembly & checking the backlash of gears.), 6. attend the defect/trouble shoot the problem in front pedestal as per instruction of eic., this includes the following work beside defect attending as per instruction of eic., 7. dismantle pinion shaft and record the alignment w.r.t to the gov. assembly., a) dismantle mop (main oil pump) bearings and gear., b) do servicing of mop and replace damaged items., c) dismantle governor assembly (consists of gop-governing oil pump and other, elements)., d) do servicing of gop and replace damaged items., e) assemble mop and governor assembly., f) put governor assembly in position., g) do alignment of the pinion shaft w.r.t to governor assembly., h) put electronic over speed shaft (pinion shaft) in position., i) put mop assembly in position., j) record backlash of gears and if requires, do adjustment., 8. measure the clearances of first three rows of oil gland fins & its servicing, 9. assembly of oil gland segments (new or old) and setting of clearances., 10. after the work, box up front pedestal top cover., 11. link control valve linkages, oil piping etc., 12. do rig test for setting governing characteristics., 10.20 tmstu56oh000 steam tur (bearings) serv- 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. check bearing interference, toc, soc etc., 5. remove turbine front bearing top & bottom halves., 6. do the dpt and ut of turbine bearing., 7. check thrust bearing pads and do dpt, ut and blue matching., 8. check toc, soc, bearing interference of bearing after servicing., 10.30 tmstu01bd794 steam tur (<=30mw#) repl-gland- 1. removal of first 2 rows of hp front steam gland segments., 2. servicing of (new or old) gland segments and springs., 3. measurement of dimensions and machining of gland segments if required., 10.40 tmtgs01bd701 turbine gov. sys (<=30mw#) maintenance- i) attending passing defect in four nos. steam control valves, ii) servicing of two nos. hydraulic servomotors (including relay gear) of control valves, iii) inspection & servicing of speed governor and setting its governor characteristics (rig test)., iv) inspection & servicing of cies valve (left & right)., 1. ensure ptw from concerned person., 2. breaking of insulation around steam control valves & removal of debris from site., 3. dismantle linkages and decouple all four nos. control valves from spring boxassembly, 4. remove spring boxassembly from position., 5. dismantle bonnet bolts & remove all four control valves., 6. check blue contact / kerosene test of plug with respective seats., 7. do lapping of all control valves, replace plug/other components, if required., 8. assemble all control valves and tighten bonnet bolts., 9. servicing of cies valves (left & right), 10.servicing of spring boxassembly hinges & pins etc., 11.place spring boxassembly & couple all control vales with spring box., 12. servicing of two nos. hydraulic servomotors of control valves., 13. servicing of primary relay oil cylinder for checking for excessive draining of oil. replacement of relay gear power, piston if needed., 14. servicing of secondary relay., 15. servicing of linkage., 16. replacement of steam leak-off and impulse line pipes as per eic instruction. dp test of welding joints are to be, carried out., 17. inspection of speed governor, assessment of its component s healthiness, repl