Web Analytics Made Easy - StatCounter

Brake Head Tenders

Get complete information related to latest Brake Head Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Brake Head Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Brake Head Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43405286 Due date: 27 Jan, 202627 Jan, 2026 NA
Tender For supply of hex. head bolt complete for brake head assembly.

Central Government/Public Sector

CTN :43276938 Due date: 29 Jan, 202629 Jan, 2026 NA
Tender For corrigendum : supply of bush for brake head mc

Central Government/Public Sector

CTN :43404620 Due date: 07 Jan, 202607 Jan, 2026 NA
Tender For supply of brake head for escorts design bmbs

Central Government/Public Sector

CTN :43403809 Due date: 29 Jan, 202629 Jan, 2026 NA
Tender For supply of pin assembly brake head to emd pt.no.40023259 dlw pt. no. 17020542

Central Government/Public Sector

CTN :43403811 Due date: 29 Jan, 202629 Jan, 2026 NA
Tender For supply of pin assembly brake head

Central Government / Public Sector

CTN :43404960 Due date: 13 Jan, 202613 Jan, 2026 NA
Tender For supply of set of pins for brake hanger of wap4 locos each set consists of 8 items. 1) pin for brake head hanger lever. clw drg.. no. 03/4/19/76 qty. 04 nos. 2) pin for air brake cylinder lever, clw drg. no. 03/4/19/77 qty.12 nos. 3) pin for brake cylinder push rod, clw drg. no. 03/4/19/78 qty. 12 nos. 4) pin for brake head hanger clw drg. no. 03/4/19/75 qty. 24 nos. 5) pin for end brake hanger lever, clw drg. no. 03/1/19/36 ref. no. 77 qty. 08 nos. 6) pin for clevis clw drg. no. 03/1/19/36 ref.78 qty. 24 nos. 7) pin for brake hanger lever clw drg. no. 03/1/19/36 ref.69 qty. 12 nos. 8) pin for brake hanger lever. clw drg. no. 03/1/19/36 ref. 37 qty. 12 nos. as per drg.no. clw drg.. no. 03/4/19/76 qty. 04 nos. specn: xxxx

CTN :43196037 Due date: 04 Feb, 202604 Feb, 2026 NA
Tender For corrigendum : supply of pin for brake head hanger

Central Government/Public Sector

CTN :43367550 Due date: 06 Jan, 202606 Jan, 2026 NA
Tender For supply of brake head for bmbs suitable

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
 Loading, Please wait...

Connect us via What's Up