Get complete information related to latest Brake Lining Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Brake Lining Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Brake Lining Tenders.
Tender For supply of king pin, king pin repair kits & parts, engine valves, valve guides, valve seat inserts & valve springs, ball & roller bearings, brake & brake palts and brake carrier, air filter, oil filter and diesel/fuel filter elements and parts, clutch & clutch parts, malleable, sheet metal, s g iron, foundry based components & plastic (pp) fan assembly, passenger bus seat & driver seat assy., collision warning system, electric horns, garage equipment, metal conditioner (friction modifier for gear oil, engine oil & hydraulic oil), m s angles(distributors manufacturer), retro fitment & operation of existing diesel/cng buses with e-drive train kit with iwithout traction battery.
Tender For auction sale of used waste grease with barrels of 182 kg. capacity,scrapped battery cable with terminals,scrapped spring steel including below 1 feet bits with or without c clamps,scrapped m s stall with shutter khoka box,scrapped lot consisting of 3 types trp materials.,scrapped filters,scrapped lot consisting of 3 types push back seats.,scrapped brakelinings,scrapped auto countable items consisting of 7 types.,scrapped auto electrical items consisting of 19 different types,scrapped auto countable items consisting 4 types.,scrapped radial tubeless tyre size 235-75/r17.5 lot-r,scrapped radial tyres size 1000x20 lot-s,scrapped empty barrels consisting of 2 nos.,scrapped assy of service parts,scrapped plastic in deteriorated condition including poly paper.,scrapped auto countable items consisting of 11 types.,ms scrap with or without aluminium attachment (including seat frames)
Tender For supply of spare parts in respect of swaraj mazda - lp6623570 element pre gasket for swaraj mazda , lp5513325 secondry filter element for swaraj mazda , lp5513328 primary element for swaraj mazda , lp701480l combi oil filter bsvi for swaraj mazda , lp7013850 crs fuel filter for swaraj mazda , lp7013852 exch filter insert bosch for swaraj mazda , lp0434010c front spring assy front rh for swaraj mazda , lp0434020c front spring assy frontlh for swaraj mazda , lpx428010c rear spring assy for swaraj mazda , lps2928310a front suspenssion bush kit for swaraj mazda , lps2928310 rear suspenssion bush kit for swaraj mazda , w02334700a damper front for swaraj mazda , w02328700a dumper set rear for swaraj mazda , lp0125060 joint set universal for swaraj mazda , w00225321 rubber for swaraj mazda , w05541990a cyl clutch master for swaraj mazda , lz0274890 brakelining front with rivit for swaraj mazda , lz0274870 brakelining rear with rivit for swaraj mazda , lps2933080 king pin kit for swaraj mazda
Tender For corrigendum : supply of brake system for cmrl project - pneumatics air supply and brake system equipment for dm car , pneumatics air supply and brake system equipment for tcar , nonrecurring activities design and submission of design documents , fai reports and type test & report , deliverables as per erts clause 12.7.6 , sil certifications and certificate submission as per erts clause 12.19 , printed circuit boards pcb details asper erts 19 55 , microprocessor details as per erts19.57 , spares as per annexure a , tools required for cmc period , training on o and m to the cmrl/beml on brake system , training manual system technical manuals software manuals operation manuals maintenance manuals fault diagnostic manuals and spares part catalogue
Tender For supply of intermediate piece ( sandwitch piece) with isolating cock for c3w dv for wagon as per greysham drg. no.-g/c3w/78868308, ftrtil part no 602001300, sab wabco part no 780269900. uvam item ref. : 3100410--graduated release compressed air brake equipment for freight stock (wagon set ) , sub item : 3100410001. [ warranty period: 30 months after the date of delivery ]
Tender For repair and overhauling service - ground equipment;ground equipment; no; buyer premises-scope of work for servicing of ground equipment- regular servicing and preventing maintenance of ground equipment is essential to ensure the safety, efficiency, and reliablility of ground operations. gsse plays a critical role in supporting aircraft turnaround, maintenance, and logistics function. over time, continous use of equipment such as ladders, hydraulic rigs, trolleys, towing arms, and refilling systems can lead to mechanical wear, fluid degradadation, and unnoticed structural fatigue. faulty or poorly maintained gse poses a direct risk to personnel, aircraft, and ground assets. servicing ensures that all mechanical, hydraulic and structural components function safely and as intended. scope of work: 1. ladder frame to be inspected and weld joints for cracks for deformation and it is to be repaired. 2. anti-slip steps, handrails and safety locks to be inspected and to be rectified/changed. 3. caster wheels are to be checked for wear, lock function and lubrication and all the faulty parts are to be repaired/changed as per condition of the(f) equipment. 4. brake function and tow hitch mechanism is to be checked and to be repaired/changed as per condition of the equipment. 5. rust to be removed where required. 6. hoses and fittings are to be inspected for leaks and damages and thoses are to be repaired. 7. filters are to be changed if required. 8. cylinders are to be checked for cracks and are to be repaired. 9. structural integrity of frame and platform is to be checked and repaired as per requirement. 10. wheels are to be checked for alignment or any other bearing issues anfd same is to be repaired. 11. parking brake is to be checked along with the towbar assembly and is to be repaired as per requirement. 12. load securing hooks or rails are to be checked and to be made operational. 13. reservoir is to be checked for contamination and fuel level 14. hand/foot operations is to be checked and made serviceable. 15. dispensing hose nozzles and fittings are to be checked and are to be made serviceable. 16. straightness and structural integrity of bar is to be checked and same is to be rectified if required. 17. all the moving parts are to be lubricated with correct grade of lubes/greases. 18. conduct ndt if required for stress crack detection. 19. cleaning of equipment is to be done before and after servicing. 20. service status and next due date is to be tagged. 21. summary report is to be given to the user after repair of all the repairing work done. 22. adhere to oem servicing guidelines and intervals. 23. use of oem grade consumables and spare parts.