Get complete information related to latest Brake System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Brake System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Brake System Tenders.
Tender For supply,installation,commissioning & testing of stainless steel tubes and double ferrule fittings for lhb non-ac hot buffet car coaches. note:-installation charges are to be given/quoted separately., as per drawing: material schedule as per fur/air brake set list no. rcf/md/mat schedule/ hot buffet coach, ver-02 dated 30/4/26 and bogie set list no rcf/mpbg/mat sch/lwaccn/lwaccw/ lvph/lwfac/lwsczac/lwfczac/lwcsz/ lgs/lscn/lwcbac ver-01 dated 5/5/26. note: seperate packing marked as fur/air brake or bogie., packing instruction: as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transitdamage , if any , shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of safety wire rope for body-bogie connection, as per drawing: medha drg. no. b-a675uv2-138988,, packing instruction: as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of aluminium components for acp roof ceiling arrgt. for lhb slr amrit bharat 3.0 coaches. intrior colour scheme as per design l. no. md48161 dated 15.05.2026., as per drawing: mplalclslrdab version 0, packing instruction: pi042 ver 3.0 (1) drawing no. icf/j&t/misc-2487 alt. `b? to be followed. (2) it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage, if any, shall be at the cost of supplier. for underframes: both (1) & (2) to be followed as stated above. for other items except underframes: only (2) need to followed. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of door cut out for hs spart tool van-1 coaches., as per drawing: mp25dctvhs version 0, packing instruction: (1) the transportation arrangement should be as perdrawing no icf/j&t/sk-1845 alt. `nil?. (2) a list should be pasted showing purchase orderno., pl no., description of item, drg. no./spec. no. , order quantity, firm's name, address and date of despatch. etc. (3) transit damage (if any) shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of handle assembly, as per drawing: icf/sk3-6-4-032 alt a, packing instruction: as perstandard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of set of terminals for shovan chair car coaches for bangladesh railways., as per drawing: edml263,rev-0,, packing instruction: as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of closing cover near elect. ewp panel for memu/tc 3phase medha coaches, as per drawing: memu/tc6-4-2-002 alt a, packing instruction: no.pi042 ver1.0 as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of ss items for ac 3t amrit bharat coaches., as per drawing: mplss3tab version 0, packing instruction: pi042 ver 3.0 (1) drawing no. icf/j&t/misc-2487 alt. `b? to be followed. (2) it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage, if any, shall be at the cost of supplier. for under frames: both (1) & (2) to be followed as stated above. for other items except under frames: only (2) need to followed. [ warranty period: 30 months afterthe date of delivery ] ]
Tender For supply of pg thread plug screw, pg -29, as per drawing: rdso/pe/spec/ac/0138-2009, rev-'1' (annex-a), tab-a18, s.no.6, packing instruction: as per standard packing. it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage , if any , shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of flexible flame-retardant, high performance,polyolefin heat srinkable tubing, as per drawing: edml176, rev. '0', packing instruction: pi042 ver 3.0 (1) drawing no. icf/j&t/misc-2487 alt. `b? to be followed. (2) it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage, if any, shall be at the cost of supplier. for underframes: both (1) & (2) to be followed as stated above. for other items except underframes: only (2) need to followed. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]