Get complete information related to latest Brewery Plant Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Brewery Plant Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Brewery Plant Tenders.
Tender For supply of flowmore pump spares - impeller part no fm590bd 17042951 20 23 , combined diffuser part no fm590bd 17042951 20 17 , oil ring de nde part no fm590bd 17042951 20 03 , oil cap part no fm590bd 17042951 20 04 , split gland part no fm590bd 17042951 20 07 , packing pcs part no fm590bd 17042951 20 08 , o ring part no fm590bd 17042951 20 15 , imp key part no fm590bd 17042951 20 35 , impeller key en9 part no fm590bd 17042951 20 18 , balance valve part no fm590bd 17042951 20 33 , neck bush bronze part no fm590bd 17042951 20 21 , wearing ring casing part no fm590bd 17042951 20 12 , bearing bush part no fm590bd 17042951 20 44 , seating and bush part no fm590bd 17042951 20 31
Tender For supply of spares for flowmore make pumps 2000 gpm - sleeve nut de, part no.fm590bd170529802059 , bearing bush deandnde, part no.fm590bd170529802044 , oil sight window assy, part no.fm590bd170529802043 , sleeve nut nde, part no.fm590bd170529802038 , shaft sleeve nde, part no.fm590bd170529802037 , balance valve, part no.fm590bd170529802033 , large steating and bush fbydelivery cover, part no.fm590bd170529802031 , delivery diffuser, part no.fm590bd170529802024 , impellar, part no.fm590bd170529802023 , neck bush, part no.fm590bd170529802021 , imp key, part no.fm590bd170529802018 , wearing ring casing, part no.fm590bd170529802012 , shaft sleeve d.e, part no.fm590bd170529802010 , water seal ring split type , part no.fm590bd17052980209 , split gland, part no.fm590bd17052980207 , oil cap, part no.fm590bd17052980204 , oil ring, d.e and n.d.e, part no.fm590bd17052980203 , pump shaft, part no.fm590bd17052980202 , combined diffuser and return vane, part no.fm590bd170529802017 , counter sunk screw, part no.fm590bd170529802032 bid number/ & ( * ) : gem/2025/b/6116177 dated/ + : 12-04-2025 bid document/ 3 3 1 / 30
Tender For supply of spares of flowmore pump 1000 gpm - pump shaft, part no.m590bd210350161002 , oil ring, part no.m590bd210350161003 , gland split, part no.m590bd210350161007 , water seal ring half, part no.m590bd210350161009 , shaft sleeve d.e., part no.m590bd210350161010 , wearing ring casing, br,5- stg, part no.m590bd210350161012 , imp key, en-8by9,5- stg, part no.m590bd210350161017 , impeller, bronze, part no.m590bd210350161018 , neck bush, br,5-stg, part no.m590bd210350161019 , large seating and bush, part no.m590bd210350161026 , imp key, en- 8by9,5-stg, part no.m590bd210350161027 , counter sunk screw, stl,5-stg, part no.m590bd210350161028 , balance valve, part no.m590bd210350161030 , balance valve cover, ci,5-stg, part no.m590bd210350161031 , shaft sleeve nde, part no.m590bd210350161032 , bearing cap and bearing body de and nde, part no.m590bd210350161041 , bearing bush de and nde, part no.m590bd210350161040 , sleeve nut de, part no.m590bd210350161043 , water slinger, rubber, 5- stg, part no.m590bd210350161049 , stay bolt m s, part no.m590bd210350161022 , delivery diffuser, part no.m590bd210350161021 , combined diffuser and return vane, part no.m590bd210350161016 , middle body, part no.m590bd210350161015 bid number/ & ( * ) : gem/2025/b/6109165 dated/ + : 12-04-2025 bid document/ 3 3 1 / 24
Tender For tender for supply of casting - seal assembly (hy-914.00) - fully m/cd and assembled seal assly as per drg. 26118802143/02 with matl as per specn. astm b-584 alloy gr. 86300 (hardness 200-220 bhn) , oil pump bushing (hy-172.0) - fully m/cd bronze casting as per drg. 26117600002/04 with matl as per specn. aa19939/02 , packing gland (hy-167.01.11) - fully m/cd bronze casting as per drg. 36148000348/02 with matl as per specn. aa19939/02 , packing gland hy 167 01 13 fully mcd bronze casting as per drg 36148000350 04 with matl as per specn aa19939 02 , packing gland (hy-182.03) -- fully m/cd item as per drg. 36157600098 rev.01 with matl. as per specn. aa19939/02 , sleeve bearing d76.37x62.5x76 l as per drg. a-644 rev.02 with material aa19913/02.
Tender For supply of material code -26616030110 -impeller part no 159 moc bronze , material code -26616030150 - gland for pump model up250 38 , material code -26616030160 - lantern ring for pump up250 38 , material code -26616030130 - bearing housing up250 38 , material code -26616212420 - mechanical seal for pump up 250 38 , material code - 26616030670 - shoulder ring for 250 38 pump , material code -26616030680 - liquid deflector for 250 38 pump , material code -26616030690 - bearing housing nde for 250 38 pump , material code - 26616030700 - keys for 250 38 pump , material code - 26616030710 - lock nut for 250 38 pump , material code -26616030720 - lock washer for 250 38 pump , material code -26616030730 - grease nipple for 250 38 pump , material code -26616030740 - vent valve for 250 38 pump , material code -26616030750 - set of oil seal for 250 38 pump , material code -26616030760 - set of gasket for 250 38 pump , material code -26616030770 - set of o ring for 250 38 pump , material code - 26616030780 - set of fasteners for 250 38 pump , material code -26616030790 - insert de for 250 38 pump , material code -26616030800 - insert nde for 250 38 pump , material code -26616030810 - set of coupling for 250 38 pump , material code -26616030820 - set of coupling for 200 48 pump , material code -26616030830 - set of coupling for 100 36 pump
Tender For supply of dirty oil pump with motor all accessories , local control panel , gauge assembly board with suction and discharge pressure gauge pipes isolation cocks etc. , loose fittings and instrumentation , shock mounts with center and side holding down fasteners , flexible pipes i bellows for all equipment interfaces with external loose supplied system , electrical items for connectorisation termination cable gland lugs etc , first submission of binding drawing as per sotr , documentation hard copy , documentation soft copy , ietm documentation , service of service engineer 20 mandays with 8 sorties , preservatives and de preservatives , commissioning spares as per sotr , onboard spares as per sotr , standard and special tools as per sotr , training and training material as per sotr , service of service engineer 15 mandays with 6 sorties
Tender For custom bid for services - 30 mw & 14 mw tg miscellaneous works at nspcl-bhilai power plant-2- 10.10 tmstu61bd000 steam tur(bearing pedestal)attend defect: 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. clean front pedestal housing., 5. take measurement as per instruction of eic. (involves checking of pinion shaft/gear, assembly, main oil pump gear wheel, gov. assembly & checking the backlash of gears.), 6. attend the defect/trouble shoot the problem in front pedestal as per instruction of eic., this includes the following work beside defect attending as per instruction of eic., 7. dismantle pinion shaft and record the alignment w.r.t to the gov. assembly., a) dismantle mop (main oil pump) bearings and gear., b) do servicing of mop and replace damaged items., c) dismantle governor assembly (consists of gop-governing oil pump and other, elements)., d) do servicing of gop and replace damaged items., e) assemble mop and governor assembly., f) put governor assembly in position., g) do alignment of the pinion shaft w.r.t to governor assembly., h) put electronic over speed shaft (pinion shaft) in position., i) put mop assembly in position., j) record backlash of gears and if requires, do adjustment., 8. measure the clearances of first three rows of oil gland fins & its servicing, 9. assembly of oil gland segments (new or old) and setting of clearances., 10. after the work, box up front pedestal top cover., 11. link control valve linkages, oil piping etc., 12. do rig test for setting governing characteristics., 10.20 tmstu56oh000 steam tur (bearings) serv- 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. check bearing interference, toc, soc etc., 5. remove turbine front bearing top & bottom halves., 6. do the dpt and ut of turbine bearing., 7. check thrust bearing pads and do dpt, ut and blue matching., 8. check toc, soc, bearing interference of bearing after servicing., 10.30 tmstu01bd794 steam tur (<=30mw#) repl-gland- 1. removal of first 2 rows of hp front steam gland segments., 2. servicing of (new or old) gland segments and springs., 3. measurement of dimensions and machining of gland segments if required., 10.40 tmtgs01bd701 turbine gov. sys (<=30mw#) maintenance- i) attending passing defect in four nos. steam control valves, ii) servicing of two nos. hydraulic servomotors (including relay gear) of control valves, iii) inspection & servicing of speed governor and setting its governor characteristics (rig test)., iv) inspection & servicing of cies valve (left & right)., 1. ensure ptw from concerned person., 2. breaking of insulation around steam control valves & removal of debris from site., 3. dismantle linkages and decouple all four nos. control valves from spring box assembly, 4. remove spring box assembly from position., 5. dismantle bonnet bolts & remove all four control valves., 6. check blue contact / kerosene test of plug with respective seats., 7. do lapping of all control valves, replace plug/other components, if required., 8. assemble all control valves and tighten bonnet bolts., 9. servicing of cies valves (left & right), 10.servicing of spring box assembly hinges & pins etc., 11.place spring box assembly & couple all control vales with spring box., 12. servicing of two nos. hydraulic servomotors of control valves., 13. servicing of primary relay oil cylinder for checking for excessive draining of oil. replacement of relay gear power, piston if needed., 14. servicing of secondary relay., 15. servicing of linkage., 16. replacement of steam leak-off and impulse line pipes as per eic instruction. dp test of welding joints are to be, carried out., 17. inspection of speed governor, assessment of its component s healthiness, repl