Tender For corrigendum : design verification, detail engineering, manufacture, supply, installation, testing and commissioning of 750 v dc third rail traction system electrification and auxiliary sub stations (ass) and associated scada systems for phase 2 of kmrl project.
Tender For planning designing supply installation testing and commissioning of 33 kv switching station with all electrical mechanical and scada automationsystem and equipment including civil construction of switching station and 33 0 415 kv electrification an
Tender For annual maintenance of bulk water system including instrumentation, automation and scada system of gvmc for one year (12 months from the date of loa).
Tender For expression of interest (eoi) for augmentation of water supply management system using real time data monitoring scada technology within agartala city
Tender For lot 2- equipment for supervisory control and data acquisition (scada) lab - scada system, scada system with hmi and applications, benchtop multimeter with lcrq- true rms, 100mhz two channel digital storage oscilloscope, control system lab, electric drives and control, master trainer (1 persons for three months)
Tender For design, manufacturing, supply, erection, testing & commissioning of automationsystem (scada) with all allied instrumentation & equipment for measuring and control of level, pressure, discharge, temperature, vibrations, all electrical parameters surge system etc. complete for pumphouse-i, ii & iii of jihe kathapur stage 2 and also provide master control at suitable location for the complete system monitoring. the automationsystem shall be capable of synchronization operation of required pumps at all pump stations and shall ensure long term safe operation of the lift irrigation scheme. the automationsystem shall be capable of stopping all the operating pumps at booster stations i&ii within 7 seconds in case of power failure . display all essential data on 52" led screen for all pump stations is also included in the scope of work manmachine interface shall be provided at all pump sta~ions at master control center. the communication shah be through gprs. the rates should be including lead, lifts and transportation. (system consider for one row of rising main and pumps)