Get complete information related to latest Cab Door Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cab Door Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cab Door Tenders.
Tender For supply of laminated side safety (cabdoor) glass as per els/lgd drg. no. c/els/lgd/b.f//49, alt.1 [ warranty period: 30 months after the date of delivery ]
Tender For supply of glass window - cabdoor - impact resistant of size 676mm x 486mm x 14.80mm to dlw part no. 17420088 for hhp diesel locomotives. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of lock assemblies for wag9, each set consists of 02 items of 10 nos 1. inter lock asse mbly for cab side door as per clw drg.no.1209.01.133.021alt-2. 04 nos/set. 2. lock assembly for machine room door and cabdoor as per clw drg. no.1209.01. 133.071 alt.-1. 06 nos/set. to clw specn. no. clw /ms/3/111/alt-3 or latest if any. note: clw approved sources shall only participate in the tender or supplie r offers shall be considered with valid tender specific authorisation certificate from clw source shall be su bmitted along with their offer. [ warranty period: 30 months after the date of delivery ]
Tender For guntakal division - (i) disconnection and reconnection of various traction bonds for track renewal works, including tbr-127.402 km, tbr(p&c) 158 sets and tfr (all fittings) - 196.835 km in the ru-gtl & ndl-ya sections. (ii) disconnection and reconnection of various traction bonds for track renewal works, including renigunta - guntakal (up & dn) trr(p) - 31.592 tkm, nandyal - yerraguntla trr(p)-2.0km. (iii) disconnection and reconnection of various traction bonds for track renewal works ctr(s) - 13.779 km, trr(s) - 5.559 km, ctr(s) - 1.69 tkm for a total length of ctr(s) : 15.46km & trr(s) : 5.559km in the ru-gtl section (iv) disconnection and reconnection of various traction bonds for track renewal works ctr(s): complete track renewal(secondary) of exg. 52kg/60kg rail on psc5/psc6 sleeper 1310/1540 nos./km with new 60kg r260 rail on wider psc(new) sleeper 1660 nos./km including recoupment of ballast and deep screening for a length of 8.08km ru-gtl, ndl-dhne-gtl (yard lines) & ru-gtl(yard line): trr(s) through rail renewal (secondary) of exg. 52kg/90utl rail with 60kg(sh) rail on psc6 sleeper for a length of 0.70km. (v) disconnection and reconnection of various traction bonds for track renewal works ru-gtl(up&dn): ctr(p): complete track renewal(primary) of exg. 60kg/90uts rail on psc6 sleeper with new 60kg/r260 rail on new wider sleeper 1660 nos./km including recoupment of ballast and deep screening for a length of 1.74km, ru-gtl(up&dn), ndldhne- gtl(sl/up), gy-pdl(sl): trr(p) through rail renewal(primary) of exg. 60kg/52kg/90uts rail with new 60kg/r260 rail on psc6 sleeper for a length of 21.58km and ndl-dhne(sl): tsr(p) through sleeper renewal (primary) of exg. psc6 sleepers with new wider sleeper 1660 nos/km including recoupment of ballast and deep screening for a length of 1.81km:- under the jurisdiction of adee/trd/hx sub-division.