Get complete information related to latest Cane Cutter Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cane Cutter Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cane Cutter Tenders.
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of canecutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For supply of the electric miscellenious material - empire tape 1", p.v.c. tape " steel grip make, glass tape size 1", cotton tape 1", black insulation tape 1" johnson & johnson make, fiber glass sleeve 1 mm, 2 mm, 3 mm, 4 mm, 5 mm, 6 mm, 10 mm, 18 mm, film paper 7 mile/ 10 mile, nomax paper 7 mile/ 10 mile, plastic coated leatherized paper 7 mile/ 10 mile, fiber glass pipe " x 4 to 1" x 4, condensor 2.5 mfd, 3.15 mfd, 4.0 mfd, 6.0 mfd, 8.0 mfd, 10.0 mfd, 30.0 mfd, 36.0 mfd, 100.00 mfd, 120.00 mfd, exhaust fan three phase 415 volt, 50 hz isi mark, size-18", size-24", exhaust fan blade size-15", size-18", size-24", auxilary contact block 3ta61,220 volt, 4no+4nc, auxilary contact block 3ta24/28, heater rod 1000 watt 12" long, 1500 watt 12" long, petrolium jally 50gm pack, alluminium/copper crimpling lugs (dowells make/ svs make), lug punching machine upto 400 sqmm crimpling dia r4 to r14, crimpling die r-4 to r-14, phase tester taparia make, c.r.c 226, hot air blower, benzene, insulating plier 8" taparia make, thinner dr.beak l1 twenty litre pack, air dry varnish dr.beak make elmo luft 1a - 21 litre pack, becktol red/grey dr.beak - 4 kg tin, motor connection plate for bbl/ke/siemense/crompton make motor 7.5 hp, 10 hp, 15 hp, 25 hp, 40 hp, screw driver set taparia make, proximettry switch ps 18 dbpo 5-30 vdc, h.b.c./hrc fuse link 250amp. tkf 250, 660 vac, 80 kag g.e.power controls, isi mark, volt meter 144 x 144mm, 0-600v, ae make, square type volt meter, 96 x 96, 0-600v, pedistal type amp meter 0-200 ctr 200/5, 0-300 ctr 300/5, 0-400 ctr 400/5, 0-600 ctr 600/5, flash mounting digital frequency meter 94 x 94mm, 45-55hz, 144x144mm, 45-55hz, soldering rod, soldering iron, soldering flux eyre no.7, soldering wire 60% + 40%, megger upto 1000 volt (hand operated), megger upto 1000 volt (mechanical operated), bakelite sheet 1/16" x 2 x 4 to 3/8" x 2 x 4, bakelite rod 2", potentio-meter pankaj make 500 ohm 3 watt, 5k ohm 1 watt, 600 ohm 3 watt, 10k ohm 1 watt, diode 15k kitron forward, diode 15k kitron reverse, power diodes for t.g.set 321 umr 100 reverse, power diodes for t.g.set 321 umr 100 forward, diode 12 hr 40/u.s.r. 120-40 usha 40 amp. normal polarity, reverse polarity, brass holder for fibrizer 400 hp slipring motor, brass holder for cane unloader carbon brush size- 40 x 40 x 20, brass holder for cane unloader carbon brush size- 25 x 25 x 100, carbon holder spring for above holder size- 40 x 40 x 20, carbon holder spring for above holder size- 25 x 25 x 100, copper carbon brush m-15 e quality(a) with pig tail 8 x 18 x 30, 10 x 30 x 40, 16 x 32 x 42, fibrizer motor 22 x 32 x 45, canecutter motor 20 x 40 x 50, 25 x 25 x 40, 25 x 25 x 50, 1500 kw alternator 25 x 40 x 55, (b) without pig tail (cane unloader) 25 x 40 x 40, 20 x 20 x 96/100, 25 x 25 x 100, ( c ) graphited carbon brush with double pig tail for centrifugal machine 12x32x45, 10x30x40, copper carbon brush m-15 e quality with double pig tail 25 x 32 x 50, 25 x 40 x 50, 32.5 x 32.5 x 12.5 (eg-224), copper carbon brush m-15 e quality for 1500 kw alternator rotor size 25 x 40 x 55, carbon holder for 15kw exciter jyoti make, tension spring for above, d.c.volt meter 65x65, 0-100 amp. panel mounting, push button element vaisno make 1no+1nc, rectifier 200amp + base (usha), semi conductor fuse gsg 1000/350, 600 volt ac, 350amp (bussmann make), fuse kit kat 20 amp. ee make, fuse kit kat 32 amp. sm-32 ee make, fuse kit kat 63 amp. sm-63 ee make, c.t.operated flash mounting amp meter 96x96mm 0-200amp ctr 200/5, 0-300amp ctr 300/5, 0-400amp ctr 400/5, 0-500amp ctr 500/5, 0-600amp ctr 600/5, 0-800amp ctr 800/5, 0-3000amp ctr 3000/5, but volt meter 0-600 v, current transformer ae 50/5,100/5,200/5,400/5,600/5, plastic cooling fan for ke/bbl/ngef make motor 3hp, 5hp, 7.5hp, 10hp, 15hp, 20hp, 25hp, 30 hp, 40hp, 50hp, flush type synchronius timer 2 delay 5-120sec. em 1000 gec, crane duty motor sq cage duty s-4 (crompton/gec/bbl/siemense make) all size/type, squarrel cage induction motor (c
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of canecutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f