Web Analytics Made Easy - StatCounter

Car Body Spares Tenders

Get complete information related to latest Car Body Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Car Body Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Car Body Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45422939 Due date: 08 Jun, 202608 Jun, 2026 NA
Tender For supply of body side window arrangement with fixed louvre shutter to drg.no.icf/mrvc/d/bt- (575)5-4-003, col.i, alt-d and as per specn.icf/md/spec-236,issue status-01,rev00. please visit icf vendor portal for downloading drawing https:// vp.icf.gov.in/ vendtendordetnew.php using key 0726w7gqijz1941 [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45438696 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For shell kit for memu tc1 jk 941 a. roof assembly 94516001 000 01, alt 'nil' - 1 no. location of sidewall94514001 000 01, alt 'nil' - 1 no. end construction alarm end 94515001 000 01, alt 'a' - 1 no. end construction non alarm end 94515002 000 01, alt nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status.01,rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt nil -2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. underframe arrangement 94111001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201,alt 'f'. packing as per icf/j&t/sk-1809,alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframes hould be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. stage inspection. (a) raw materialstage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

Central Government/Public Sector

CTN :45438697 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

Central Government/Public Sector

CTN :45153358 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For corrigendum : shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]

Central Government/Public Sector

CTN :45153099 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For corrigendum : shell kit for memu tc1 jk 941 a. roof assembly 94516001 000 01, alt 'nil' - 1 no. location of sidewall94514001 000 01, alt 'nil' - 1 no. end construction alarm end 94515001 000 01, alt 'a' - 1 no. end construction non alarm end 94515002 000 01, alt nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status.01,rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt nil -2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. underframe arrangement 94111001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201,alt 'f'. packing as per icf/j&t/sk-1809,alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframes hould be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. stage inspection. (a) raw materialstage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]

Central Government/Public Sector

CTN :45404675 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For supply of m. s. heavy duty scrap bin size: 60 inch (length) x 60 inch (width) x 32 inch (height) with capacity of 5 ton material: 1) use m. s. plate 3.15 mm in body part 2) 40x40 x5 mm angle use in side part and bottom frame 3) m.s. heavy channel in bottom: 100x50 mm - 03 nos 4) m. s. circle0- od: 250 mm, id: 150 mm, thickness: 10mm 5) painted with red oxide and oil paint. arrangement for lifting by hydra and forklift should be provided. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45395440 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For supply of set of items for body side entrance door of lhb coaches. 1. lower bearing arrangement(r.h) confirming to rcf drawing no. la51154, alt.-nil (or equivalent to icf drawing no. ssa51053, alt.-nil),qty.-1 no./set. 2. lower bearing arrangement (l.h) confirming to mirror assembly to rcf drawing no. la51154, alt.-nil (or equivalent to icf drawing no. ssa51058, alt.-nil), qty.-1 no./set. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

Central Government/Public Sector

CTN :45390972 Due date: 03 Jun, 202603 Jun, 2026 NA
Tender For supply of set of shutters for body side entrance doors of lgs/eog coach. 1) bottom shutter arrangement to icf drawing no. lgs/eog-58153004, alt.-nil, qty.-1 no./set. 2) top shutter arrangement to icf drawing no.lgs/eog-58153005, alt.-nil, qty.-1 no./set. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45393436 Due date: 22 Jun, 202622 Jun, 2026 NA
Tender For supply of body side window balancing arrangement cover plate for demu coaches as per sk no. snpd/f&f/189 [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45395473 Due date: 29 Jun, 202629 Jun, 2026 NA
Tender For supply of window bar to diameter 12 mm x length 1428 mm of body side window arrangement for lhb type jan shatabdi coach. material and specification as per drg. no. lj54110 alt. "a", item no. 4 (to be powder coated, colour - black). [ warranty period: 30 months after the date of delivery ] ]
 Loading, Please wait...

Connect us via What's Up