Get complete information related to latest Carbon Bush Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Carbon Bush Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Carbon Bush Tenders.
Tender For supply of modified stopper for pin for brake hanger nos.1,2,11,12,13,14,23 and 24 as per drg.no.c/els/ lgd/bogie/4/127. [ warranty period: 30 months after the date of delivery ]
Tender For supply of spring for wap-5 locomotive as per clw specification no.clw/ms/3/spec/eldo-bogie/004 alt-1 and clw drg. no. 1210-01.115-007 alt- [ warranty period: 30 months after thedate of delivery ]
Tender For supply of rubber hose, 3/4'' x1 metre, flexible hose assembly for bogie pipe to sr.dee/rs/gzb drg. no. 259/3ph/2013 alt [ warranty period: 30 months after the date of delivery ]
Tender For supply of wear plate for bogie brake gear of blc wagon drg.no:-contr-9404-s/10 _alt- 14, item no.-11. as per drawing attached [ warranty period: 30 months after the date of delivery ]
Tender For supply of bogie frame assly. for air spring lhb nac coaches to drg.no. lg03001 alt. 'e'and to specification : mdts-213 rev.04 [ warranty period: 84 months after the date of delivery ]
Tender For supply of anti roll bar bracket assembly work station of lhb bogie.specification no.mech/m&p/4000/gm/10 dt.20/02/2026. [ warranty period: 30 months after the date of delivery ]
Tender For supply of secondary lateral damper for air spring bogie to rdso drg. no. rdso/cg/drg/21049 alt 3 confirming to rdso specification no. rdso-cg-18005 rev. 2 of june-2025, amendement 1 of oct-25 [ warranty period: 30 months after the date of delivery ]
Tender For supply of finish machined rear cover for axle box roller bearing for motor coach bogie to icf drg. no.emu/m-0-2-004, alt-w/4, item no. 1 [ warranty period: 30 months after the date of delivery ]
Tender For rotation stop lug liner of size 03 x10 x50 mm as per fig.40 of rdso casnub bogie manual no.g95 (rev 1 of mar 1997) amendment no.5 of june 2003.note:- 1). material test certificate from nabl accrediated labs should be submitted along with the supply. 2). sample to be approved by consignee before bulk supply. [ warranty period: 30 months after the date of delivery ]
Tender For supply of cast steel side frame to rdsos drg.no.wd-89067-s-3, alt-19, item 1 & other technical requirements conforming to str no.wd-21-casnub-22nlb bogie-93 rev.2 of july-02, read with all amnds., latest amnd.6 of july-2020 [ warranty period: 30 months after the date of delivery ]