Get complete information related to latest Carpentry Material Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Carpentry Material Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Carpentry Material Tenders.
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]
Tender For supply of hood with diffuser for cope and drag cleaner consisting of item no 1 to 5 withquantity as indicated against each item as per rwf drg no 722093710260. note : packaging should be firm in wooden pallets to avoid damages during transportation. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs todrg. no. 66704005, col.i, alt. "b" = 2 nos . 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air springs to drg no. 66704011, col.i, alt. "b" = 2 nos. red oxide zinc chromate primer only to be coated to specification is:2074 of thickness 15-20 microns. specialcondition : material specn.no. en10025-5, 2004, s355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) shall be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fastened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the threaded portions shall be adequately protected with suitable protective covers to avoid damage during handling, storage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent damage, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs todrg. no. 66704005, col.i, alt. "b" = 2 nos . 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air springs to drg no. 66704011, col.i, alt. "b" = 2 nos. red oxide zinc chromate primer only to be coated to specification is:2074 of thickness 15-20 microns. specialcondition : material specn.no. en10025-5, 2004, s355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) shall be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fastened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the threaded portions shall be adequately protected with suitable protective covers to avoid damage during handling, storage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent damage, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]