Web Analytics Made Easy - StatCounter

Cell Disruptor Tenders

Get complete information related to latest Cell Disruptor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cell Disruptor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cell Disruptor Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :41524295 Due date: 06 Sep, 202506 Sep, 2025 4.21 Lacs
Tender For ame for repairs and reconditioning of special lighting equipment available in mahathi auditorium pertaining to esd-iii, tirupati for the year 2025-26

CTN :41306086 Due date: 25 Aug, 202525 Aug, 2025 10.00 Lacs
Tender For corrigendum : supply of 3dof drone stability test jig alongwith proprietary software c c - 3 dof drone stability test jig alongwith proprietary software , 2 dof drone stability test jig alongwith proprietary software , drone sensor integration and testing equipment , flight controller assembly programming station , esd workbench for 2dof platform

State Government

CTN :41439327 Due date: 21 Aug, 202521 Aug, 2025 20.34 Lacs
Tender For tender for providing sop on 11 kv to crc complex sundernagar by providing 400 kva 11 04 kv distribution transformer alongwith ctpt metering equipment and ht line for 340kw load in e section local ii chatrokhar under esd hpsebltd sunde

CTN :41405375 Due date: 21 Aug, 202521 Aug, 2025 1.30 Lacs
Tender For supply of tool and equipment d d - injector test machine , bench grinding for hvy duty , gear box jack , cordless impact wrench hvy duty , master tool set 150 pcs , esd coat with cap

Central Government/Public Sector

CTN :41212371 Due date: 08 Sep, 202508 Sep, 2025 NA
Tender For corrigendum : supply of igbt based 3-phase drive propulsion equipment with physical medium i.e. esd/ emd/ ofg for multi - functional vehicle bus (mvb) as per iec 61375, terminal bracket, bus bar link and cu braid required for connection between main transformer and traction converter, auxiliary converter, interfacing connectors, cables and cable loom requir ed for connection from vcu1/2 to sb1/2 panel. as per spec. no. i) rdso/2008/el/spec/0071, rev.5 for igbt based 3-phase drive propulsion equipment, ii) clw/es/3/0458 alt.e for cont rol cables, iii) clw/es/3/0459 alt. c for screened cable, iv) clw/es/3/0124 alt. o . in additio n to above description, the propulsion system should also comply requirement mentio ned in "schedule of requirement" (sor), copy attached with tender documents. [ warran ty period: 72 months after the date of delivery ]

State Government

CTN :41313648 Due date: 11 Aug, 202511 Aug, 2025 18.79 Lacs
Tender For e-tender for partial turn-key basis for providing erection and commissioning of 11 kv ht line a/w 11/.4 kv 250 kva dtr and ct/pt unit with metering equipment for electrical vehicle charging station at bus stand nahan under esd hpsebl nahan no. i.

State Government

CTN :41313650 Due date: 11 Aug, 202511 Aug, 2025 19.59 Lacs
Tender For e-tender for partial turn-key basis for providing erection and commissioning of 11 kv ht line a/w 11/.4 kv 630 kva dtr and ct/pt unit with metering equipment for electrical vehicle charging station at workshop nahan under esd hpsebl nahan no. i.

Central Government/Public Sector

CTN :41016836 Due date: 25 Aug, 202525 Aug, 2025 NA
Tender For supply of igbt based 3-phase drive propulsion equipment with physical medium i.e. esd/ emd/ ofg for multi - functional vehicle bus (mvb) as per iec 61375, terminal bracket, bus bar link and cu braid required for connection between main transformer and traction converter, auxiliary converter, interfacing connectors, cables and cable loom requir ed for connection from vcu1/2 to sb1/2 panel. as per spec. no. i) rdso/2008/el/spec/0071, rev.5 for igbt based 3-phase drive propulsion equipment, ii) clw/es/3/0458 alt.e for control cables, iii) clw/es/3/0459 alt. c for screened cable, iv) clw/es/3/0124 alt. o . in ad dition to above description, the propulsion system should also comply requirement me ntioned in "schedule of requirement" (sor), copy attached with tender documents. [ wa rranty period: 72 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up