Get complete information related to latest Chair Lift Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Chair Lift Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Chair Lift Tenders.
Tender For supply, installation, testing and commissioning of 15 passanger cum stretcher elevator in construction of o.t. with ward at fatehpur, distt. sikar.
Tender For corrigendum : supply, installation, testing and commissioning of 15 passanger cum stretcher elevator in construction of o.t. ward at fatehapur district sikar
Tender For award of contract for extension of existing man riding chairlift system (mrcls) from 14l to 19l of 3seam for a length of 326 m of m/s. indicon west falia pvt ltd make at kasipet-2 inc., mm area-reg.
Tender For supply of spares for iwf make chairlift manriding system pac bid : : - clit for chair bracket part no iwla4c98 , circlip int part no a4c1043 , curve roller for 18 by 16 mm rope part no iwla4c103 , filter cartridge part no iwlfc151137 , chair seat part no iwla3b2737 , chair complete with 4 roller suspension part no a3b273a3c529 , du bush mb 2015 du part no iwla3b27310 , circup for curve roller part no a4c1048
Tender For supply, installation, testing and commissioning of 15 passanger cum stretcher elevator in construction of o.t. with ward at fatehpur, distt. sikar.
Tender For corrigendum : supply, design, manufacture, installation, testing, commissioning of heavy duty elevator of machine room and gear less type, microprocessor based vvvf ard system hospital stretcher lift (g+6) for 15no. passenger capacity complete with all accessories, floor announcement system, intercom, overloading warning system, doors car & landing shall be stainless steel scratch resistant etc. as per rdso specification no. rdso/2013/em/spec/0016 (rev-2) -2025 or latest with amc period of 10 years after expiry of warranty period). warranty period: 30 month(s) from the date of supply or 24 months from the date of commissioning. [ warranty period: 30 months after the date of delivery ]