Web Analytics Made Easy - StatCounter

Check Wall Tenders

Get complete information related to latest Check Wall Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Check Wall Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Check Wall Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45241096 Due date: 23 Jun, 202623 Jun, 2026 NA
Tender For corrigendum : supply of set of lavatory sidewall for amrit bharat ac coaches (without primer). as per drawing no. a) 829-1-4-006 alt. nil: 1 no. b) 829-1-4-007 alt. nil: 1 no. c) 829-1-4-008 alt. nil: 1 no. d) 829-1-4-009 alt. nil: 1 no. note: a) drawing number: aaa51072 to be read as mvmc15013 alt. nil. b) in drawings "mig welding (131) is to be read as tig welding (141)" as per rcf design letter no md46231 dated 16.03.2024. packing instruction:p1030 rev. 0 [ warranty period: 84 months after the date of delivery ] ]

CTN :45222424 Due date: 05 Jun, 202605 Jun, 2026 35.00 Lacs
Tender For corrigendum : interlocking and sidewall construction work from the old hostel (hanuman temple) towards teacher colony in government inter college in orai city

CTN :45222428 Due date: 05 Jun, 202605 Jun, 2026 39.07 Lacs
Tender For corrigendum : interlocking and sidewall construction work in government girls inter college in orai city

Central Government/Public Sector

CTN :45395689 Due date: 22 Jun, 202622 Jun, 2026 NA
Tender For supply and installation of thermal insulation for sidewall of railwaycoaches size: 50 x 935 x 1000 mm conforming to rcf specn. mdts-28001, rev-06 or latset and to drg.no. lwsczac(534)-9-0-004,alt-g, col-1,item-3 only. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45396776 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

Central Government/Public Sector

CTN :45392565 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For supply of one coach set of sidewall details for lhb ac composite coaches to drg. nos. 1)frame work to drg. no 83214004, alt 'b' - 1 no. and 83214005, alt 'b' - 1 no. all the items to be supplied as loose. angle to drg no.aaa14809 alt'nil' in the roof flange assembly to besupplied as loose. 2) carline assembly to drg. nos. 83214008, alt 'c' - 1 no. and 83214009, alt'c' - 1 no. single piece crf carline to drg no 83214010 alt 'a' and 83214011 alt 'a' to be followed. 3) welding parts to drg. no. 83214003, alt 'g' - 1 no. and 83214018, alt 'c' - 1 no special condition : packing drawing: i. for frame work and welding parts icf/j&t/sk-1865, alt 'a' to be followed. ii. for carline icf/j&t/sk-1882, alt 'a' to be followed. to be supplied in packages of individual coach sets only. - all the threaded holes shall be provided with suitable dummy bolts to safeguard the threads to avoid clogging while painting.. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

Central Government/Public Sector

CTN :45120485 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For corrigendum : shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "nil" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturingfacility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of bodyshell items and partition frames for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "a" - 1no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'b' - 1no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'e'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframeshould be supplied as normal side up & side bearer side down. packing conditionas per icf/j&t/sk-1865, alt 'a'. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion [safety item ]

Central Government/Public Sector

CTN :45393443 Due date: 22 Jun, 202622 Jun, 2026 NA
Tender For supply of exterior stickers for lhb scn coaches, as per drawing: ls83002 alt f w/o item 1,9 & 18, follow material spec. to rdso specification no. rdso/2006/cg-13 rev-01 option b (ref. md46271 dated 01.04.25), packing instruction: exterior sticker/ marking diagram outside set of sidewall stickers should be rolled firmly on a cardboard tube/pipe of aprox. 03 inches diameter of sufficient strength and length more than sticker 2-3 inches of maximum width of sticker . endwall stickers of same set should also be rolled onseperate another cardboard tube/pipe (having similar dimensional and strengthparameter ) in same way. both tubes of one set should be packed together in a bio degradable transparent polyethylene packing. stickers or any edge of sticker should not be found folded in packing. vinyl film side of stickers should be on the outside of tubes.these individual sets are further to be packed in card box (containing bulk quantity of sets). a list should be pasted on each set of transparent polyethylene packing and also on card box (containing bulk quantity of sets) showing pl no., item description, po no., name and address of supplier, date of manufacturing, lot number, lot quantity, list of items in a set etc. [ warranty period: 12 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45394867 Due date: 03 Jun, 202603 Jun, 2026 NA
Tender For supply of exterior stickers for ac 3t amrit bharat coaches., as per drawing: lwaccn/pp2-8-3-002 alt ar w/o item 3,16 & 23, follow material spec. to rdso specification no. rdso/2006/cg-13 rev-01 option b (ref. md46271 dated 01.04.2025), packing instruction: exterior sticker/ marking diagram outside set of sidewall stickers should be rolled firmly on a cardboard tube/pipe of aprox. 03 inches diameter of sufficient strength and length more than sticker 2-3 inches of maximum width of sticker . endwall stickers of same set should also be rolled on seperate another cardboard tube/pipe (having similar dimensionaland strength parameter ) in same way. both tubes of one set should be packed together in a bio degradable transparent polyethylene packing. stickers or any edge ofsticker should not be found folded in packing. vinyl film side of stickers should be on the outside of tubes.these individual sets are further to be packed in card box (containing bulk quantity of sets). a list should be pasted on each set of transparent polyethylene packing and also on card box (containing bulk quantity of sets) showing pl no., item description, po no., name and address of supplier, date of manufacturing, lot number, lot quantity, list of items in a set etc. [ warranty period: 12 months after the date of delivery ] ]

CTN :45385404 Due date: 22 Jun, 202622 Jun, 2026 39.62 Lacs
Tender For ward no 06 mo. pandit dindayal nagar me ramkishun rajbhar ke khet se balai rajbhar ke khet tak sidewall v cc road ka karya
 Loading, Please wait...

Connect us via What's Up