CTN :44933425
09 May, 2026
NA
Tender For supply of swimming cum dving pool equipment at niws, goa (competition equipments) - headwall/endwall platform for pod, those platform suttable inr swimming pool with water nocirculation in four sides. it is composed of an asi 304 stained frame and plastic grating, grating sharuld be made of polypropylane uv rays and n class="text-red-selected">chemicaln>
n class="text-red-selected">productsn> prese
nt i
n ther water, the grati
ng should have free space of over 45% to facilitate water recirculatio
n, platie
nm ca
n i
n das turmi
ng pa
nel a
nd jy should i
nclude a
nchers for mou
nti
ng a
nd for starti
ng blocks, walth-2.5 m , starti
ng a
ncks with mou
nti
ng frames a
nd fulatio
n bolts the starti
ng block is mamdactur
ned u
na
ng a154-36 pu
ni
nted with epoxy mom polished a
nd dip of plaw size 300 x 700 mm hight dorady polyethyle
ns with
no-slip machi
ni
ng top phaticem, adjustabüm a
ngle of divi
ng platform surface mas 10 double havalle humore
ntal a
nd vertical for hackstroke start. the starti
ng hack is provided to bra
ndi
nside. made i
n di
ng with fi
na mulatiom make-aqvastar/deputech/a
n , fluat la
ne 150mm dia a
nti wave levaker law pes made made i
n polyethyle
ne with a
nti-acid a
nd a
nti uva treat with special feature o limi
nate wave moveme
nt complete with spri
ng te
nsio
ner all i
n st la
nder i
n sem, i
nordi
ng with e
n 15451-5 a
nd fi
na mgulatio
n a
n of high level competitistes i
ncludi
ng 55 316l the dout po
nd make-apastar/depatech/am a
nchored , 55 hoat la
ne strage desig
ned to tra
nsport a
nd sto
ne the fi
nat li
ne afier use i
n the swimmi
ng pool. easy to use a
nd a
nthetically disemet. the boot filler is mara
ndactu
ned usi
ng asi-304 stai
nless steel a
nd i
ncludes a pvc hug for collecti
ng e
ncase water from the that li
nes bag's lower lts, it is o
ngti
nd i
n a co
ntrolled ma
nner with
no water spillage , the cart has fimur
natati
ng whouts for maximum mobility. tww it these have a wake suitable for stage of 1.
ne of 50 m la
ng 150 mm dia. fatat la
ns , false stari i
ndicator post-cumprisi
ng i
n 2
nos sla
nlase sivel mol , pa
nts
nach od 48 mm du a
nd 18 m height provided u
n stiher side of the raci
ng pool propy a
nchored i
n a stable a
nchori
ng suchat o
n the duck at specified smatio
n i
ncludi
ng ore post provided with pully a
nd quick cord fixi
ng a
nd losow
ni
ng device a
nd i
ncludi
ng falso start li
ne comprisi
ng py
nter a
nd float make-aqvartar/dhepatech/a fi
na , a) back stroke tur
n i
ndicator posimprisi
ng of 2 vs 56 3i
n1 po
nts sach of 48 mm dia a
nd 1.8 m height provided o
n silher side of the raci
ng puus properly used i
n a suitable a
nuhu
ni
ng ucht u
n the deck at specified locatio
n a
nd shall these i
nchali
ng set al lags specificatio
ns make-aquastar/deputech/ a
nti pe fi
na , water polo goul pu
nt, the water polo goal post should be lightweight, houti
ng a
nd very resista
nt. it is built o
nly from mi
nium a
nd i
n ve
npai
nted white ma
nulaturi
ng a
nd mutaco
ndam
n with fi
na a
nal swimmi
ng frde
natum sta
nda
ns, floati
ng plyu
nithar ham-filled alumi
num floats, goal frame alumi
nium tube,
net dasturi
ng a
na
ne stel mu
nd rod,
net side pape stai
nless steel i
nmu
nd pipe with faste
ni
ng i
n frame a
nd frist, faste
ni
ng for gral li
nes,
netts i
ncluded. made i
n acro
ndi
ng fi
na regulatio
n with make-aqvastar/depatech/a
nti , maxiflex ib divi
ng spri
ng board: 116 mati-alla , pare ribbed extrusio
n of alumi
num alloy 6070-th, heat treated for yield , strth of 30000 pha
n-borum, a
n a
nchor a
ngle, a
nd ap , a
nd cap rivuted to the basic witam. it is tape
ned from the furum ama to the , divi
ng tip, a
nd it is taperad f the fulcrum ama ti , the a
nchor a
nd. the admible-taper alirws the whole hard to are while flesu
ng , givi
ng it approximatuly 15% more lift tha
n the 16 du
nafies. the ar , are wi
ndarved u
ndumaath by shaped alumi
num mazi-boti
ng , estras wut disti
nguishes the maxi- from the others is that the , divi
ng tige has 189 sote i
n the marial sử the top "ski
n which duces the , divi
ng board short sta
nd without ha
ndrail dw die
ng sta
nd a
nchor a
nal fulcrum asambly shall he durafirm, shout sta
nd desigu
nd meu
nti
ng o
n a co
ntest, the fud-labrica
nd divi
ng platform. the divi
ng staral shall co
nsist ve heavy alumi
num casti
ngs catal with pe