Get complete information related to latest Chock Valve Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Chock Valve Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Chock Valve Tenders.
Tender For corrigendum : supply of valves required for liquid oxygen cryogenic tank at the oxygen plant : : - bull nose connection stainless steel 15 , nut hes brass 15 nb for samson regulator , pressure regulator 3 port , valve flow divertor bronze 25 nb , valve long stem globe ss body 15 nb , valve long stem globe ss body 25 nb , valve long stem globe ss body 6 nb , valve needle stainless steel 1 by 4 npt f , valve non return ss body brass top 25 nb , valve safety relief bronze1 by 2 npt x 1 , valve thermal relief bronze 3 by 8 npt
Tender For work contract for in-situ material buildup over damaged body seat/seat cutting/machining/blue matching of body seat and servicing of spring loaded safety valves installed at boiler of 1x210 mw bhel make boiler at atps mppgcl chachai.
Tender For corrigendum : insitu repairing works of high pressure feed water gate valve, main steam stop valve, nrv and hp/lp bypass control valve, safety valves of turbine and boiler area of 2x600 mw katpp, jhalawar
Tender For custom bid for services - miscellaneous machinery jobs for vessel ma ganga-i 20 fireline mains are to be pressure tested. the relief valve is to be overhauled and pressure tested, and the results are to be shown to the irs/mmd/iwt surveyor. leaky joints are to be renewed with new joints if required. all damaged fire line clamps are to be renewed as per the recommendation of irs/smpa. satisfactory trials is to be given with 02 nos fire hoses in fwd & aft in front of the surveyor. , 1 20.a in-situ pressure testing of fire line pipes up to 100nb 100 mtrs, 2 20.b supply of fire hose-65mm dia 18mtr length 2 nos, 3 20.c remove,refit ,overhaling & pressure testing of relief valve 1 nos, 4 20.d renewal of clamp support 50 nos, 5 20.e new sealing rings are to be provided in all fire hydrants 10 nos, 6 21 "emergency fire pump: pump is to be overhauled. suction (steel pipe size 62mm od short bend,610mm length), and delivery bend (steel pipe size 62mm od short bend with one side threaded 65mm od,610mm length), reducer, suction filter and hard polymer pipes (62mm id 75mm od, suction 12 mtr approx.) are to be renewed., *all spares for pump overhauling will be supplied by smpa." 1 l.s., 7 42 "hydrophore and air bottle: main air bottle fwd and aft outlet cocks (2 nos.) are to be renewed. safety/relief valves are to be renewed. sea water and fresh water hydrophore air charging cocks are to be renewed., **all material contractor supply" 1 l.s., 8 53 "insulation covering and netting is to be removed from the exhaust pipes for main engines and auxiliary engines for surveyors inspection and to be fitted back with new insulation and netting., **all material contractor supply, " 50 per running mtr., 9 54 "air compressor system both air bottle valve found leaking, same are to be renewed. air compressor (specification: tyco, wp-125 psi, tp--210 psi) is to be overhauled and satisfactory trial is to be shown to smpa., *** all spares smpa supply." 1 l.s, 10 55 "exhaust chimney of officer's & crew galley is to be serviced., **all material contractor supply" 2 nos., 11 3 "regarding blowers ( motors 4.1kw/5.5 hp) e/r 2 nos.. supply blower,1 no. e/r exhaust blower on boat deck (aft), its foundation & trunking is to be removed from place for cleaning, including closing arrangement. blower motor is to be overhauled. after proper alignment and balancing all blowers and trunkings, the same are to be fitted back in place. blower bottom water extraction passages are to be made. , *all material contractor supply" 3 per blower, 12 4 "regarding 2 nos.toilet exhaust blowers (motors 3 h.p.-crew and officers' toilet), their foundation & trunking is to be removed from the place for cleaning, including closing arrangement. blower motor is to be overhauled. after proper alignment and balancing all blowers and trunkings,same are to be fitted back in place. blower bottom water extraction passages are to be made. , *all material contractor supply" 2 per blower.