Get complete information related to latest Chute Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Chute Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Chute Tenders.
Tender For replacement of liner plate 8/10mm of transfer chute, bunkers and repair of transfer chutes/bunker at various location of imb plant at balaghat mine.
Tender For scope of work (sow) as mentioned in tender and schedule of work( 18 )items as given below ,[1] replcg,chain&liner of esp chain conv 2.000 set,[2] rectfn,esp cltg&emitting electrode assy 2.000 set,[3] ern,platform,str etc 20.000 to,[4] chng pug mill,screw conv,g.box in sp-1 2.000 ea,[5] changing of pulleys at bc-138,139 etc. 12.000 ea,[6] chng , alg of g boxes at bc-138,139 etc. 10.000 ea,[7] dis/ fab/ erect of th-5/6 beams of sp1 25.000 to,[8] changing of pulleys sp-1 20.000 ea,[9] change and alignment of g.box 12.000 ea,[10] repair and overhauling of flap gate 3.000 ea,[11] dismantling of worn out chute,structures 30.000 to,[12] fabrication of worn out chute,structures 30.000 to,[13] erection of worn out chutes, structures 30.000 to,[14] cleaning of diff.conveyor chute of sp-1 15.000 ea,[15] css unit making ready & changing 2.000 set,[16] slotted deck making ready & changing 20.000 ea,[17] repairing and maint. of table feeder 6.000 ea,[18] o/h and changing of ind water /sump pump 6.000 ea
Tender For e- tender for nctps – i – se/mi circle – aoh (25-26) – mpm dn.– unit iii – overhauling of 36” gravimetric feeder gear box,cleanout conveyor, coc gear box, ti chute, cold air gate andproviding the under bowl side liner works during annualoverhauling for the year 2025-26
Tender For e- tender for nctps – i – se/mi circle – aoh (25-26) – mpm dn.– unit iii – mills 3c & 3d – dismantling and lowering of mdvs,mpos, mill outlet elbows and classifier blades, patch welding inworn out portion and dismantling of centre coal feed pipe type i,ii & ss chute, venturi assembly, re-fixing new/rectified centrecoal feed pipe i, ii & ss chute & classifier assembly, rectificationof venturi assembly and fabrication of walkway around transferchute during annual overhaul for the year 2025-26