Get complete information related to latest Ci Pipe Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ci Pipe Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ci Pipe Repair Tenders.
Tender For laying of 150mm dia di water supply line for providing water supply connection to gr builders represented by guru charan dubey and others sy.no.63 and 117 and 118 gayathri nagar under suchitra section, sub division i, operation and maintenance division xii (swc file no.2025-4-720)
Tender For laying of 100mm dia di water supply line from h.no.1-2-122/2 to 1-2-81 in kummari basthi for avoiding no water complaints under alwal section, sd-i, operation and maintenance divn.no.xiii.
Tender For repair and grouting of swimming pool , laying of water pipeline,cleaning of drain and sewer line,repair of footpath, filtration plant,common areas alongwith other minor civil works at baba gangnath sports complex.
Tender For work contract for providing laying jointing & testing of hdpe pipe line at various water supply schemes under division bari district dholpur
Tender For work contract for providing laying jointing & testing of di pipe line at various water supply schemes under sub division bari district dholpur
Tender For supplying and laying of water supply distribution of valve and maintenance of pipe line work at ward no-1 to ward no-18 in harur municipality
Tender For water supply fund(2024-25) replacement of wornout damaged ac/psc pipe to ms /di pipe and laying water supply distribution main di pipe 300mm dia 242 rm at erode road sandeipettai to tcs nagar pirivu near for jeevanagar oht line link in tiruchengode
Tender For -custom bid for services - tender for attending fire water, raw water and other ug line leakages at mrpl aromatic complex as per boq (bidder has to quote lumpsum price higher or lower than the sor value excluding gst as per boq).-1 1050799 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 0 to 1.5 m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, . all complete as per standard specifications and diretction of engineer incharge, 2 1050800 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 1.5m to 3.0m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge, 3 1050801 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 3.0m to 4.5m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge. 4 1050802 backfilling and compacting the soil in layers of 300mm after execution of the work to proper grade and level with selected materials from available excavated soil from soil heaps within a lead of 2.00km, including re- excavating the deposited soil excavated earlier, breaking clods, loading, transportation, unloading, spreading to required level, watering, rolling and ramming by manual methods/ mechanical compactors, dressing, trimming etc. with all tools & tackles, machinaries, labour etc complete as per standard specifications and diretction of engineer incharge. 5 1050803 transporting & disposal of the surplus earth and excavated material including shrubs and vegetations from construction area to maximum lead of 2.0 km including reexcavating the deposited soil excavated earlier, loading, transportation, unloading, laying at all depths and heights, stacking, leveling and dressing both the area (viz. from where the earth is transported and where it is deposited) to required levels and slopes all complete as per standard specifications and diretction of engineer incharge.(the work volume of surplus material shall be measured as the difference of volume of excavation & the volume of back filling.), 6 1050804 pumping out water including dewatering the water mixed with muck/sludge etc from the trenches, ponds and other miscellaneous areas including supply and installation of dewatering pumps by contractor with all labour, hoses, consumables fuel etc.complete as per the directions of engineer incha