Get complete information related to latest Ci Valves Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ci Valves Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ci Valves Tenders.
Tender For supply of chain conveyor system installation,dismantling and shifting of existing conveyor system,conveyor mid section drive unit,conveyor helical drive unit supply installation,fabrication and installation of mid drive assembly,conveyor bend section supply installation,supply and installation of stainless steel plates,shifting of 24head platform,shifting of 24head adjustment scale,12inch and 14inch pipeline laying work,welding and cutting of hydrant pipeline,anti corrosion wrapping coating of hydrant pipeline,replacement of 12inch valve,supply of industrial chipping machine,rcc,connection of msv vapour pipeline,supply and installation of 1inch pipeline,painting of 6inch pipeline,installation of isolation valves,replacement of channel structure,repair and maintenance of telescope booms,chain conveyor system supply,supply of stainless steel soap trays,supply of mild steel soap trays,supply of heavy duty soap trays,fabrication of pipeline and structural side cladding,supply and installation of drip trays with y bend
Tender For corrigendum : auction sale of depot ferrous scrap - 12301ci26a, 98081317, quantity- 35.535 mts scrap condemned unserviceable ci material consisting of weights, wheels, colour light body, colour light base, weighing machines, civalves, tracer valve, sequence valve, proportional systems control valve, ms-ci body of electric detectors, pean, peas, rcrb, levelling values, cocks un loader scale, non-return values, ci- ms hand pump, ci lift counter weight, isolating cock, drain valves, passenger emergency alarm valve, ci bmbc piston, pedestals, blocks, rollers, pump set bodies, base plates, moulds, gate valves, distribution valves cocks, boxes, hose pipe cocks, dirt collectors, brake units, pipes, structural and round ci bases, cut off angle cock, ci wsf ep unit value, wsfar bulb, cell base, isolating cock, peasd, nrv, crp, ekt%u2019s, e type locks, ci anti vibration mounting pad, filter housing, hydraulic return line, ci vertical pneumatic value bmbc spares, ciwra bodies, cylinder heads, lhb brake disk, pneumatic valves, water column stanchion, head turner cylinder and other ci material of sorts and sizes with or without attachments of ms. location- bin no- 301, left side of link road no- 1, while approaching from road no- 2 to road no-1. hsn code- 72041000. gst- 18 percent note- delivery on actual weighment basis only. special note: overload of the carrying capacity of the vehicle will not be permitted at the time of taking delivery as per motor vehicle act 1988.
Tender For quotations for pvc pipe , c fixing of c.i. valves hydrants , cutting di pipe and chipping or filling the surface to a uniform finish 1. 100 mm i/d
Tender For brick flooring providing and laying, c fixing of c.i. valves hydrants extra for fixing sluice valves, fixing bell mouths bailing out water, filter media providing and fixing cast iron detachable joints class-15 marked with is: 8794, filter media providing, lowering, laying, filter media cutting di pipe and chipping or filling the surface to a uniform finish 1. 100 mm i/d, filter media joining di socketed pipes, valves and special with rubber tyton joints fitted complete including cost of labour and tools etc, filter media providing, lowering, laying in trenches, aligning, fixing, earth work, demolishing dry brick pitching
Tender For providing of custom bid for services - various repair jobs of emd - overhauling/dismantling of the existing w ater drainer by isolating the drainer by putting blank plate after isolation valve. purging/removal of trapped gas from the seal pot/pipe line by injecting st eam/nit rogen. revisioning of all parts & cleaning of pot. if required, the complete seal pot w ith pipe line has to be new ly fabricated & erected as per the instruction of o.a. or as per draw ing. after erection, testing of pot by injecting st eam/nit rogen and de-isolation/commissioning. the condensate pipe from w ater drainers has to be laid to the nearest storm w ater manhole or as directed by o.a.s representative. painting of w ater drainer and pipes to be done after the erection job , "technical cleaning of gas pipeline water drainers. the w ork involves closing/blanking of valves, st eam purging of pipe/drain pot and opening of f langes of seal pot and removal of muck/deposit from pots, revisioning of gas inspection valve,w ater filling valves,condensate valves. fixing of new packing and tightening of f langes. filling of w ater in the seal pot and de-blanking of w ater drainer/opening of valves. checking for any leakages and rectification of the same " , the job involves cutting/dismantling of corroded structures like column, platforms, w alkw ays, staircases etc. at height. before cutting of any structure, the nearby pipe lines or any other equipment to be supported f irst. the dismantled structures should not be throw n from height. all the dismantled structure to be kept at one place as directed by o.a.s representative for disposal by bsp , the job involves fabrication of st eel structures like column, platforms, w alkw ays, staircases etc. by type 1 electrode, as per approved draw ing / specification or as directed by oa/oa¿s representative complete in all respect including painting. fabricated structures w ill have to be erected by the contractor at height as per the direction of operating authority , the job involves w elding of tack w elded pipes, gland compensators, disc compensators, flanges, st eel structures, gas pipeline equipment, plates, pipes, structures w ith type 1 w elding electrodes , dismantling of gas pipe line or any other pipe line by cutting, including handling and stacking, cutting into pieces and sections as directed by oa/oa¿s representative & stacking at designated location. before cutting the nearby pipe lines/platforms/equipment to be supported. all dismantled structural items to be kept at a particular place, as show n by o.a.s representative for disposal by bsp , job involves erection of fabricated/available pipes at locations show n by o.a./o. a' s representative, including dia. 100mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves,compensators, saddle supports etc. also to be erected, as directed by o.a , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 100mm and up to dia. 200mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 200mm and up to dia. 500mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves, compensators, saddle supports etc.also to be erected, as directed
Tender For various repair jobs of emd - overhauling/dismantling of the existing w ater drainer by isolating the drainer by putting blank plate after isolation valve. purging/removal of trapped gas from the seal pot/pipe line by injecting st eam/nit rogen. revisioning of all parts & cleaning of pot. if required, the complete seal pot w ith pipe line has to be new ly fabricated & erected as per the instruction of o.a. or as per draw ing. after erection, testing of pot by injecting st eam/nit rogen and de-isolation/commissioning. the condensate pipe from w ater drainers has to be laid to the nearest storm w ater manhole or as directed by o.a.s representative. painting of w ater drainer and pipes to be done after the erection job , "technical cleaning of gas pipeline water drainers. the w ork involves closing/blanking of valves, st eam purging of pipe/drain pot and opening of f langes of seal pot and removal of muck/deposit from pots, revisioning of gas inspection valve,w ater filling valves,condensate valves. fixing of new packing and tightening of f langes. filling of w ater in the seal pot and de-blanking of w ater drainer/opening of valves. checking for any leakages and rectification of the same " , the job involves cutting/dismantling of corroded structures like column, platforms, w alkw ays, staircases etc. at height. before cutting of any structure, the nearby pipe lines or any other equipment to be supported f irst. the dismantled structures should not be throw n from height. all the dismantled structure to be kept at one place as directed by o.a.s representative for disposal by bsp , the job involves fabrication of st eel structures like column, platforms, w alkw ays, staircases etc. by type 1 electrode, as per approved draw ing / specification or as directed by oa/oa¿s representative complete in all respect including painting. fabricated structures w ill have to be erected by the contractor at height as per the direction of operating authority , the job involves w elding of tack w elded pipes, gland compensators, disc compensators, flanges, st eel structures, gas pipeline equipment, plates, pipes, structures w ith type 1 w elding electrodes , dismantling of gas pipe line or any other pipe line by cutting, including handling and stacking, cutting into pieces and sections as directed by oa/oa¿s representative & stacking at designated location. before cutting the nearby pipe lines/platforms/equipment to be supported. all dismantled structural items to be kept at a particular place, as show n by o.a.s representative for disposal by bsp , job involves erection of fabricated/available pipes at locations show n by o.a./o. a' s representative, including dia. 100mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves,compensators, saddle supports etc. also to be erected, as directed by o.a , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 100mm and up to dia. 200mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 200mm and up to dia. 500mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves, compensators, saddle supports etc.also to be erected, as directed by o.a. , overhauling of valves up to d