Tender For supply of io box with face plate with pvc box , cat 6 cable 305 meter box , patch panel cat 6 48 ports for work station , patch cord 2mtr cat 6 for work station , patch cord 12-15 inch patch cord cat 6 for rack , numbering tag , cisco switch c1000-48t 4g-l/ 5 year warranty , 24 port gigabyte smart managed poe switch 5 year warranty , 9u iso/iec standard lockable cabinet 400mm , 6u iso/iec 60297 standard lockable cabinet 400mm , 24 port panel loaded , 1kva ups , all product to be supplied with installation with cat 6
Tender For supply of 24 port data only 4 x 10g network switch , 12x25g fiber ports switch , indoor access points , single mode 10g fiber module , 24 port rack mountable patch panel , cat6 modular rj45 computer socket , 3md conversion frame for cms trunking , 1md front module cover plate , 3md front module cover plate , 1m blank plate , 0. 5 meter cat 6 utp patch cord , verified 3 meter cat 6 utp patch cord , 32u floor mounted rack , utp 4 pair cat 6 cable , 100x50mm pvc cable management system , 100 x 50 mm pvc cable management syster along with accessories , rack mountable liu 12 port liu 6 port 2nos , fiber pig tail , flange mount connector , fiber patch cord , dome camera , network video recorder up to 8 channel , 4 tb hdd surveillance , labour charges for supply installation ,commissioning and fixing, labelling and documentation of all items and other related work
Tender For construction of retaining wall at km 3/820 to 3/835, 4/310 to 4/330, providing and laying 600mm dia hp culvert atkm 1/850,2/700, 3/320, 4/100, 5/150 construction of u-shape draing at km 3/420 to 3/920, repair of pot holes patchwork between km 1/360 to 5/360 and construction of unlined drain remaining portion between km 1/360 to 5/360 onrestoration of rain damages on mohan ghatti to rada malan ghatgalu bhatwar road km 1/360 to 5/360,construction of retaining wall at km 0/460 to 0/480 and 1/105 to 1/125 and construction of 900 mm dia hume pipeculvert at km 2/160 on restoration of rain damages on raktal changehar bangota chakroad khaddar roadconstruction of retaining wall at km 2/775 to 2/785, 3/030 to 3/050, providing and laying 600mm dia hp culvert atkm 0/700, 1/320, 1/500, 1/650 and repair of pot holes patch work between km 0/00 to 1/700 and construction ofunlined drain between km 0/00 to 2/500 under pdna 2023) on restoration of rain damages on suja bhajrala roadkm 0/00 to 4/00, construction of retaining wall at km 0/510 to 0/520, 0/770 to 0/778 and 2/210 to 2/218 onrestoration of rain damages on ahju kholli tramat road km 0/00 to 2/500, construction of retaining wall at km0/240 to 0/248, providing and laying 600mm dia hp culvert at km 0/230, 1/650 and repair of pot holes patch workbetween km 0/00 to 1/700 and construction of unlined drain between km 1/00 to 2/500 on restoration of raindamages on ahju suja road km 0/00 to 4/00, construction of retaining wall at km 0/135 to 0/155, providing andlaying 600mm dia hp culvert at km 0/130,0/240,1/370,1/500 and construction of u-shape drain at km 0/00 to 0/200 onrestoration of rain damages on link road to vill sagnehar km 0/00 to 0/500, construction of retaining wall at km0/650 to 0/660 and 0/710 to 0/720 kharanja stone soling at km 0/150 to 0/190, interlocking paver block at km 0/055 to0/130, 0/150 to 0/190, 0/880 to 0/990, u-shape drain at km 0/00 to 0/600and repair of pot holes patch work betweenkm 0/00 to 1/000 on restoration of rain damages on suja sandral road km 0/0 to 1/000, construction of retainingwall at km 0/210 to 0/230, providing and laying 600mm dia hp culvert at km 0/700,1/320,1/500,1/650 and repair ofpot holes patch work between km 0/00 to 2/220 and construction of unlined drain between km 0/00 to 2/500 onrestoration of rain damages on chanjra badehar road km 0/00 to 2/500, construction of retaining wall at km 3/195to 3/205, providing and laying 600mm dia hp culvert at km 0/420,0/905, 1/800, 2/320, 2/800, 3/500 construction ofunlined drain at km 1/00 to 2/500, repair of pot holes patch work between km 2/030 to 3/000 on restoration of raindamages on bhatehar tramat road km 0/0 to 4/500, construction of retaining wal at km.0/680 to 0/730, 1/015 to1/045,1/285 to 1/300, providing & laying 600mm dia hp culvert at km.0/900, c/o u-shape drain at km.1/00 to 1/350,repair of pot holes patch work between km.0/00 to 0/990 on restoration of rain damages on sukabag swarka roadkm.0/0 to 1/800, repair of pot holes at km.0/00 to 1/770 and excavation of katcha drain at rd 0/190 to 1/650, 1/800 to2/100 & 2/340 to 2/300 on restoration of rain damages from ladruhin khalai km.0/0 to 3//00, providing and laying600mm dia hume pipe culvert at km 0/100,1/320,1/500 and 1/650, construction of u-shape drain at km 0/200 to 0/325and unlined drain at remaining portion between km 0/00 to 1/700 on restoration of rain damages on sukabag tostain road km 0/00 to 1/700, providing and laying interlocking paver block at km 0/00 to 0/220 on restoration of raindamages on link road to village nanidhar road km 0/00 to 2/785, construction of retaining wall at km 2/970 to2/980, providing and laying 600mm dia hp culvert at km 0/250,0/450,1/070,1/350,1/905,2/500 and repair of pot holespatch work between km 2/00 to 3/00 on restoration of rain damages on link road to vill chhancher km 0/00 to 3/00,construction of edge wall at km 0/610 to 0/625, 1/260 to 1/282 & cement concrete drain at rd 0/0 to 0/200 &am