Web Analytics Made Easy - StatCounter

Clear Water Pump Repair Tenders

Get complete information related to latest Clear Water Pump Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Clear Water Pump Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Clear Water Pump Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45067095 Due date: 22 May, 202622 May, 2026 NA
Tender For supply of sludge transfer pump with motor in wtp-2

corporations/Associations/Others

CTN :45058198 Due date: 15 May, 202615 May, 2026 4.54 Lacs
Tender For supply of submersible sludge pump with 10 mtr cable length, three phase with suitable control panel set , flex hose three layered synthetic application: sludge high quality flexible hose for discharge conne

Central Government/Public Sector

CTN :45036879 Due date: 21 May, 202621 May, 2026 NA
Tender For brc division:- hiring of diesel pump to drain out rain water/sludge/mud from surrounding area of various locations of limited height subway/ level crossing/ road under bridge/ railway colony/ railway station/ railway yard/shed etc under the jurisdiction of sr. den(n)brc.

CTN :45022049 Due date: 08 May, 202608 May, 2026 NA
Tender For design, construction, testing, commissioning of all the components of interception and diversion based sewage treatment plant (stp) work including 05 years of operation and maintenance of the entire system.• survey, investigation, design and construction of various diversion drains of inner size 0.50m(w) x 0.50m(h) for a length of 10m, 1.00m(w) x 1.20m(h) for a length of 10m and 1.00m(w) x 1.00m(h) for a length of 210m• survey, investigation, design and construction of coarse, medium screen, grit chambers of various sizes as detailed in scope of work for each wet well.• design and construction of 3 no. wet wells with overhead pump house as per the technical specification• survey, investigation, design, supply, laying, jointing and construction of rising main (di-k9 pipe) of inner dia. 150 mm for a length of 950m and dia. 100 mm for a length of 100m• stp (2 nos) - designing (aesthetically), providing, and constructing and giving satisfactory trials of sewage treatment plant consisting of receiving chamber, screen chamber, grit chamber, measuring flume, distribution chamber with primary and secondary treatment, etc. as per the technical specification of capacity 0.50 mld of facultative aeration lagoon convensional technology including allied units for waste disposal with all civil and mechanical, electrical works involved including administration cum laboratory building of minimum carpet area of 800 sqft. complete with all electrical works.• design and construction of planted drying bed for co-treatment of faecal sludge - 4 nos. of size l- 5.00 x w- 2.00 x height as per design + free board 0.30)• boundary wall around entire stp area, internal and external electrification.• operation and maintenance (o&m) for the proposed works / entire sewerage system (proposed) for a period of 5 years after successful completion of trial run period or handing over whichever is later.

Central Government/Public Sector

CTN :44994940 Due date: 19 May, 202619 May, 2026 NA
Tender For 1)hiring of sludge diesel pump(32hp) for baling out of rainwater from various lhs/lc's under den/n/pa. aden/s/lnl lc no - 42 (02 nos each) = 02 nos pump, 53 & 47 (01 no each) = 02 nos pump). aden/m/pa lc no - 15 & 16 (2 nos each)= 04 nos, 12,13,14 &17 (1 no each)= 04 nos., dehr yard = 02 nos, aden (m) pa - pune yard = 03 nos and 02 no of pump for both multi utility vehicle under aden-s-lnl and aden-m-pa=04 total - 21 pumps 2)hiring of electric submersible pump (50 hp) for bailing out of rainwater from various lhs/lc's under den/n/pa. aden/s/lnl lc no - 42 (01 nos each) = 01 nos pump). 3)hiring and operating multi-utility vehicle of loading capacity one mt 01 no. for aden-s-lnl and 01 no. for aden-m-pa

State Government

CTN :44955941 Due date: 30 Apr, 202630 Apr, 2026 NA
Tender For work contract (as & when) for cleaning /ash removing from etp-i&ii, phase-ii, awr sump, sludge pit, hp raw water tank & booster pump drain pit along with transportation to ash bund area at ntps, eklahare.

State Government

CTN :44942900 Due date: 27 Apr, 202627 Apr, 2026 NA
Tender For restoration of rain damages of sewerage scheme to kunihar area in tehsil arki district solan hp sh_replacement of control panel and sewage pump set of 3hp with coupled motor under deposit head ud fecal sludge and management fsm 1st call

CTN :44911281 Due date: 29 Apr, 202629 Apr, 2026 NA
Tender For septic tank desludging using vacuum pump, carting away sludge & carting away debris at jaipur lpg plant

CTN :44894082 Due date: 25 Apr, 202625 Apr, 2026 NA
Tender For supply of pump submersi 15-1 water 3.7 300-400lp 1600451857 , pump submersi 20m sludge 7.5 750-1000l-1600451856 , pump submersi 15-1 slurry 7.5 700-1600l 1600451854 , pump submersi 40m water 18.1400-1700 1600451859

CTN :44891328 Due date: 30 Apr, 202630 Apr, 2026 NA
Tender For miscellaneous works in thermal-2 - miscellaneous works in thermal-2, the work shall be carried out on a manday basis and includes collection, segregation, and shifting of metallic and non-metallic waste materials from the thermal-2 building premises. the activities cover handling of rusted metallic items, structural scrap, insulation materials, oil sludge/oil slick, mud, debris, and other miscellaneous scrap lying at various locations such as the ground floor near boiler area, pipe rack area, tg floor area, cooling tower area, and other surrounding premises. the work also includes bringing down waste materials from different floors of boiler units 1, 2, and 3 to ground level and consolidating them at a designated location. all manpower, tools, tackles, and equipment shall be provided by the contractor. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., the work shall be executed on a manday basis and includes loading and unloading of segregated metallic and non-metallic scrap/waste materials within the fact ud / petro plant premises as directed by the engineer-in-charge. all required manpower, tools, tackles, and handling equipment including concrete lump breakers shall be arranged by the contractor. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., transportation of scrap and waste materials loaded under sl. no. 2 from cpp - pd premises to the designated scrap yard, waste dumping area, or any other location within the fact ud / petro plant premises, as directed by the engineer-in-charge. the contractor shall provide a suitable truck having carrying capacity up to 2 tonnes for the purpose.the rate per trip shall be inclusive of all charges such as vehicle hire, driver wages, fuel, and any other incidental expenses.copies of the relevant scrap dispatch advice and weighbridge report shall be submitted by the contractor for each lot of material transported. the quantity indicated is tentative and payment shall be made based on actual number of trips certified by the engineer-in-charge., the work shall be performed on a manday basis and includes moving and rearranging used materials and equipment parts such as valves, pumps, flanges, motors, radiators, drums, welding sets, structural items, roof sheets, and other related materials stacked at various locations including cpp building north and south entrance areas, boiler feed pump area, tg floor area, and other specified locations, as instructed by the engineer-in-charge. required cleaning materials, rigging materials, tools, tackles, and manpower shall be arranged by the contractor. the eot crane at the tg floor may be used free of cost, subject to availability. loading and unloading for shifting within the petro plant premises shall be in the contractor s scope. payment shall be made based on actual mandays engaged and certified by the engineer-in-charge., the work shall be carried out on a manday basis and includes removal of vegetation from the outer side walls and top platforms of cooling tower cells, removal of vegetation from the side walls and floor of the cooling tower pond, and removal of accumulated mud, slurry, and other unwanted materials within the cpp cooling tower area. all manpower, tools, tackles, and equipment required for execution shall be arranged by the contractor. cleaning of all four cooling tower cells shall be treated as a single activity., the work shall be executed on a manday basis and includes thorough cleaning of the furnace oil (fo) pump house area. furnace oil spillage on floors, including areas beneath oil heaters, around pumps, condensate drains, and adjoining areas, shall be removed by spreading sawdust and collecting the oil-soaked sawdust for proper disposal as instructed by the engineer-in-charge. sawdust, cotton waste, manpower, tools, and all other materials required for complete execution of the work shall be arranged by the contractor. payment shall
 Loading, Please wait...

Connect us via What's Up