Web Analytics Made Easy - StatCounter

Clearing Forwarding Services Tenders

Get complete information related to latest Clearing Forwarding Services Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Clearing Forwarding Services Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Clearing Forwarding Services Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40739815 Due date: 16 Jul, 202516 Jul, 2025 NA
Tender For corrigendum : providing of handling and transport on lumpsum basis - appointment of handling contractor at slag storage yard 2 in vsp visakhapatnam for excavation pooling stacking crushing and despatch of bfg slag by rail and road

State Government

CTN :40956511 Due date: 14 Jul, 202514 Jul, 2025 16
Tender For appointment handling and transport contractor for 05 centres

CTN :40925991 Due date: 23 Jul, 202523 Jul, 2025 NA
Tender For handling and transport contractor and fixation of rate of foodgrains under nfsa 2013 in 2 tier system in both the district of karbi anglong and west karbi anglong for the year 2025-26.

Central Government/Public Sector

CTN :40064309 Due date: 05 Jul, 202505 Jul, 2025 NA
Tender For bid to ras corrigendum : providing of handling and transport on lumpsum basis - appointment of handling contractor at visakhapatnam for handling of steel materials at central despatch yard (cdy),rinl,visakhapatnam steel plant

CTN :40901121 Due date: 19 Jul, 202519 Jul, 2025 NA
Tender For handling and transport contractor and fixation of rate for foodgrains i.e. nfsa rice in 2 tier system under biswanath district for the year 2025-26

State Government

CTN :40872248 Due date: 12 Jul, 202512 Jul, 2025 32.78 Lacs
Tender For routine monitoring/preventive maintenance/breakdown/ emergency/regular servicing of pneumatic cylinders,solenoid valves,limit switches & pressures switches pertains to units-5,6&7 mill reject handling system(mrhs).2.operation and maintenance of dense phase mill reject handling system of unit-8.the work involves a) operation and maintenance of dpmrhs plc system. b) i&c maintenance works of air compressor.c) servicing/recalibration of solenoid valves,limit/proximity switches & pressures switches etc.3.routine monitoring/maintenance of spm analyzer systems pertains to unit-5 to 8.the work involves a)cleaning/servicing of transmitters & reflector units and blower filters of spm analyzers, pertains to units- 5 to 8.b)carrying out maintenance works under the supervision of i&c engineer. regular monitoring/checking healthiness of unit-7&8 coal bunker level monitoring systems.4.routine maintenance of bunker level monitoring systems.the work involves a)cleaning/checking of 3d level sensors.b)cleaning/checking healthiness of local control panel at bunker floor.c)ensuring healthiness of signals to control room pc,dcs&chp control room digital indicators.5.regular monitoring/maintenance of hfo tanks level measurement systems.the work involves a)cleaning/checking healthiness of radar level transmitters installed at hfo tanks.b)cleaning/checking healthiness of local digital indicators installed at foph.c)cleaning/checking healthiness of plc unit installed at ucb-7.6.the nature of work is round the clock maintenance.7.the cleaning/servicing and maintenance works of all the above mentioned systems shall be carried out during units aoh period.8.the required t&p and ppe for carrying out maintenance works shall be arranged by the contractor/agency itself.

Central Government / Public Sector

CTN :40685457 Due date: 03 Jul, 202503 Jul, 2025 24.49 Lacs
Tender For corrigendum : custom bid for services - rpnc252027 support service for swing extruder vfd installation-shifting, foundation and installation of power transformer- 1. the power transformer is to be installed by construction of new transformer foundation, dismantling/modification of surface, providing chain link fencing on all other 4 sides, cleaning and refurbishment of bay area is in the scope of contractor only. all necessary manpower, tools & tackles, shifting machinery like hydra/crane etc shall be in the scope of contractor only. 2. shifting of power transformer of 7.2 mva onan from store to site, loading-unloading, erection, site storage are in scope of contractor. 3. the basic data sheet and ga drawing of the proposed transformer is attached in scope only. 4. the bidder if required must construct bay width, height and fire walls as per relevant is/iec/oisd standards and site conditions such that adequate clearances for maintenance shall be maintained. bidder to submit the plot plan of equipment layout of transformer layout along with the bid. the bidder shall carryout the site visit for assessment of the available installation space. the total length of the transformer bay should be such that the radiator can be accommodated on either side of transformer tank in the specified bay width. 5. all necessary earth pit provisions, & fire barriers/wall modifications, provision of new hvws water sprinklerbased firefighting system having suitable capacity for protection against the fire & explosion as per the design of supplied transformer and applicable standards & direction of eic. provision of all necessary fire protection system for transformers shall be in the scope of lstk contractor. 6. construction of oil drain facility of transformer as per is standard and hookup with existing burn oil pit. 7. the erection to be certified by contractor as per its recommended procedures which is to be submitted prior to erection. qap for erection and site commissioning shall also to be endorsed by contractor. 8. all kind of lifting, rigging work for loading-unloading, erection work including supply of hydra/ cranes, lifting rigging materials, manpower, tools and tackles as required are in scope of contractor. 9. all kind of skilled, semi-skilled, unskilled manpower as per itc of transformer requirement will be in the scope of contractor. 10. erection includes entire vacuum by proper capacity of vacuum pump, for not less than 48 hours, or more if required as per the instruction of engineer in charge. 11. first filling up of the transformer oil at site, its filtration, site testing oil sample, any refiltration required during final commissioning shall be in the scope of contractor including all tools, tackles and including oil filtration machines. oil may be supplied in drums, which should be properly sealed during transportation and storage. seal shall be verified and opened in front of iocl representative before filling in transformer. contractor should have enough storage capacity for handling oil. filling the oil from drums to the transformer through suitable capacity of high-quality filter machine and filtration of the same to get desired bdv &ppm as specified by engineer in charge and transformer manual. 12. contractor must replace all the gaskets by new ones if required by engineer in charge. 13. the contractor shall arrange nitrogen cylinder required at site for above work. 14. contractor must repaint the transformer tank with two coats of anti-rusting good finish ltbs grey shade 631 of is:5 by spray painting if required and as per the direction of engineer in charge..

State Government

CTN :40842500 Due date: 16 Jul, 202516 Jul, 2025 1.70 Crore
Tender For providing of handling ,transport and other mining services - percentage quote based - handling service, transport service, handling & transport service, handling only contractor at fsd bhawanimandi

State Government

CTN :40842566 Due date: 16 Jul, 202516 Jul, 2025 55.98 Lacs
Tender For providing of handling ,transport and other mining services - percentage quote based - handling service, transport service, handling & transport service, handling only contractor at pws nadbai under revenue district, bharatpur

CTN :40794305 Due date: 05 Jul, 202505 Jul, 2025 NA
Tender For providing of handling and transport on lumpsum basis - handling and transport on lumpsum basis- tendre for labour contractor spp banda processing grading packing tagging loading unloading etc work
 Loading, Please wait...

Connect us via What's Up