Tender For construction of school compound in ankalagi villge - tools and plants 2 per on material aheri d, transportation loading and unloading per on material aheri d, stone at quarry aheri d, the cost of all materials, centering, transportation, fixing, wastage and other extra charges etc, excluding the cost of unskilled labour aheri d, add for scaffolding 5 per cent of cost of labour and material aheri d, add watering charges at 1 per on materialaheri d, add sundries charges at 1 per on materialaheri d, miscellaneous unforeseen charges which are necessary during execution aheri d, mixer concrete 1 cum capacity aheri d, mixer concrete small used in culvert aheri d, hom of welding and grinding machine aheri d, hom of cutting and grinding machine 1 aheri d, welder grade i aheri d, mechanic class ii/mechanic hmp grade i eme grade aheri d, laboratory asst. sslc passed mate supervisor aheri d, cast iron spike aheri d, broken stone aggregate 40 mm size aheri d, broken stone aggregate 20 mm size aheri d, broken stone aggregate 12 mm to 10 mm size aheri d, bond stone 20 x 20 x 45 cm aheri d, ball bearing hinges heavy duty aheri d, hollow pipe 50 mm aheri d, plate 40 x 6 mm aheri d, plate 36 x 6 mm aheri d, square rod 16 mm aheri d, worksite facilities creche drinking water first aid aheri d, gst aheri d, conveyance aheri d, miscellaneous contingencies charges aheri d, coarse sand zone iii aheri d, anticorrosive bituminous paint aheri d, portland cement aheri d
Tender For corrigendum : supply of digital radiography system type c (qty:10) - digital radiography system 50kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the
Tender For corrigendum : supply of digital radiography system type b (qty:10) - digital radiography system 80kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the