Tender For annual maintenance contract for work of availing comprehensive technical services for hydraulic system at coalhandling plant, unit#8&9, cstps, chandrapur for 2 years
Tender For bid to ras corrigendum : providing of custom bid for services - biennial maintenance contract bmc for operation maintenance of 2 nos of shore unloaders of coalhandling system at 2 x 500 mw thermal power station tuticorin for a period of two years 2025 to 27
Tender For supply, installation, testing and commissioning of direct low pressure clean agent automatic fire detection and suppression system for 02 nos of sub stations (ss3 and ss4) at mechanised coalhandling plant
Tender For tender for supply of operation of water cooled centralised ac plant of 3x330 tr trane make and all associated ancillary equipments and ventilation fans etc. round the clock in 3 shifts on all days iincluding sundays and holidays by deputing supervisor , shift in-charge or skilled , semi skilled manpower etc. complete as required and as per enclosed detailed specifications. for first year , operation of water cooled centralised ac plant of 3x330 tr trane make and all associated ancillary equipments and ventilation fans etc. round the clock in 3 shifts on all days including sundays and holidays by deputing supervisor , shift in-charge or skilled , semi skilled manpower etc. complete as required and as per enclosed detailed specifications.for second year , comprehensive maintenance contract for the centralized air-conditioning system consists of 330tr water cooled chiller units (trane make)-03 nos. , chilled water pumps primary pumps (kirlosakar make)-3 nos. and secondary pump (grundfoss make)- 3 nos. with vfd drive panel , condenser water pumps (crompton make) - 3 nos. , cooling towers (advance make)-3 nos. , chilled water and condenser water lines , air handling units (floor mounted and ceiling suspended) (zeco make) with starter panels - 27 nos. power and control panels and its associated equipments like bearings , v-belts , canvas , valves (excluding the butterfly valves) , strainers , dampers , diffusers , grills , nozzles , thermostats , switchgears in control panels(excluding the power cables) , ventialation fans of toilets , electrical meters , contactors , timers etc. complete as required for smooth operation of the complete hvac system. the scope of work also includes carrying out the periodical maintenance/checking of the above equipments & maintenance of water softening plants along with supply of salt for operation as per manufacturers recommendations and/or as per the attached technical conditions. for first year , comprehensive maintenance contract for the centralized air-conditioning system consists of 330tr water cooled chiller units (trane make)-03 nos. , chilled water pumps primary pumps (kirlosakar make)-3 nos. and secondary pump (grundfoss make)- 3 nos. with vfd drive panel , condenser water pumps (crompton make) - 3 nos. , cooling towers (advance make)-3 nos. , chilled water and condenser water lines , air handling units (floor mounted and ceiling suspended) (zeco make) with starter panels - 27 nos. power and control panels and its associated equipments like bearings , v-belts , canvas , valves (excluding the butterfly valves) , strainers , dampers , diffusers , grills , nozzles , thermostats , switchgears in control panels(excluding the power cables) , ventialation fans of toilets , electrical meters , contactors , timers etc. complete as required for smooth operation of the complete hvac system. the scope of work also includes carrying out the periodical maintenance/checking of the above equipments & maintenance of water softening plants along with supply of salt for operation as per manufacturers recommendations and/or as per the attached technical conditions. for second year , painting of hvac system such as pumps , cooling tower- motors , pedastal and other equipments by removal of corrosion with sand paper and painting with corrosion resistant paint to match the adjoining areas for maintaining the equipment in good and non rusting condition. for first year , painting of hvac system such as pumps , cooling tower- motors , pedastal and other equipments by removal of corrosion with sand paper and painting with corrosion resistant paint to match the adjoining areas for maintaining the equipment in good and non rusting condition. for second year , repairing damaged insulation of exposed ac ducts by scrapping and cleaning the surface , applying cold bitumin or adhesives , supplying and fixing of 50mm thick thermo coal sheet (eps) and wraped canvas clothes with suitable self adhesive as per the specif