Web Analytics Made Easy - StatCounter

Coal Handling System Repair Tenders

Get complete information related to latest Coal Handling System Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Coal Handling System Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Coal Handling System Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :40952542 Due date: 21 Jul, 202521 Jul, 2025 NA
Tender For replacement of damaged rubber lagging sheet of pulleys of conveyor belt system of coal handling plant, ggsstp, rupnagar

State Government

CTN :40625329 Due date: 19 Jul, 202519 Jul, 2025 15.22 Lacs
Tender For corrigendum : work of various maintenance of drive system of conveyor belt of coal handling plant wtps on as and when required basis.

State Government

CTN :40913157 Due date: 16 Jul, 202516 Jul, 2025 42.25 Lacs
Tender For supply, erection and commissioning of high mast lighting tower system at coal handling plant-2 old stacker/reclaimer coal stockyard & wagon tippler railway yard area at ukai tps.(et- 6022 fuel)

State Government

CTN :40891396 Due date: 18 Jul, 202518 Jul, 2025 NA
Tender For work of availing comprehensive technical services for hydraulic system at coal handling plant 3x660 mw ktps

State Government

CTN :40872248 Due date: 12 Jul, 202512 Jul, 2025 32.78 Lacs
Tender For routine monitoring/preventive maintenance/breakdown/ emergency/regular servicing of pneumatic cylinders,solenoid valves,limit switches & pressures switches pertains to units-5,6&7 mill reject handling system(mrhs).2.operation and maintenance of dense phase mill reject handling system of unit-8.the work involves a) operation and maintenance of dpmrhs plc system. b) i&c maintenance works of air compressor.c) servicing/recalibration of solenoid valves,limit/proximity switches & pressures switches etc.3.routine monitoring/maintenance of spm analyzer systems pertains to unit-5 to 8.the work involves a)cleaning/servicing of transmitters & reflector units and blower filters of spm analyzers, pertains to units- 5 to 8.b)carrying out maintenance works under the supervision of i&c engineer. regular monitoring/checking healthiness of unit-7&8 coal bunker level monitoring systems.4.routine maintenance of bunker level monitoring systems.the work involves a)cleaning/checking of 3d level sensors.b)cleaning/checking healthiness of local control panel at bunker floor.c)ensuring healthiness of signals to control room pc,dcs&chp control room digital indicators.5.regular monitoring/maintenance of hfo tanks level measurement systems.the work involves a)cleaning/checking healthiness of radar level transmitters installed at hfo tanks.b)cleaning/checking healthiness of local digital indicators installed at foph.c)cleaning/checking healthiness of plc unit installed at ucb-7.6.the nature of work is round the clock maintenance.7.the cleaning/servicing and maintenance works of all the above mentioned systems shall be carried out during units aoh period.8.the required t&p and ppe for carrying out maintenance works shall be arranged by the contractor/agency itself.
 Loading, Please wait...

Connect us via What's Up