Web Analytics Made Easy - StatCounter

Coke Drum Tenders

Get complete information related to latest Coke Drum Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Coke Drum Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Coke Drum Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :40159192 Due date: 03 Jun, 202503 Jun, 2025 NA
Tender For corrigendum : supply of procurement of skin thermocouples for coke drum a&b at bpcl, bina refinery

Central Government / Public Sector

CTN :40092162 Due date: 02 Jun, 202502 Jun, 2025 14.69 Crore
Tender For corrigendum : providing of custom bid for services - rprc251117 agency for repair of coke drum 78 r 101 78 r 102 78 r 103 and 78 r 104 bulged portion and skirt in dcu at panipat refinery

Central Government / Public Sector

CTN :40383482 Due date: 31 May, 202531 May, 2025 83.26 Lacs
Tender For providing of custom bid for services - pdm1b25036 agency for coke drum chute repairing restoration jobs of dcu at iocl paradip refinery odisha

State Government

CTN :40277992 Due date: 20 May, 202520 May, 2025 NA
Tender For annual rate: 2025-26 rates of supplying, stacking bituminious materials and labour work on various roads of vyara and dolvan taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accord

State Government

CTN :40277995 Due date: 20 May, 202520 May, 2025 NA
Tender For annual rate : 2025-26 rates of supplying , stacking bituminious materials and labour work on various roads of uchchhal taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance w

State Government

CTN :40277999 Due date: 20 May, 202520 May, 2025 NA
Tender For annual rate : 2025-26 rates of supplying, stacking bituminous materials and labour work on various roads of valod taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with t

Central Government / Public Sector

CTN :40291571 Due date: 30 May, 202530 May, 2025 NA
Tender For supply of high pressure decoking hose for drilling and cutting of coke in coke drum.

CTN :40158829 Due date: 19 May, 202519 May, 2025 NA
Tender For supply of procurement of temperature transmitters for coke drum a & b at bpcl, bina refinery
 Loading, Please wait...

Connect us via What's Up