Tender For medium velocity water spray - supply of above ground pipes including transportation dn 6inch is 1239thk.heavy 5.4mm, supply of above ground pipes including transportation dn 4inchis 1239thk.heavy 5.4mm, fabrication erection installation painting and testing of above groundpipes dn6 inch is 1239 thk.heavy 5.4mm, fabrication erection installation painting and testing of above ground pipes dn4 inch is 1239 thk.heavy 5.4mm, remote operated valve rov as per details below design engineering supply erection fabrication testing and commissioning of remote operated valve rov assembly.pl refer atc document for details., remote operated valve rov as per details below design engineering supply erection fabrication testing and commissioning of remote operated valve rov assembly.pl refer atc document for details., gate valves as per details below complete work of supply installation testing and commissioning of valves. pl refer atc document for details., gate valves as per details below complete work of supply installation testing and commissioning of valves with spiral wound graphite .pl refer atc document for details., y t type strainer as per details below complete work of supply installation testing and commissioning of y t type strainer .pl refer atc document for details., y t type strainer as per details below complete work of supply installation testing and commissioning of y t type strainer pl refer atc document for details., spray nozzles supplying and installation of medium velocity fixed water spray nozzles along with matching reducing tee to connect with water spray ring.pl refer atc document for details., quartzoid bulb detectors supply installation testing and commissioning of quartzoid bulb detector.pl refer atc document for details., supply erection testing commissioning of medium velocity water spray system pl read atc docuemntr for complete details , supply erection testing commissioning of medium velocity water spray system pl read atc docuemntr for complete details , supply erection testing commissioning of medium velocity water spray system.pl refer atc document for details., supply of flanges complete work including supply and erection of flanges of respective sizes including all taxes duties transportation and inspection charges.pl refer atc document for details., supply of flanges complete work including supply and erection of flanges of respective sizes including all taxes duties transportation and inspection charges.pl refer atc document for details., supply of 1.5 d 90 degree bw elbow material as per pipe size 6 inch, supply of 1.5 d 90 degree bw elbow material as per pipe size 4 inch, supply of bw equal tees material as per pipe size 6 inch, supply of bw equal tees material as per pipe size 4 inch, excavation upto 1.50m earth work in excavation by mechanical means hydraulic excavator pl refer atc document for details., excavation beyond 1.50m excavation work by mechanical means hydraulic excavatoror manual means in foundation trenches or drains for depth beyond 1.5 m.pl refer atc document for details., carriage or disposal carriageordisposal of materials by mechanical transport loading unloading and staking excavated all type of ordinary rock soil and dismantled concrete material any lead within plant premises area, back filling backfilling available excavated earth excluding rock in trenches plinth sides of foundations etc. in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering lead up to 50 m and lift upto 3 m., demolishing rrc demolishing r.c.c. work floor pavement or foundations or pedestal or slab etc.pl refer atc document for details., demolishing stone or brick masonary demolishing stone rubble masonry or brick masonry or plain cement concrete work manuallyor by mechanical means. pl refer atc document for details., pcc 148 providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level.
Tender For construction of equipment room at nrl rt - civil, structural & architectural, earth work in excavation (refer specification no. c-spc-103), earth work in excavation below ground level for all kinds of works in all types of soils except soft rock and hard rock as classified in specification for a depth upto 1.5m including removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, levelling, grading and ramming of bottoms, dewatering of accumulated water from any source and keeping the surface dry for subsequent works and disposal or stacking of excavated material within a lead of 100m, as directed including providing temporary supports to existing service lines like water pipes, sewage pipes, electric overhead and underground cables etc. all complete, but excluding shoring and strutting., for depth beyond 1.5m and upto & inclusive of 3.0m., earthwork in filling by excavating the earth from borrow areas arranged by contractor for all leads, transporting the earth from borrow area including cleaning & stripping the earth at borrow areas, breaking clods, loading, unloading and laying at all depths and heights in layers of thickness not exceeding 15 cms., watering, rolling and ramming by manual methods/mechanical compactors to achieve 90% of the maximum laboratory dry density, dressing, trimming, levelling the top surface etc. in foundations, plinths, trenches etc. all complete., backfilling after execution of the work to proper grade and level with selected materials from available excavated soil from spoil heaps, including re-excavating the deposited soil excavated earlier, breaking clods, laying at all depths and heights in layers of thickness not exceeding 15 cms. watering, rolling and ramming by manual methods/ mechanical compactors to achieve 90% laboratory maximum dry density, dressing, trimming etc. in foundations, plinths, trenches, pits etc. all complete., transporting and disposing the surplus earth and debris including shrubs and vegetations from construction area to areas anywhere outside the plant boundary including re-excavating the deposited soil excavated earlier, transportation, loading, unloading, laying at all depths and heights, stacking, levelling and dressing both the area (viz. from where the earth is transported and where it is deposited) to required levels and slopes complete with all lifts as directed. for carting on the basis of truck measurements (volume of truck reduced by 30% for voids) disposal area s outside plant boundary to be arranged by the contractor .royalty as applicable for disposal outside plant limits to be borne by the contractor., plain & reinforced cement concrete (refer specification no. c-spc-104), providing and laying plain cement concrete for all depths below and upto plinth level in foundations,drains, fillings, non-suspended floors, pavements & ramps or any other works etc. including shuttering, tamping, ramming, vibrating, curing etc. all as specified in any shape, position, thickness and finishing the top surface rough or smooth as specified and directed all complete for concrete of nominal mix 1:5:10 by mass (1 cement: 5 coarse sand: 10 crushed stone aggregates/gravels) with 40mm and down size graded crushed stone aggaregates/gravels.(all materials including cement supplied by contractor at their cost), providing and laying reinforced cement concrete of m-30 grade with 20mm and down size graded crushed stone aggregates/gravel in sub-structure of all types e.g. foundations, footings, raft, beams, slabs, pile caps, retaining walls, jambs, counterforts, buttresses, trenches, manholes,pipe encasement, catchpits, drains, rcc pits, equipment/machine foundations, pedestals, pipe sleepers, columns, plinth beams, suspended floors, beams, staircases, landings, steps, brackets etc. (including single pour concreting upto 250m3), including cost of admixtures if used,providing pockets, openings, recesses, chamfering etc., wherever required, vibrati
Tender For providing of handling and transport on lumpsum basis - engagement of an agency for excavation, collection, heaping, loading, and transportation of mineral sand from pandarathuruthu to irel (india) ltd, chavara plant - 60000 t,handling and transport on lumpsum basis - mechanical loading, transportation and leveling of tailings sand from irel chavara plant to the excavated pits at pandarathuruthu 60000 t
Tender For loading and transportation of mineral sand from pandarathuruthu to irel (india) limited, chavara plant and mechanical loading, transportation and levelling of tailings sand from irel chavara
Tender For composite tender for earth work in filling, cutting, mechanical compaction, turfing, provision of blanketing, construction of minor bridges and station building(at jasia) and rail level platform(at jasia) & linking of bg track; turnouts, provision of glued joints; sejs, dismantling of existing track; turnouts, handling, lifting, loading, leading, unloading and spreading of ballast, handling of p. way material working in bni/ni period and other allied works in c/w "provision of longer loop on both up/dn direction at nangloi station yard at km.17/19 on delhi-bhatinda section" and "rohtak-panipat:-provision of new crossing station at jasia between rok-ghna section"