Get complete information related to latest Combustion Bomb Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Combustion Bomb Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Combustion Bomb Tenders.
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; installation of permanent piping system for resin removal and loading from sssb water purification ion exchange column for remote handling of resin in fue..
Tender For installation of permanent piping system for resin removal and loading from sssb water purification ion-exchange column for remote handling of resin in fuel building of pfbr
Tender For corrigendum : supply of steam water analysis system main spares and e and c c c - ph sensor , ph transmitter 4 to 20ma hart , specific conductivity sensor , specific conductivity transmitter 4 to 20ma hart , cat ion conductivity sensor with 1 cat ion exchange column , cat ion conductivity transmitter 4 to 20ma hart , do2 sensor , do2 transmitter 4 to 20ma hart , silica analyzer transmitter 4 to 20ma multi channel , sodium analyzer transmitter 4 to 20ma multi channel , conductivity analyzer -online retractable type , sample handling system for main steam superheated , sample handling system for main steam saturated , sample handling system for drum water , sample handling system for hp feed water economizer inlet , sample handling system for deae ol fw , sample handling system for condensate cep outlet inlet cooling wtr , sample handling system for dm water , redundant chiller units 1 working 1 standby , shelf life items required at the time of commissioning , shelf life items required after commissioning in 1st lot , shelf life items required after commissioning in 2nd lot , training as per cl 14 of 6 mandays at manufacture works and 6 mandays at site , mandatory spares as per tech specs , supervision of e and c services charges at site , supervision of e and c visit charges
Tender For corrigendum : supply of steam water analysis system main spares and e and c - ph sensor , ph transmitter 4 to 20ma hart , specific conductivity sensor , specific conductivity transmitter 4 to 20ma hart , cat ion conductivity sensor with 1 cat ion exchange column , cat ion conductivity transmitter 4 to 20ma hart , do2 sensor , do2 transmitter 4 to 20ma hart material code , silica analyzer transmitter 4 to 20ma multi channel , sodium analyzer transmitter 4 to 20ma multi channel , hc analyzer 4 to 20ma , sample handling system for main steam superheated , sample handling system for drum water , sample handling system for hp feed water economizer inlet , sample handling system for deae ol fw , sample handling system for dm water , sample handling system for condensate blow down line , sample coolers , redundant chiller units 1 working 1 standby , shelf life items required at the time of commissioning , shelf life items required after commissioning in 1st lot , shelf life items required after commissioning in 2nd lot , training as per cl 14 of 2 mandays for 6 nos at site , supervision of e and c services charges at site , supervision of e and c visit charges , mandatory spares as per tech specs
Tender For chemicals required ion exchange column styrene resin-lewalt s6368a-lanxess - lewatit s6368a-lanxess ion exchange column styrene resin -lewatit s6368a-lanxess. general description:- ionic form as shipped-cl functional group-quaternary amne, ty matrix-cross linked polystyrene structure-macro porous appearance-beige, opaque physical and chemical properties a) unifornity coefficient max.1.1 b)mean bead size-0.62 mm(+/-0.55) c)bulk density 640gm/l(+/-5%) d) density approx. g/ml- 1.06 e) water retention wt%- 60-65 f) total capacity- min. eq/l -1.0 g) volume charge cl--> oh max. vol%20 h) stability at ph range 0-14 i) storability of the product max. year -2 j)storability temp. range -20-40 dig. c k) operating temp max. -70(oh) 85(cl) c c 1) operating ph range-0-12 m)bed depth min -800mm n)specific pressure drop at viscosity impa*s- approx kpa* h/m2-0.8 o) pressure drop max kpa-300 p) linear velocity backwash (20 dig.c) approx m/h-4-5 replace the resin of column for season 2026-27