Web Analytics Made Easy - StatCounter

Concrete Structure Work Tenders

Get complete information related to latest Concrete Structure Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Concrete Structure Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Concrete Structure Work Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :40885491 Due date: 14 Jul, 202514 Jul, 2025 3.85 Lacs
Tender For providing rcc stair case in girls hostel at coh, parvathipuram, parvathipuram manyam district.

corporations/Associations/Others

CTN :40874583 Due date: 15 Jul, 202515 Jul, 2025 12.00 Lacs
Tender For yearly rate contract for various items of construction and supply for ranavav, dist. porbanadar (year 25-26) (third attempt) - excavation for foundation upto 1.5m depth including sorting out and stacking of useful materials and disposing of the excavated stuff all lead all steta, excavation for foundation depth from 1.5 mt. to 3.00 mt. depth including sorting out and stacking of useful materials and disposing of the excavated stuff all lead. all steta, providing and laying cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 machine cut stone aggregate 40mm nominal size ) and curring complete including cost of formwork in (a) foundation and plinth, providing and laying cement concrete 1:4:8 (1- cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete including cost of formwork in (a) foundation and plinth, providing and laying cement concrete 1:2:4 (1- cement : 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (a) foundation and plinth, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in (a) foundation footing base of column and mass concrete, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but exluding the cost of reinforcement for reinforced concrete work in beam (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in lintel (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in chhajja (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in column (d) columns, pillars posts and struts upto floor two level, providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but reinforcement for reinforced concrete work in slab (c) slabs, landings, shelves, balconies, lintel, beams, girders and cantilever upto floor two level., providing & laying controlled cement concrete m-250 and curing complete including the cost of formwork but excluding reinforcement for reinforced concrete work in wall (b) walls, from top of foundation level up to floor two level, providing & laying controlled cement concrete m-200 and curing complete including the cost of formwork but excluding reinforcement for reinforced concrete work in stair case (e) staircases excluding landing up to floor two level, providing and laying 1:2:4 (cement :2 course sand :4 crushed stone aggregate 20 nominal size) and curing complete including cost of form work in (a) wall caps/ copping, providing and laying reinforcement for r.c.c. work and bending, binding & placing in position completed upto floor two level thermo mechanical treated bars as per i.s.i (fe-415) major brand, providing tmt bar fe 500/500d reinforcement for r.c.c. work including bending, binding and placing in position complete upto floor two level major brand, extra for additional lift of reinforcing steel for all r.c.c. work above floor two level., extra for additional lift of concrete for all r.c.c. work above floor two level excluding cost of reinforcment, white stone bela mesonry block in course in superstructure with stone of approved quality in lime mortar 1:1.5 (1-lime putty : 1.5- finesand) incl

Central Government/Public Sector

CTN :40616660 Due date: 25 Jun, 202525 Jun, 2025 19.41 Lacs
Tender For carrying out fabrication and installation of ms grills in 300 bed hostel stair case windows and paver block works in hockey change room and covering the rcc drain covers to the storm water chambers in the campus at sai,nssc,bangalore
 Loading, Please wait...

Connect us via What's Up