Tender For supply of materials for development of a public cemetery and construction of a crematorium in tirthakunde village of khanapur taluka. - rubble stones.,, quarry spalls.,, broken stone aggregate 40 mm size,, broken stone aggregate 20 mm size,, broken stone aggregate 12 mm to 10 mm size,, coarse sand (zone iii),, portland cement,., mixer (concrete) - 1 cum capacity.,, silver oak, or equivalent planks 38 mm thick.,, jungle wood runners and plank.,, casurina poles 100 - 150 mm.,, ms flat,., bolts and nuts,, plasticizer / super plasticizer.,., hom of vibrator 0.71 days.,, solid concrete blocks (40x20x20cms) 4.00 n/sqmm, mixer (concrete small used in culvert.), granite / trap broken metal 100 mm and down size, base plate/ base plate, anchor bolts 750mm.,, corbon electrodes.,, welder grade i,, hom of welding and grinding machine.,, add-01, hom of cutting and grinding machine.,, ready mix primer paint (ready mix red lead paint).,, painter class i.,, enamel metal paint.,, unit cost as per the specification,, plastic emulision paint 01, tractor - 40 hp.,, gravel 2.36 mm/murrum,, laboratory asst. (sslc passed)/mate/supervisor,, wheeled dozer (d50 beml),., motor grader 3.35 meter blade.,, water tanker,, vibratory roller 8 tonne,., crushed stone course aggregate 53.,, granite metal 40 mm.,, granite metal 20 mm.,, rcc pipes np2 600mm dia including collars.,, mason class ii (with tools).,., mason class i (with tools).,.,, a 12x12xgauge g.i.wire 100 mtr at ts.800/per m, fitter class i-02, tmt bars including 5 per cent or overlaps and wastage, crane charges., ms angle iron 50mm x 50mm x 6mm, 33.8 metre in length at4.5 kg per metre, ms angle iron 40mm x 40mm x 6mm, 23 metre in length at 3.5 kg per metre,., tmt bars fe 500,., gusset plates 6 mm thick.
Tender For rrsmp/25-26 purnea/01 - pakka road to adiwasi tola, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, ro
Tender For rrsmp/25-26 purnea/02 - repair of road from jalalgarh railway gumti to mahiyarpur via chauhan tola, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wmm(wet mix macadam)providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause 406., prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per morth specification clause no. 508 complete in all respects., cement concrete/panel concrete pavementconstruction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approved grade cement @ 400 kg per cum, coarse and fine aggregate conforming to is 383 as per actual design mix, processing 28 days minimum compressive strength of 35 (thirty five) mpa and minimum flexural strength of 4.5 (four point five) mpa, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, constructi
Tender For rrsmp/25-26 purnea/04 - bishu baba sthan(hanuman mandir ) to adiasi tola karwa rahika, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the requ
Tender For rrsmp/25-26 purnea/06 - puran shah to farkiya hat (harijan tola), clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and
Tender For rrsmp/25-26 purnea/05 - fasia chowk to barhari sima ( seikh tola), clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., excavation in soil using hydraulic excavator and tippers with disposal upto 1000 mexcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3, construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technic
Tender For rrsmp/25-26 araria/11 - ghora chowk sindhiya to sidhiya south yadav tola, clearing and grubbing :- clearing and grubbing road land (by manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of e/i, construction of embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per technical specification clause 301.5 ., for 1000 m lead, construction of subgrade and earthen shoulders :- construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material(grade i) :- construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401., granular sub-base with well graded material(grade ii) :- construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401., water bound macadam gr iii :- providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., wet mix macadam (wmm) :- providing laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause 406., prime coat :- providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per technical specification clause 502., tack coat :- providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface tretaed with primer and clened with hydriloc broom as per technical specification aclouse 503., semi dense bituminous concrete :- providing and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth
Tender For rrsmp/25-26 araria/07 - pmgsy road jamuwa mandal chowk to mandal tola, clearing and grubbing :- clearing and grubbing road land (by manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of e/i, scarifying :- scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade and earthen shoulders :- construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material(grade ii) :- construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401., water bound macadam gr iii :- providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., wet mix macadam (wmm) :- providing laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause 406., prime coat :- providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per technical specification clause 502., tack coat :- providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface tretaed with primer and clened with hydriloc broom as per technical specification aclouse 503., semi dense bituminous concrete :- providing and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per morth specification clause no. 508 complete in all respects., pavement quality concrete (pqc) :- construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to is 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design
Tender For rrsmp/25-26 imamganj/02 - l072 l046 to sarkhoridih, clearing and grubbing road landclearing and grubbing road land ( by manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of e/i ( by manual means) in area of non-thorny jungle, scrarifying existing bituminous surface to a depth of 150 mm and disposal disposal of scrarified materials with a lift upto 3m and lead upto 1000m as per technical specification clause 301.4, construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m & 100 m as per technical specification clause 303.1. (including royality & labour cess)., gsb:-(grading ii material) construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401., wbm grading 3:-providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., wmm :- providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause 406., prime coat (low porosity) :- providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coat:- providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., semi-dense bituminous concrete :- providing and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per morth specification clause no. 508 complete in all respects., construction of dry lean concrete sub base over a prepared sub grade with coarse and fine aggregate conforming to is 383 , the size of coarse agg. not exceeding 25mm , agg. cememt ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1 , cement content not to be less than 150kg/cm, opc to be determined during
Tender For rrsmp/25-26 pakridayal/02 - bankatwa bandh to pakridayal tikha road, setting out pillars :- providing & fixing of working benchmark pillars 01 nos. per km & 04 nos. of reference pillars required for 1 km. as per drawings given and direction of e/i, clearing and grubbing road landclearing and grubbing road land ( by manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of e/i ( by manual means) in area of non-thorny jungle, cutting of trees including cutting of trunks, branches and removal of stumps cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per technical specification clause 201.7, girth above 300 mm to 600 mm, girth above 600 mm to 900 mm, removal of telephone/electric poles and lines removal of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per technical specification clause 202., construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m & 100 m as per technical specification clause 303.1. (including royality & labour cess)., granular sub-base with well graded material (table 400.1) :- construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. (for grading ii material), wmm :- providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400.11 & 400.12 and technical specification clause 406., construction of un-reinforced, plain cement concrete pavement (m35 grade) over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to is 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form paver, spread, compacted and finished in a continuous operation including provision of 0.5 x 0.5 panel, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing, laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kn as per technical specification clause 412, traffic signs, markings & other road appurtenances, kilometre stone, reinforced cement concrete m15 grade kilometre stone/local stone of standard