Web Analytics Made Easy - StatCounter

Control Arm Tenders

Get complete information related to latest Control Arm Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Control Arm Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Control Arm Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40627919 Due date: 18 Jun, 202518 Jun, 2025 NA
Tender For corrigendum : procurement for balluff make spares for ntpc simhadri -:position transmitter , position feedback transmitter , control arm ,

Central Government/Public Sector

CTN :40699674 Due date: 23 Jun, 202523 Jun, 2025 NA
Tender For supply of control arm assembly right consisting of 2 (two) items (i) control arm upper to fiat-sig schienenfahrzeuge ag's drg. no. 1277122, ver-01r1 or latest.qty-01 no. (ii) control arm lower ri ght to fiat-sig schienenfahrzeuge ag's drg. no.1267717, ver-001r or latest qty-01 no. technical specn.no.17.334. 100 06/107 01 with amdt no.1 of march 2005, mdts 166, rev-02 or latest, is-1865- 1991(ra-2020), sg 400/18l. [ warranty period: 30 months after the date of delivery ]

Central Government / Public Sector

CTN :40699443 Due date: 08 Jul, 202508 Jul, 2025 NA
Tender For supply of locking pin (threaded for control arm) to specification no. en1.6582,en100 83 part -1 to fiat drg no : 1227320 alt : ver.06 [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40699416 Due date: 23 Jun, 202523 Jun, 2025 NA
Tender For supply of parallelism checking tool no. 12.841.0502 for control arm of lhb coaches as per fiat drawin g no. 2841050270 attached. firms should submit the tc & gc along with material. the item will be supplie d with calibration certificate from nabl approved lab. [ warranty period: 30 months after the date of del ivery ]

Central Government / Public Sector

CTN :40682711 Due date: 03 Jul, 202503 Jul, 2025 NA
Tender For supply of lubricant for control arm for lhb fiat bogies as per rcf specification md44121 dated 19.04.2011 (para-1) in packing of 05 li ters (nabl approved lab certification to be provided conforming parameters as per rcf spec md44121) [ warranty period: 30 months aft er the date of delivery ]

CTN :40673358 Due date: 02 Jul, 202502 Jul, 2025 NA
Tender For tender for supply of mt crv 31 e e - wheel cyl assy , brake master cyl , brake shoe , eng mounting bracket , rear shocker , alternator , stablizer joint , brake pad , caliper pin , solenoid switch , by pass filter , drive axle assy , tie rod end , track control arm , front wheel brg , crank pulley , front brake booster , rear brake booster

CTN :40658975 Due date: 25 Jun, 202525 Jun, 2025 NA
Tender For supply of set of control arm assembly right consisting of two items. (1) control arm upper (finish ) to rcf drg. no.1277122, alt.- 01r3, qty 01 no. for fiat bogies to spec. no. mdts - 241 rev. 2. (2) c ontrol arm lower right to fiat-sig drg. no. 1267717, ver. 0r2, qty 01 no. for fiat bogies to spec. no. mdts - 241 rev. 2. [ warranty period: 30 months after the date of delivery ]

CTN :40658722 Due date: 16 Jun, 202516 Jun, 2025 NA
Tender For supply of security plate for control arm fitment in fiat bogie. as per rcf"s drg.no.1356 259 alt--05r specn: is: 6911-2017 ( reaffirmed 2022), grade x04cr19ni9, iss 304 s1. [ warranty p eriod: 30 months after the date of delivery ]

CTN :40661076 Due date: 20 Jun, 202520 Jun, 2025 NA
Tender For supply of set of control arms (finished) for lhb bogies as per set list no.-. mplgconfinl hb ,ver- 05 and mdts-241, rev-02 packing instruction - mcf spi-205 [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40659688 Due date: 16 Jun, 202516 Jun, 2025 NA
Tender For design, supply, installation, testing, commissioning and proving of press in and press out of bush and control arm silent block and backlash arrangement as per specifications attached. [ warranty p eriod: 24 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up