Get complete information related to latest Conveyor Belt Item Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Conveyor Belt Item Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Conveyor Belt Item Tenders.
Tender For btps - chp - removal of spilled over coal, fine dust and wet coal at head end area of bcn-1ab at tp-1 including fg floor, gallery area , mh-2, module-1 to 10 and tail end area at mh-1 including hgtu by head loads on to running conveyor from 01.04.2025 or from actual date of commencement of work to 31.07.2025.
Tender For identification of major section faults, replacing of defective parts in luminaries at railway marshalling yard lighting towers, conveyor galleries, various locations connected to the conveyor gallery area and the stacker/reclaimers area in em/chp/drnttps during the year 2025-26 as when required
Tender For btps - chp - removal of spilled over coal, fine dust and wet coal at bcn-3ab tunnel, fg floor at tp-2, ground portal, gallery and head end areas and contingency-1,2 area of 3ab including fg floors and reclaim beltconveyors and reclaim chain feeders by head loads on to running conveyor for the period from 01.04.2025 or from actual date of commencement of work to 31.07.2025
Tender For custom bid for services - annual contract for packing plant operation-complete operation of packing plant section for smooth despatch of cement bags by truck and rakes-the contractor shall be responsible for the continuous operation of the packing plant activities deploying adequate manpower as under a) unloading and proper stacking of empty hdpe/pp bags at any time with the receipt of empty bag vehicles. b) branding viz. week, month, mrp on empty bags and other related stamping as required including preparation of stencils and good quality ink. c) sorting and loading of empty bags for the rejected lot after inspection by the committee. d) shifting of branded bags from godown to packer floor and supply bags to packer operator. e) packer operation for loading of trucks/wagons and bulk loading of tankers with related activities etc. f)loading of cement bags in countable position with proper stacking in to trucks &wagons. g) check weighment of filled cement bags during operation periodically, record keeping for the same and performing adjustment of mechanical packers as per requirement to ensure no trucks will be detained with weight variation. h) cement extraction from silos for bulk loading & loading of cement bags in trucks/wagons with proper stacking. ensure extraction chutes free from jamming time to time. i) housekeeping the packing plant premises such as wagon loading platforms, truck loading area, gallery belts area, silo bottom, elevator pits. spilled cement & foreign material accumulated at hopper floor (screen floor) should be cleared time to time to avoid jamming of packers while in operation. cleaning of bulk loading weigh bridge on daily basis and keep it always in good operational condition. j) hand filling of spilled cement accumulated at all beltconveyor drive area, loading chutes, wagon loading platforms and at truck loading ground floor and re bagging of cut & torn cement bags fell down from the conveyorbelts. head loading of the hand filled bags and good condition bags laid down if any on daily basis to avoid accumulation of spilled cement and bags. k) opening / closing of wagon doors along with proper sealing activity as per standard and cleaning of wagons before starting the loading. l) packer machines, feed valves and bucket elevators routine maintenance and breakdown maintenance. m) skilled fitter should be available in a, b, c and general shifts for maintenance. n) basis of operation shall be rate / mt however the contractor should engage own and adequate man power for smooth operation as per scope of work mentioned above. o) contractor ensures that to load different grades of cement in the same truck as per dc sent by marketing dept. p) contractor ensure to run 3nos packers for truck loading and 5nos.packers for wagon loading.