Web Analytics Made Easy - StatCounter

Cooling Machine Scrap Tenders

Get complete information related to latest Cooling Machine Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cooling Machine Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cooling Machine Scrap Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :40097609 Due date: 24 May, 202524 May, 2025 NA
Tender For bid to ras corrigendum : provision of spl infra items for ae cabelway - cement , steel (structural steel & tmt) , pre colour coated plain galvanized iron sheet (ppgi) with zinc coating 120gm , pre-profiled polycarbonate sheet , cgi/pgi sheet 24 guage , puf panels , aluminum sections for door/window/frames/ partitions , glazed ceramic tiles/non- skid ceramic tiles/ vitrified tiles , aluminum extruded alloy fittings for aluminum doors/ windows/ puf panel doors , m/s builders hardware , mortice lock , diesel generator set (air cooled above 3.5kva upto 15 kva) , diesel generator set (liquid cooled above 15 kva) , generator set (portable) (below 3.5 kva) , submersible pumps/ motor with starters , motor starters , multi strand copper wires , lt electrical cable 1100 volts, xlpe , electrical fittings , mcb/mccb/db/is olators/ change over switch , cfl fittings/ lamp , led fittings/ lamp & led tube light and accessories , halogen lamp , led solar lights / led solar lantern , led street light & accessories , wall mounted heat blowe , electrical exhaust fan/ extractor fan/ventilator fan , fire extinguisher , smoke alarm , water heating device (electric) (geyse , steel tubular poles (swaged) , pvc casing capping , pvc conduit pipe circular , solar panel , solar hybrid wind turbine , solar hybrid pcu/invertor , battery lithiumion/lithium phosphate , battery lead acid , voltage stabilizer , cp sanitary , fittings/ bathroom , cabinets , vitreous china , sanitary , appliances/fittings , english wc/ wash , basin etc) , ppr pipes & , accessories , water closet seat , cover , pvc flushing , cistern , hdpe water , storage tank , puf tank , frp septic tank , stainless steel , sink , looking mirror / , glasses (plain / , head / frosted) , toughened glass , pvc pipes , including fittings , standard wide , gauge pipes , stainless steel , western commode , stainless steel , wash basin , mattress, pvc furniture (chair), office furniture, steel almirah, ply wood/ pre, laminated particle, board/ fibre board, (medium density)/ teak, face ply, laminated sheets, adhesive, power tools, hand tools, synthetic enamel, paint/printer, oil bound distemper /, cement based paint, plasticized polyvinyl, chloride - upvc, (windows, doors), wooden door, ply board /ply wood, false ceiling, quick setting, compound, magnetic hinges, turbo vent, bain marie, hamam 1kl with motor, gate valves, chemical earthing, flame proof light fitting, hydraulic door closure, spring, ci manhole cover /, frame, steel wire rope, insulation (puf) for, pipes, electrical chimmney, sheet metal enclosure, and lt panel, kero heater, bukhari (field heating, device), loft tank

Central Government/Public Sector

CTN :40330400 Due date: 04 Jun, 202504 Jun, 2025 2.27 Crore
Tender For tender for supply of operation of water cooled centralised ac plant of 3x330 tr trane make and all associated ancillary equipments and ventilation fans etc. round the clock in 3 shifts on all days iincluding sundays and holidays by deputing supervisor , shift in-charge or skilled , semi skilled manpower etc. complete as required and as per enclosed detailed specifications. for first year , operation of water cooled centralised ac plant of 3x330 tr trane make and all associated ancillary equipments and ventilation fans etc. round the clock in 3 shifts on all days including sundays and holidays by deputing supervisor , shift in-charge or skilled , semi skilled manpower etc. complete as required and as per enclosed detailed specifications.for second year , comprehensive maintenance contract for the centralized air-conditioning system consists of 330tr water cooled chiller units (trane make)-03 nos. , chilled water pumps primary pumps (kirlosakar make)-3 nos. and secondary pump (grundfoss make)- 3 nos. with vfd drive panel , condenser water pumps (crompton make) - 3 nos. , cooling towers (advance make)-3 nos. , chilled water and condenser water lines , air handling units (floor mounted and ceiling suspended) (zeco make) with starter panels - 27 nos. power and control panels and its associated equipments like bearings , v-belts , canvas , valves (excluding the butterfly valves) , strainers , dampers , diffusers , grills , nozzles , thermostats , switchgears in control panels(excluding the power cables) , ventialation fans of toilets , electrical meters , contactors , timers etc. complete as required for smooth operation of the complete hvac system. the scope of work also includes carrying out the periodical maintenance/checking of the above equipments & maintenance of water softening plants along with supply of salt for operation as per manufacturers recommendations and/or as per the attached technical conditions. for first year , comprehensive maintenance contract for the centralized air-conditioning system consists of 330tr water cooled chiller units (trane make)-03 nos. , chilled water pumps primary pumps (kirlosakar make)-3 nos. and secondary pump (grundfoss make)- 3 nos. with vfd drive panel , condenser water pumps (crompton make) - 3 nos. , cooling towers (advance make)-3 nos. , chilled water and condenser water lines , air handling units (floor mounted and ceiling suspended) (zeco make) with starter panels - 27 nos. power and control panels and its associated equipments like bearings , v-belts , canvas , valves (excluding the butterfly valves) , strainers , dampers , diffusers , grills , nozzles , thermostats , switchgears in control panels(excluding the power cables) , ventialation fans of toilets , electrical meters , contactors , timers etc. complete as required for smooth operation of the complete hvac system. the scope of work also includes carrying out the periodical maintenance/checking of the above equipments & maintenance of water softening plants along with supply of salt for operation as per manufacturers recommendations and/or as per the attached technical conditions. for second year , painting of hvac system such as pumps , cooling tower- motors , pedastal and other equipments by removal of corrosion with sand paper and painting with corrosion resistant paint to match the adjoining areas for maintaining the equipment in good and non rusting condition. for first year , painting of hvac system such as pumps , cooling tower- motors , pedastal and other equipments by removal of corrosion with sand paper and painting with corrosion resistant paint to match the adjoining areas for maintaining the equipment in good and non rusting condition. for second year , repairing damaged insulation of exposed ac ducts by scrapping and cleaning the surface , applying cold bitumin or adhesives , supplying and fixing of 50mm thick thermo coal sheet (eps) and wraped canvas clothes with suitable self adhesive as per the specif
 Loading, Please wait...

Connect us via What's Up