Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For corrigendum : supply of supply of spares for 70 mva areva make generator transformers : - oil circulating pump motor set , online moisture monitoring sensor , transformer m kiosk annun panel 12 point , transformer m kiosk annun panel 8 point , ct ratio 350by1acc class5p20 , ct ratio 350by1acc class 1by2 , ct ratio 350by1 acc class x , current transformer wtict2 , current transformer wtict1 , oti with 2-sets of contacts , 250mm dia magnetic oil level guage , temperature transducer pt-100 sensor , temperature transducer pt-100 for oti , flexible separator main tank conservator , silica gel breather main tank conservator , silica gel orange spherical type , globe valve- 15 bore , globe valve- 25 bore , gate valve- 50 bore , gate valve- 100 bore , gate valve- 25 bore , butterfly valve- 50 bore , butterfly valve80 bore , butterfly valve- 100 bore , non return valve- 100 bore , isolating valve , cooler drainpipe valve , under and over voltage , o-ring for valve 100 bore pipe , o-ring for valve 80 bore pipe , o-ring for valve 50 bore pipe , o-ring for valve 25 bore pipe , o-ring for valve 15 bore pipe , rubber cord 19 mm thickness , rubber cord 10 mm thickness , rubber cord 8 mm thickness
Tender For corrigendum : supply of various spares for beml make be-71 hydraulic excavators at chp site of sstps, suratgarh for the year 2025-26 - radiator & oil cooler assy, part no. 790ec02018, air cleaner assy. no.790ei02026, idler assy , part no.790tf02029, sprocket, part no. 799tf02012, hose assy , part no. 799ph98257, hose assy., part no. 799ph98395, hose assy, part no. 799ph98151, hose assy , part no. 799ph98419, hose assy , part no. 799ph98232, hose assy , part no. 799ph98249, hose assy, part no. 790ph94003, hose assy , part no. 799ph96029, hose assy , part no. 799ph96037, hose assy, part no. 782ph95104, hose assy. , part no. 799ph02821, hose assy., part no. 799ph98313, hose assy., part no. 799ph98338, hose assy. , part no. 799ph98346, hose assy, part no. 282ph93339, hose assy , part no. 799ph98216, hose assy , part no. 799ph98281, hose assy. , part no. 799ph98273, hose assy. , part no. 799ph98305, hose assy., part no. 799ph98298, hose assy , part no. 799ph98208, revolving frame , part no. 799rf02009, slewing ring 790 so 02019, arm link, part no. 799 bh 2018, hose assy , part no.799ph98216, track chain assy., part no. 790tf02053, swing drive, part no. 799hs02934, hose assy , part no. 782ph93355, key switch partv no. cek0120000, water temp. gauge 155ip81084, hose assy. part no. 799ph98476, hose assy. part no. 799ph98451, hose assy. part no. 799ph98402, strainer part no. 155ph02025, hose assy. part no. 799ph98249, hose assy. part no. 799ph98257, hose assy. part no. chh0330806, elbow part no. 790ph02579, hose assy. part no. 799ph94003, hose assy. part no. 799ph96029, hose assy. party no. 782ph95104, hose assy. part no. 782ph93339, hose assy. part no. 799ph98216, hose assy. part no. 799ph98281, hose assy. part no. 799ph98265, acc. cable part no. 125co02005, bolt cf b0161690, cleaner hose part no. 790ei61002, pipe assy. part no. 799ph02887
Tender For supply of mt spares e e - oil cooler transmission lv7 t 815 , axl nut lv7 tmb , belt timing lv7 stln , cable assy control lv7 stln , fuel flexible pipe lv7 tata
Tender For tender for supply of spares of fluidomat make fluid coupling scoop type and traction type for chp ktps c c - spherical bush , o-21 .for scoop coupling (sc-10) , bolt , nut & spring washer set (part no h-27 , h-28 & h-64) for flexible coupling( o/p side) , sc-10 , bolt , nut & spring washer set (part no h-1 , h-2 & h-3) for flexible coupling( i/p side) , sc-10 , spherical bush , i-22 .for scoop coupling (sc-10) , oil cooler assembly-fluid coupling , model- sc 10 (make- fluidomat) , oil cooler valves for scoop coupling , model sc - 10 , flexible disc o/p side( part no o-18) for scoop coupling sc-11 , flexible disc i/p side( part no i-23) for scoop coupling sc-11 , spherical bush , o-21 for scoop coupling(sc-11) , spherical bush , i-22 for scoop coupling(sc-11) , bolt , nut & spring washer set (part no h-27 , h-28 & h-64) for flexible coupling( o/p side) , sc-11 , bolt , nut & spring washer set (part no h-1 , h-2 & h-3) for flexible coupling( i/p side) , sc-11 , oil pump without motor for scoop coupling model no.- sc-11 , flexible disc o/p side( part no o-18) for scoop coupling sc-11a , flexible disc i/p side( part no i-23) for scoop coupling sc-11a , spherical bush , i-22 for scoop coupling(sc-11a) , spherical bush for scoop coupling model-sc-11a , part no- o-21 , bolt , nut & spring washer set (part no h-27 , h-28 & h-64) for flexible coupling( o/p side) , sc-11a , bolt , nut & spring washer set (part no h-1 , h-2 & h-3) for flexible coupling( i/p side) , sc-11a , oil pump with out motor part-103b for s.coupling sc-11a , oil filter element of scoop type fluid coupling model no.- sc-11a , flexible coupling set i/p side( part no i-1 & i-26) for scoop coupling sc-14 , for scoop coupling of conveyor drive output side spherical bush for sc-14 , output side flexible disc assembly , o-18 for scoop coupling(sc-14) , flexible coupling set o/p side ( part no o-7 &o-22) for scoop coupling sc-14 , bolt , nut & spring washer set (part no h-27 , h-28 & h-64) for flexible coupling( o/p side) , sc-14 , for scoop coupling of conveyor drive input side spherical bush for sc-14 , flexible disc i/p side( part no i-23) for scoop coupling sc-14 , oil pump part-103b for s.coupling sc-14(for crusher) , bolt , nut & spring washer set (part no h-1 , h-2 & h-3) for flexible coupling( i/p side) , sc-14 , oil cooler assembly-fluid coupling , model- sc 14 (make- fluidomat) , ref. drawing. no. pr/d/6429 , fusible plug with o-ring on impeller , part no.- i-6 , for model no.-hfdx-9 , flexible disc assembly , 2 & 29 for fluid coupling- model no--hfdx-9 , set of bolts , nuts , spring washer for o/w and i/w side flexible coupling , o/wh-50 , 51 , 52 i/wh-72 , 73 , 74 for fluid coupling- model no--hfdx-9 , fluid coupling (complete) , model no.- hfdx-9 , make - m/s fluidomat , set of spherical bushes for o/w and i/w side flexible coupling of fluid coupling , model- hfdx-9 , part no. 32 & 5 , set of flexible couplings (i/p & o/p side) of fluid coupling model- hfdx-9 installed at boom conveyor , set of flexible couplings (i/p & o/p side) of fluid coupling model- hfdx-9 installed at conv. 7a/b , 8a/b , 9a/b , set of flexible couplings (i/p & o/p side) of fluid coupling model- hfdx-9 installed at conv. 6a/b , set of flexible couplings (i/p & o/p side) of fluid coupling model- hfdx-9 installed at conv. 2a/b