Get complete information related to latest Crank Pin Bearing Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Crank Pin Bearing Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Crank Pin Bearing Tenders.
Tender For job work and supply of centrifugal machine spares for season 2025-26 - new/replacement item, replacement of supporting linear., new ss feed pipe., new distributor of basket., basket clamp sand bolts., new acc up bolts & including drilling tapping at broken bolt position., new nozzle pipe., two sets u type rubber buffers (02 set)., 3 sets basket new clits., jobworks/repairing, basket ovality checking., basket alignment checking., basket balancing., checking of basket bore to maintain standard sizes., bfw-nk-1503 centrifugal machine no.02, new/replacement item, replacement of supporting linear., replacement of distributor cap., new pinfor distributor., new grease gun., feed pipe flange to be changed. top cover holes to be rectified after welding and drilling., jobworks/repairing, basket balancing., distributor balancing., checking of basket bore to maintain standard sizes., bfw-nk-1503 centrifugal machine, new/replacement item, new mixture of distributor., jobworks/repairing, ovality checking and repair of distributor., distributor balancing., bfw-nk-1503 centrifugal machine no.03, jobworks/repairing, checking of basket bore to maintain standard sizes., basket balancing., distributor balancing., bfw-nk-1503 centrifugal machine no.04, new/replacement item, new pin for distributor., feed pipe flange to be changed. top cover holes to be rectified after welding and drilling., jobworks/repairing, basket balancing., distributor balancing., ovality checking and repair of distributor., bearing housing bearing sizes to be reconditioned to standard sizes., bracket pulley bore to be reconditioned to standard sizes., cfw-wk-1500 centrifugal machine no.02, new/replacement item, replacement of supporting linear., jobworks/repairing, basket balancing., distributor balancing., cfw-wk-1500 centrifugal machine no.04, new/replacement item, replacement of supporting linear., basket clamps and bolts., new acc up bolts & including drilling tapping at broken bolt position., jobworks/repairing, basket balancing., distributor balancing., kcp 1350 c/f machine no.01, jobworks/repairing, basket balancing., distributor balancing., checking of basket bore to maintain standard sizes., bearing housing bearing sizes to be reconditioned to standard sizes., acc up checking and repairing to standard sizes., basket checking and repairing.
Tender For supply of mt spare c c - left side mirror , air compressor pipe , wheel cyl left and right , tail light left and right , wheel nut , sleave cylinder , front wheel cylinder repair kit , wiper blade , sleave cylinder repair kit , master cylinder , radiator hose pipe l type , brake fluid container , radiator return hose pipe , indicator left and right , clutch cylinder repair kit , clutch plate , release bearing , centre bol rod spring , steering gear box oil seal , door handle , hood lamp , right side indicator mudguard , dual brake valve repair kit , starting relay , side mirror left and right , fly wheel position sensor , air cleaner assy , side mirror , fog lamp , gear box housing , gear box outer flange oil seal , clutch cylinder , head light , fog light assy , isolator switch , dvr carbine shock absorber , front left and right indiactor , gear leaver , gear leaver bush repair kit , rear door beeding , rear door lock , horn 12v , ac button , raditor cap , ignition coil with cable , head light holder right side , fog light assy led , tail light , door glass handle both side , door catch right side inner , door lock stopper , fuel pump motor , rear door lock with outer cover , eng dipstick eng oil measurement , all suspension bush ) /bid number : gem/2025/b/6420817 * /dated: 05-07-2025 & & / bid document 1 / 42
Tender For tender inviting item rate for repairing of various types of motor pumps and starter for year 2024-25 shujalpur - centrifugal motor pump 150hp repairing, rewinding with material, centrifugal motor pump 150hp replacement of end bearing, centrifugal motor pump 150hp replacement/repair of impeller, centrifugal motor pump 150hp replacement/repair of rotor shaft, centrifugal motor pump 150hp replacement of pump shaft bush,gland, rubber packing, centrifugal motor pump 150hp thread making in plate/stud/nut bolt, centrifugal motor pump 150hp side plate repairing, centrifugal motor pump 150hp replacement of fan/fan cover, centrifugal motor pump 150 hp change of connection plate, centrifugal motor pump 150hp rotor bearing sheet, centrifugal motor pump 150hp housing sheet repair per item, centrifugal motor pump 150hp new pulli pair per item, centrifugal motor pump 150hp coupling bolt with wiser per item, centrifugal motor pump 150hp air key per item, centrifugal motor pump 150hp pump bearing per item, centrifugal motor pump 150hp rubber star per item, centrifugal motor pump 150hp opening,fitting, lath work and testing charge etc, centrifugal motor pump 40hp repairing, rewinding with material, centrifugal motor pump 40hp replacement of end bearing, centrifugal motor pump 40hp replacement/repair of impeller, centrifugal motor pump 40hp replacement/repair of rotor shaft, centrifugal motor pump 40hp replacement of pump shaft bush,gland, rubber packing, centrifugal motor pump 40hp thread making in plate/stud/nut bolt, centrifugal motor pump 40hp side plate repairing, centrifugal motor pump 40hp replacement of fan/fan cover, centrifugal motor pump 40 hp change of connection plate, centrifugal motor pump 40hp rotor bearing sheet, centrifugal motor pump 40hp housing sheet repair per item, centrifugal motor pump 40hp new pulli pair per item, centrifugal motor pump 40hp coupling bolt with wiser per item, centrifugal motor pump 40hp air key per item, centrifugal motor pump 40hp pump bearing per item, centrifugal motor pump 40hp rubber star per item, centrifugal motor pump 40hp opening,fitting, lath work and testing charge etc, monoblock motor pump 20hp repairing, rewinding with material, monoblock motor pump 20hp replacement of end bearing, monoblock motor pump 20hp replacement/repair of impeller, monoblock motor pump 20hp replacement/repair of rotor shaft, monoblock motor pump 20hp replacement of pump shaft bush,gland, rubber packing, monoblock motor pump 20hp thread making in plate/stud/nut bolt, monoblock motor pump 20hp side plate repairing, monoblock motor pump 20hp replacement of fan/fan cover, monoblock motor pump 20 hp change of connection plate, monoblock motor pump 20hp rotor bearing sheet, monoblock motor pump 20hp opening,fitting, lath work and testing charge etc, monoblock motor pump 15hp repairing, rewinding with material, monoblock motor pump 15hp replacement of end bearing, monoblock motor pump 15hp replacement/repair of impeller, monoblock motor pump 15hp replacement/repair of rotor shaft, monoblock motor pump 15hp replacement of pump shaft bush,gland, rubber packing, monoblock motor pump 15hp thread making in plate/stud/nut bolt, monoblock motor pump 15hp side plate repairing, monoblock motor pump 15hp replacement of fan/fan cover, monoblock motor pump 15 hp change of connection plate, monoblock motor pump 15hp rotor bearing sheet, monoblock motor pump 15hp opening,fitting, lath work and testing charge etc, monoblock motor pump 10hp repairing, rewinding with material, monoblock motor pump 10hp replacement of end bearing, monoblock motor pump 10hp replacement/repair of impeller, monoblock motor pump 10hp replacement/repair of rotor shaft, monoblock motor pump 10hp replacement of pump shaft bush,gland, rubber packing, monoblock motor pump 10hp thread making in plate/stud/nut bolt, monoblock motor pump 10hp side plate repairing, monoblock motor pump 10hp replacement of fan/fan cover, monoblock motor pump 10 hp change of connection pla
Tender For re babbiting-dismantling of bearings and pads from housing,rebabbiting of 10 nos tgb thrust pad along with all accessories,rebabbiting of turbine guide bearing, mid bearing & end bearing along with floating seals and all accessories,material composite test, ut test and dp test should be done for re-babbitted material,assembly of re-babbited bearings with blue match,submitting the video graphs of re-babbiting and reports of re-babbiting.re-alignment-the reason for shifting of generator shaft by 2 to 3 mm shall be analyzed and rectification works needs to be carried out,complete dismantling, assembling, painting and re-alignment of machine shaft,inspection of turbine shaft journal surface and repairs if required,inspection/replacement of worn out bushes and seals of guide vane, if necessary,inspection and repair of labyrinth ring, face plates, guide vanes and runner,guide vanes bed setting,tgb water cooler descaling work to improve the efficiency of cooler,complete assembly of machine,checking the magnetic axis of the generator and to ensure its alignment, checking of the unit leveling at all places and complete alignment of machine shaft,testing & commissioning of complete machine,painting of entire machine,checking of vibration & site balancing of machine,submission of vibration, balancing & alignment reports.flow switch-supply and installation of flow switch (flow rate110 lpm) along with 01 no 01 nc contact for inlet and outlet lubrication oil pipelines,supply and installation of pressure switch (30bar) for inlet and outlet lubrication oil pipelines,supply and installation of level switch for in tgb oil sump.replacement of new miv trunion shaft-dismantling of miv counter weight, miv servomotor assembly, and other related parts,lifting of miv from the bed,transportation of miv to the firms place, if required,replacing old nitrile rubber trunnion seals with existing profile by new one on both sides,replacements of miv trunnion shaft. providing of necessary drawings,material composite test, ut test and dp test should be done for new trunnion shaft & trunnion seals, bushes etc,all related fasteners and dowel pin to be replacing by new one,drive and non drive end trunnion bush, cupseals, stop end plate, washer ring etc need to be replacing by new one,repair of miv discand main body to be attended, if required,supply and replacement of miv disc rubber seal,pressure testing and commissioning should be carried out as per standard in presence of kpcl engineers,all tools & tackles required for the above mentioned works shall be arranged by contactor only.