Get complete information related to latest Cross Staff Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cross Staff Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cross Staff Tenders.
Tender For corrigendum : supply of pull rod dia 25 mm with hex nut m-24, qty-02 no's rh & 02 no's lh for each rod and turn buckle for hand brake arrangement for slr coaches with bogie mounted brake system item description and quantity in one set as per annexure-a. (drg. sketch k-1034. item no.- 1,2,3,4,5,17,18 & 19). [ warranty period: 30 months after the date of delivery ]
Tender For repairs and maintenance work of goliath crane 16 mt, repairing air vent pipe, providing under water divers for water leakage proofing to stop log gate and slot for replacing of damaged turn buckle, wire rope and rubber seal and providing and fitting
Tender For corrigendum : aden-falna sub division-supply of potable drinking water through road tankers at various level crossings, staff quarters & stations in jurisdiction of aden/falna (for the period of 24 months).
Tender For corrigendum : supply of turn buckle set in assembled condition as per rdsos drg no. wd- 92081-s-57. one set comprising of clevis m-39 eye bolt and turn buckle (item no. 3,7 and 9 respectively). [ warranty period: 30months after the date of delivery ]
Tender For dismantaling of damaged turn buckle assembly and equiliser bracket assembly re placing by new one of 36 mt cap hoist for radial gate mtr gate no 17 to 41 dismantling and replacing water lubrication system repair and maintenance job at ujjani dam - name of work - dismantaling of damaged turn buckle assembly and equiliser bracket assembly replacing by new one of 36 mt cap hoist for radial gate 12 x 6.5 (+0.5) mtr gate no. 17to 41, dismantling and replacing water lubrication system, repair and maintenance safety cage for divide wall ladder and other allied work, services etc. all complete
Tender For corrigendum : supply of double part endless wire rope sling - as per tablea of atc and specification , supply of sling with both end reeving, 6 x 37 fibre core construction -as per table-a of atc and sp , hp turbine turn buckle of min. 10 tonnes swl as per table-a of atc and specification , lp turbine turn buckle of min. 40 tonnes swl -as per table-a of atc and specification