Get complete information related to latest Damper Bracket Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Damper Bracket Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Damper Bracket Tenders.
Tender For supply of brass fasteners as per the specification e e-- brass nut 10 mm bsp for gas collecting device with 9. 7 mm , brass round head screw m4 30 mm , brass round head screw 3 by 16 inch cross 1 by 2 inch , brass round head screw 3 by 16 inch cross 3 by 4 inch , brass round head screw 1 by 4 inch x3 by 4 inch , brass hex nut 3 by 16 inch bsw , brass hex nut 1 by 4 inch bsw , brass nipple 1 by 4 inch x 3 by 8 inch bsp , brass petcock 10 mm , g i full threaded rod m12x1000 long
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - urja sanchay; h057 both life rafts slider locking mechanism angle plate deteriorated and thinned 02 nos angles plate to be renewed as per sample mat ms holes to be drill..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - urja sanchay; h 058 sme breather pipe 20 cm above main deck deteriorated and cracked same has been cold repaired to prevent ingress of splashing water pipe dia 50 mm mat..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - urja sanchay; h 059 galley sliding door guider channel uprooted guider channel to be renewed as per sample mat ss; service provider,repair, maintenance, and installation of plant/ systems/equipments (version 2) - urja sanchay; h 060 ships toilet drain pipe and fasteners deteriorated and thinned pipe dia 25 mm mat ms length 50 mtrs along with fasteners qty 04 nos mat ss to be rene..
Tender For corrigendum : scope of work:1. insertion of log gate & screen removal & cleaning.2. preparation and fabrication of necessary arrangement for maintenance of back-up acw, fire hydrant /spray and raw water pumps.3. decoupling of pump and motor, removal of motor skirt and shifting of motor from skirt.4. dismantling of thrust bearing and bearing housing.5. dismantling of complete column pipes, enclosure pipe, shafts, impellers etc.6. complete dismantling of back-up acw, fire hydrant /spray and raw water pumps.7. issue and shifting of spares from store to the site.8. repairing and replacement of worn out parts and d.p. test of spare parts, impellers, shaft and sleeves, bearing housing etc.9. cleaning of all column pipes and enclosure pipe and painting with black paint.10. painting of top column pipe, motor skirt & motor with blue/smoke gray colors. painting of bearing cooling water line and discharge pipe of back-up acw, fire hydrant /spray and raw water pumps with green paints.11. assembly of pump as per oem guideline and shifting of motor on its skirt.12. alignment checking of pump and motor coupling.13. coupling of the pump after motor trial.14. removal of log gate after screen fixing. 15. commissioning of the pump & trail. terms and conditions: 1. the contractor shall have to arrange all men, machine, t&p, consumable, dp test kit including entire qty. of blue/green/ black bituminous paints of shalimar/berger/asian brand at their cost. 2. completion period: within 8 days for each pump from the date of handling over.3. payment terms: 100% payment shall be released after successful overhauling and commissioning of each pump, within 45 days.4. penalty terms: penalty shall be imposed @ rs. 1000/- per day or part thereof due to delay in work but limited to 10% of order value if delay in completing the work.5. mobilization period: firm has to mobilize his team & t&p for start of work within 7days after intimation from engineer-in-charge otherwise penalty @ rs. 500/- per day shall be imposed till start of work.6. guarantee: complete overhauling work is to be guaranteed for minimum 06 months against spurious paints and poor workmanship.7. the contractor will have to provide all necessary safety appliances to his workers engaged and he will be fully responsible for safety of his workers.8. contract period one year. scope of supply(a) cspgcl scope:1. spares of above pumps, fasteners will be provided by cspgcl kw.2. eot crane, compressed air, electricity, water will be provided by cspgcl free of charge.3. workshop facility shall be provided by cspgcl kw.(b) contractors scope:1. all men power, tools tackles, chain pulley block, measuring instrument, welding machine, cutting set, grinders consumable material rustolene, welding electrode, grinding stone, teflon tap, paints etc. shall be arranged by contractor.2. crane operator will be arranged by contractor. executive engineer (tmd-ii, bop) 1x500 mw, cspgcl, htps, kwb