Get complete information related to latest Data Acquisition Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Data Acquisition Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Data Acquisition Tenders.
Tender For corrigendum : supply installation commissioning maintenance of sensors dataacquisitiondata transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Tender For corrigendum : supply of w96716155910 drg: 31611770098 rev: 00 condenser air evacuation package (vacuum pump) 30scfm , w96716155317 drg: - rev: 00 complete vacuum pump (bare shaft vacuum pump) spec: he57016 rev: 04 , w96716155325 main motor for vacuum pump spec: he57016 rev: 04 , w97716155067 bearing for motor of vacuum pump (30 scfm) (1set= 2nos) spec: he57016 rev: 04 size: to s , w97716155822 pressure transmitter for vacuum pump system: 0-1 bar abs spec: he57016 rev: 04 , w96716155813 level transmitter for vacuum pump spec: he57016 rev: 04 , w96716155244 drg: 31611770051 rev: 00 temperature transmitter for vacuum pump spec: he57016 rev: 04 , w96716155210 drg: 31611770047 rev: 00 differential pressure switch for vacuum pump. spec: he57016 rev , w96716155490 flow indicator cum switch for vacuum pump spec: he57016 rev: 04 , w97716155466 temperature gauge 0-100 deg c, for vacuum pump heat exchanger size: 0 to 100 deg c , w97716155733 drg: to suit original supply rev: 00 pressure gauge (0 to -1 bar) , w97716155741 drg: to suit original supply rev: 00 pressure gauge (service water) , w97716155547 level gauge for vacuum pump separator tank spec: he57016 rev: 04 size: to suit original , w96716155457 differential pressure gauge for vacuum pump package duplex filter spec: he57016 rev: 04 , w97716155849 drg: to suit original supply rev: 00 air flow meter (rotameter) for vacuum pump system s , w97716155679 complete solenoid valve assembly for air control system (process inlet) spec: he57016 r , w97716155660 complete solenoid valve assembly for seal water make-up spec: he57016 rev: 04 , supervision of commissioning lump sum per man day charges at site, including every expense at our si , supervision of commissioning lump sum per visit charges (to &fro) including travelling time & all ex
Tender For corrigendum : providing of custom bid for services - comprehensive second annual maintenance services contract annual maintenance contract for the test firing control dataacquisition system other details as per attached specification
Tender For bid to ras custom bid for services - job work for preparation of functional filler materials, surface modification and paint formulation , custom bid for services - job work for study, design evaluation and certification requirements of special coatings to be applied on skin of airborne platform-1. preparation of microwave absorbing metal flakes powder , weighing and loading of raw metal powder in attritor mill along with steel balls and its operation , high energy milling of powder along with process control agent and regular monitoring during operation , i. , ii. , iii. , iv. , v. , weighing and packaging of powder in air tight container , vi. , vii. , un loading of powder from attritor mill on to trays and drying in room temperature , separation of powder from steel balls through sieving , regular cleaning of the machine and equipments related to above job works preparation of 5 kg of metal flakes per month , 2. surface modification of metal flakes powder , i. reaction for coating of oxide material on iron metal flakes , ii. , iii. , filtration and washing of powder , drying and packing of powder , 3. formulation of radar absorbing paint , i. , ii. , iii. , iv. , cleaning of bead mill by using solvent , modification of resin system by blending of different resins , formulation of paint by using filler material as per requirement , testing of drying time, flexibility, degree of fineness for quality check , 4. preparation of test specimen , i. cleaning of test panels (aluminium, mild steel and composites) , ii. , iii. , iv. , v. , primer application, followed by surface preparation through emery paper and solvent , application of radar absorbing paint to achieve desired thickness , prepare test panels of different sizes (100 mm x 100 mm) as per requirement application of polyurethane top coat , 5. other terms and conditions: , i. , ii. , iii. , iv. , v. , payment will be made on monthly basis after completion of job based on user job completion certificate , duration of job work: two years , the service provider should have prior experience of executing technical job work contracts in any of government department of r & d in government of india. copy of relevant supply order to be enclosed with the bid. , irrelevant supply orders pertaining to civil works, construction, security, maintenance and arboriculture will not be considered. , the contract may be extended further based on satisfactory services of service provider on same terms and conditions, if required by buyer. , this job work will be carried out at defence laboratory, jodhpur. , many shay , , scope of work , job work to study, design evaluation and certification requirements of special coatings to be applied on skin of airborne platform , (1) following scope of job work will be carried out under the supervision of rcma nashik , on monthly basis at rcma nashik. , i. , ii. , literature survey about latest and advance materials and technologies in the field of radar signature suppression of airborne targets , evolving the approach and strategies for airworthiness certification of special coating. iii. scrutiny of the airworthiness certification plan (acp), system requirements, , integration, technical specification etc. , iv. verification of the characterisation mythologies of special materials. , v. , verification and validation of process control documents and various design documents. vi. verification and validation of cfd analysis of aircraft with different flight regions. , vii. verification and validation of erosion, wear and tear analysis of coated airborne target. viii. scrutiny of documentation requirements for system level coating application and , subsequently flight evaluation. , ix. , study of rcs reduction after application of coatings by using simulation and modelling through matlab software. , (2) other terms and conditions: , i. , ii. , iii. , iv. , v. , payment will be made on monthly basis after completion of job based on user job completion ce